§ 13.39.080 — Monitoring equipment construction and report requirements
Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 13.39.080
Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/8b7d9d00-1280-44d9-8b93-02a60b6dcabc
Section 13.39.080 - Monitoring equipment construction and report requirements.
A. Monitoring facilities and equipment. 1. Monitoring facilities and equipment may be required of any sewer user in order to allow inspection, sampling and flow measurement of the building sewer, or internal drainage system. 2. When more than one sewer user can discharge into a common building sewer, the public works director may require installation of a separate monitoring facility for each user. Also when, in the judgment of the public works director, there is significant difference in wastewater constituents and characteristics produced by different operations of a single user, the public works director may require that separate monitoring facilities be installed for each separate discharge. 3. Monitoring facilities that are required to be installed shall be constructed, operated and maintained at the user's expense. The purpose of the facility is to enable inspection, sampling and flow measurement of wastewaters produced by a user. 4. If sampling or metering equipment is also required by the public works director, it shall be provided, installed and operated at the user's expense. 5. The monitoring facility will normally be required to be located on the user's premises outside of the building. The public works director, however, may allow the monitoring facility to be constructed in the public street or public sidewalk area, when such a location would be required in order to enact a categorical pretreatment standard, or when a location on the user's premises as normally required is determined to be impractical, or cause undue hardship to the user. 6. If the monitoring facility is inside the user's fence, there shall be accommodations to allow safe and immediate access for city personnel, such as a gate secured with a city lock. There shall be ample room in or near such facility to allow accurate sampling and compositing of samples for analysis. The entire facility and the sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition by and at the expense of the sewer user. 7. Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the city's requirements. 8. When, in the judgment of the public works director an existing user requires a monitoring facility, the user will be so notified in writing. 9. Construction must be completed within 90 days following written notification unless a time extension is otherwise granted by the public works director. B. Monitoring reports. 1. Within 90 days following the date for final compliance with applicable discharge limitations, or in case of a new source following commencement of the introduction of wastewater into the city sewer system, any commercial/industrial discharger subject to such discharge limitations shall submit to the public works director a report indicating the nature and concentration of all pollutants in the discharge from the affected commercial or industrial establishment. a. The discharger's report will include reporting on the discharge from any regulated processes which are limited by the discharge limitations and the average and maximum daily flow from these process units in the user facility which are limited by such standards or discharge limitations. b. The report shall state whether the applicable limitations are being met on a consistent basis, and, if not, what additional operation and maintenance and/or pretreatment is necessary to bring the sewer user into compliance with the applicable limitations. c. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by public works director or the pretreatment standard necessary to determine the compliance status of the user. d. The submitted report will include the following certification signed by a duly authorized representative of the industrial user. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." 2. Any user subject to a discharge limitation after the compliance date of such discharge limitation, or, in the case of a new source after commencement of the discharge into the city's sewage collection or treatment facilities, shall submit to the public works director during the months of July and January, unless required more frequently by the public works director, a report indicating the nature and concentration of pollutants in the effluent which are limited by such discharge limitations. a. This report will include the following certification signed by a duly authorized representative of the industrial user. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. b. In addition, this report shall include a record of all daily flows which, during the reporting period, exceeded the average daily flow reported, as required under the permit. c. At the discretion of the public works director, and in consideration of such factors as local high or low flow rates, holidays, budgets and cycles, the public works director may agree to alter the months during which the above reports are to be submitted. d. The public works director may impose mass limitations on users which are using dilution to meet applicable discharge limitations or in other cases where the imposition of mass limitations is appropriate. In such cases, the report required by the above paragraphs shall indicate the mass of pollutants regulated by the discharge limitations in the effluent of the sewer user. These reports shall contain the results of sampling and analysis of the discharge, including the flow and nature of concentration, or production and mass, where requested by the public works director, of pollutants contained therein which are limited by the applicable pretreatment standards. e. The frequency of monitoring shall be prescribed in the environmental control permit. 3. Within 180 days after the effective date of a categorical pretreatment standard or the final administrative decision made upon a category determination submission under 40 CFR 403.6(a)(4), existing industrial users subject to such categorical pretreatment standards and currently discharging to or scheduled to discharge to the sanitary sewers shall submit a baseline monitoring report containing the information listed in 40 CFR 403.12(b). At least 90 days prior to commencement of discharge to the sanitary sewers, new sources subject to such categorical standards shall submit a baseline monitoring report containing the information listed in 40 CFR 403.12(b). A compliance schedule required as part of a baseline monitoring report shall meet the conditions of 40 CFR 403.12(c). 4. Industrial users shall notify in writing the public works director, and the hazardous waste authorities at the US Environmental Protection Agency and the State of Nevada, of any discharge into the sanitary sewers of any substance, which if otherwise disposed of, would be a hazardous waste under 40 CFR 261. This notification does not apply to pollutants already reported under the self-monitoring requirements of Section 13.39.080(B)(1,2,3) of this title. 5. All industrial users shall promptly notify the public works director in advance of any substantial chances in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous waste for which the industrial user has submitted initial notification under Section 13.39.080(B)(4). 6. If sampling performed by an industrial user indicates a violation, the user shall notify the public works director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the public works director within 30 days after becoming aware of the violations. C. Dischargers subject to federal reporting requirements shall maintain records of all information resulting from all monitoring activities. Such records shall be maintained in the dischargers' official business records for a minimum of three years and shall be made available for inspection and copying by the public works director. The required period of record retention may be extended during the course of any unresolved litigation between a discharger and the city or when requested by EPA or NDEP. Such records shall, at a minimum, outline the following: 1. Collection date; 2. Collection time; 3. Collection point/source; 4. Grab/composite sample; 5. Name of person(s) collecting the sample; 6. Sample preservation method(s); 7. Name of laboratory/person(s) performing the analysis; 8. Analytical techniques/methods used; 9. Testing for, and results of such analysis. D. Except as indicated in subsections E and F below, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the public works director. 1. All sampling, including time-proportional composite sampling or grab sampling if authorized by the city, must be representative of daily operations, of the conditions occurring during the reporting period, and of the discharge. 2. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the public works director, as appropriate. 3. Grab samples may be required to show compliance with instantaneous limits. E. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. F. For sampling required in support of baseline monitoring reports: 1. A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist. 2. For facilities for which historical sampling data are available, public works director may authorize a lower minimum. G. For sampling required in support of baseline monitoring and periodic compliance reports: 1. For the periodic monitoring reports established in Section 13.39.080 of this title, the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements. 2. In cases where a pretreatment standard requires compliance with a best management practice or pollution prevention alternative, the user must submit documentation required by the city to determine the compliance status of the user. 3. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the public works director or other parties approved by EPA. 4. These reports must be based on sampling and analysis performed in the period covered by the report, and in accordance with the techniques described in Part 136 and amendments, and include all monitoring results for the period covered by the report, including those from monitoring conducted more frequently than required. This sampling and analysis may be performed by the city in lieu of the user. H. Users subject to the reporting requirements of this title shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this title, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices established under Section 13.36.140(I) of this title. 1. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. 2. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by public works director.
(Ord. 2536, § 9, Amended, 06/26/2017; Ord. 2503, Amended, 09/08/2014; Ord. 2420, Amended, 01/26/2009; Ord. 2186, Amended, 08/25/2003; Ord. 2043, Amended, 11/29/1999; Ord. 1686, 1991: Ord. 1421 § 25, 1983: Ord. 1283 § 9 (part), 1980)
Ask a question about Sparks law
Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.
