§ 51.83 — PUBLICATION OF USERS IN SIGNIFICANT NONCOMPLIANCE
Municipal Code, City of Rio Rancho, New Mexico (Code 2026-04-23) · Rio Rancho Municipal Code § 51.83
Corpus is an independent public-information project, not the official City of Rio Rancho website. Stable reference: corpuslaw.us/code/e8c9d010-fb1c-4ae9-b250-42574ea4d5c0
§ 51.83: PUBLICATION OF USERS IN SIGNIFICANT NONCOMPLIANCE.
The city shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdiction served by the city, a list of the users which, at any time during the previous 12 months, were in significant noncompliance with applicable pretreatment standards and requirements. The term SIGNIFICANT NON-COMPLIANCE shall be applicable to all SIUs, or any other industrial user that violated subsection (C), (D) or (H) of this section. SIGNIFICANT NONCOMPLIANCE shall mean: (A) Chronic violations of wastewater discharge limits, defined here as those in which 66% or more of all the wastewater measurements taken for the same pollutant parameter during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits (40 CFR 403.3(l)); (B) TRC VIOLATIONS, defined here as those in which 33% or more of all the wastewater measurements taken for each pollutant parameter during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement, including instantaneous limits multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease and 1.2 for all other pollutants except pH) (40 CFR 403.3(l)); (C) Any other violation of a pretreatment standard or requirement (daily maximum, long-term average, instantaneous limit, or narrative standard) that the Control Authority determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public (40 CFR 403.3(l)); (D) Any discharge of a pollutant that has caused imminent endangerment to the public or the environment or has resulted in the city’s exercise of its emergency authority to halt or prevent such a discharge; (E) Failure to meet, within 90 days after the scheduled date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance; (F) Failure to provide within 45 days after the due date any required reports, including baseline monitoring reports, reports on compliance with categorical Pretreatment Standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (G) Failure to accurately report noncompliance; (H) Any other violation(s), which may include a violation of BMP, which the Control Authority determines will adversely affect the operation or implementation of the local pretreatment program.
( Ord. 06-74 ; Am. Ord. 18-14 . Formerly 51.82 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.
