For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.39.030 — Terms and conditions of permit

Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 13.39.030

Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/ea9b6f0c-4b90-4e46-9a4a-370da0e2a141

Section 13.39.030 - Terms and conditions of permit.

A. Duration of environmental control permits. Environmental control permits shall be issued for a specified time period not to exceed five years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. If the user is not notified by the public works director 30 days prior to the expiration of the permit, the permit shall be extended until such notice is made. The terms and conditions of the permit may be subject to modification and change by the public works director during the life of the permit as limitations or requirements as identified in Chapter 13.36 of this title are modified and changed. The user shall be informed of any proposed changes in his permit at least thirty days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. B. Permit conditions. Environmental control permits shall be expressly subject to all provisions of this title and all other applicable regulations, user charges and fees. Permit may contain, but are not limited to, the following: 1. The unit charge or schedule of user charges and fees for the wastewater to be discharged to a community sewer; 2. Limits on the average and maximum wastewater constituents and characteristics; 3. Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; 4. Limits, including best management practices, based on applicable general Pretreatment Standards in 40 CFR 403, categorical pretreatment standards, local limits, and State and local law; 5. Requirements for installation and maintenance of inspection and sampling facilities; 6. Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule; 7. Compliance schedules; 8. Requirements for submission of technical reports or discharge reports; 9. Requirements for maintaining and retaining records relating to wastewater discharge as specified by the public works director and affording city access thereto; 10. Requirements for notification to the public works director of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; 11. Requirements for the control and notification of accidental discharges, spills, and slug discharges; 12. Pretreatment of wastes before discharge; 13. Relocation of discharge points; 14. Prohibition of discharge of certain wastewater constituents; 15. Notification to the public works director of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater discharge; 16. Development of a compliance schedule for the installation of technology required to meet applicable pretreatment standards and requirements; 17. Other conditions necessary to accomplish the purpose of this title. The permit may include a time schedule which allows the discharger time to meet the conditions of the permit. The industrial/commercial discharger, who has been issued a permit, will be responsible for all costs required to comply with conditions of the permit. C. Change of permit terms and conditions. The public works director may change any or all terms and conditions of an environmental control permit for cause. The public works director shall specify a reasonable compliance period to comply with any required changes in the permit. D. Transfer of a permit. Environmental control permits are issued to a specific user for a specific operation. An environmental control permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation.

(Ord. 2536, § 8, Amended, 06/26/2017; Ord. 2503, Amended, 09/08/2014; Ord. 2420, Amended, 01/26/2009; Ord. 2291, Amended, 08/22/2005; Ord. 2186, Amended, 08/25/2003; Ord. 2043, Amended, 11/29/1999; Ord. 1421 § 22, 1983: Ord. 1283 § 9 (part), 1980)

Ask a question about Sparks law

Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.