For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.
Black Friday: $25 off forming an LLC in any stateLLC formation, through Dec. 1.See the deal →

§ 4 — Permit application contents

Code of Ordinances of the City of Roswell, New Mexico (Codified through Ordinance No. 24-19, adopted November 14, 2024. (Supp. No. 16)) · Roswell Code of Ordinances, App. A, art. 58, § 4

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/5ae657be-8db3-468e-ae8a-98a0b26919c6

Sec. 4. - Permit application contents.

A. Applications shall contain documentation, drawings, or descriptions to demonstrate that the RAES is the least intrusive as reasonably possible. B. Applications for construction/installation of a new RAES shall contain, but may not be limited to, the information contained herein. Where certification is called for, such certification shall bear the signature and seal of a professional engineer and/or architect licensed in New Mexico. C. The application requirements may vary based on the type of facility and its location. Final determination of the specific information to be included with each application will be defined by the administrator, but will generally follow the established guidelines as set forth below. Permit applications may include, but not be limited to the following: 1. The name, address, and phone number of the applicant and property owner where the proposed renewable/alternative energy system will be located. 2. The postal address, legal description, and zoning designation of the property. 3. A scaled drawing showing the square footage of the property and all lot lines. 4. A written statement verifying the renewable/alternative energy system complies with state and federal rules and regulations. 5. A copy of the system installer's City of Roswell Business license, if pertinent. 6. Documentation that verifies ownership of or the right to occupy the site. 7. The number, type and design of the renewable/alternative energy systems. 8. Documentation, drawings or descriptions showing how the renewable/alternative energy system will visually impact neighboring properties. 9. A site plan which shall include: Location, size and height of proposed and existing structures; location, size and height of the system(s); landscaping, irrigation, and fencing; warning signage; electrical grounding and junctions to electrical service; and, the administrator can require applicant to have site plan certified in regards to structure or nature. 10. The proposed stealth applications for the RAES for aesthetic purposes. 11. Show how RAES shall be screened from the view from neighboring properties. 12. Certified structural drawings verifying that the RAE's foundation and attachments will be constructed to meet structural requirements for loads, including wind and ice. 13. Certified structural drawings and a soils report verifying that the existing structure or soil can handle the live and dead load of the proposed structure. 14. Documentation satisfying liability insurance requirements, for wind systems only. 15. Documentation demonstrating the need for the proposed height of the RAES. 16. Equipment specification sheets for the proposed system(s).

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.

Use the Roswell code through the API

This call searches the Roswell code. Change jurisdiction to the state's code to search its statutes and its cities, or to US for federal law. A free key gives 1,000 searches a month, and the MCP server works with no key.

curl -H "Authorization: Bearer $CORPUS_API_KEY" \
  "https://corpuslaw.us/api/v1/search?q=Permit+application+contents&jurisdiction=NM-ROSWELL"

Law search API · Docs · Get a free key · Connect the MCP server