§ 103-6: Issuance of permit.
A. The Commissioner shall examine or cause to be examined all completed applications for permits and the plans, specifications, documents and any amendments filed therewith and shall accept, in whole or in part, or reject the completed application within 60 days after filing. B. Upon acceptance of the application and receipt of required fees and any required insurance or bonds, the Commissioner shall issue a building permit. The building permit shall be a form prescribed by the Commissioner and shall be signed by the Commissioner. (1) The building permit may only be issued to either an appropriately City-licensed contractor, in the case of work done by a contractor, to an appropriately City-licensed primary contractor, in the case of work being done on a project by two or more appropriately City-licensed contractors, or to an owner, in the case of work being done by the owner. C. If the application, together with plans, specifications and other documents filed therewith, describes proposed work which does not conform to all of the requirements of the applicable building laws, ordinances and regulations, the Commissioner shall reject the same and shall return the plans and specifications to the applicant with written notice of the reasons for rejection. D. Partial permit. The Commissioner may issue a permit for the construction of a part of a building or structure before the plans and specifications for the entire building or structure have been submitted or accepted, provided that adequate information and detailed statements have been filed. The granting of a partial permit shall not relieve the applicant of the requirement to submit a complete set of plans and specifications to obtain a final building permit. Construction shall not proceed beyond the scope of the partial permit until a permit is issued for the remainder of the work. E. The Commissioner may attach conditions to the issuance of the permit to assure compliance with applicable building regulations. F. The Commissioner may require the approval of other departments or agencies prior to the issuance of a building permit. G. No demolition permit may be issued for any premises until such premises have been inspected by the Superintendent of Rodent Control, or his agents, and a written report filed with the Commissioner of Inspections and Licenses that the particular premises are free of rat infestation. H. Applications for demolition, partial demolitions that may affect the exterior of the property and asbestos abatement shall be subject to Office of Strategic Planning and Preservation Board review. The review will require additional documentation and information to be supplied by the applicant. (1) To facilitate public awareness, a sign shall be hung in a conspicuous location clearly visible from the street. In the event that the building is located on a corner or has two frontages, two signs shall be placed in clearly visible locations on each side of the building facing the street. The signs shall identify the building as being the subject of a pending demolition. The signs shall identify the Office of Strategic Planning/Preservation Board, its address and telephone number as a source of additional information. The signs should also contain the name and telephone number of an authorized representative of the applicant who can provide basic information about the proposed demolition. The signs are to be in place for a period of 10 business days. (a) The signs will be provided by the Commissioner of Permit and Inspection Services in a size and format to be determined by the Commissioner. (2) The applicant should provide two photographs of each building located on the parcel with the structure to be demolished, indicating the buildings to be demolished and the assessed address of any additional building. (3) The applicant should provide two photographs of buildings on each adjacent parcel and indicate their assessed addresses. (4) The applicant should complete and submit Part I of the short environmental assessment form. As part of the review by the Office of Strategic Planning, a proposed demolition application may require the submission of a full environmental assessment form. (5) The Office of Strategic Planning/Preservation Board shall consider every application for demolition and or asbestos removal within 30 days. This applies only for those properties not under the jurisdiction of the Buffalo Preservation Board. A longer period may apply for applications within the jurisdiction of the Buffalo Preservation Board or if the time is extended by court order. (6) The review process may be waived by the Commissioner of Permit and Inspection Services in the event the application is for home remodeling and or reconstruction as long as the exterior of the property is unaffected. (7) Except for designated landmarks or buildings within preservation districts, single-story garages which are designed for up to three cars and which are designed expressly for use as automobile storage shall be exempt from the review process. I. No demolition permit may be issued for any premises until a sidewalk survey inspection has been done and included as part of the demolition permit paperwork submission. The sidewalk survey shall include a drawing of the site and any adjacent City rights-of-way, and shall include the address, the date, the inspector, and a verbal description and photographs of the condition of all affected sidewalks, aprons, and other paved flatwork on the City right-of-way adjacent to the site or potentially affected by the project. A follow-up inspection, including new photos, drawings, and verbal description, shall be done at the completion of all work, and shall be compared to the results from the initial sidewalk inspection to determine what damages, if any, have occurred. (1) Any damage to existing sidewalks, curbs or streets caused in the performance of demolition work shall be replaced in kind and/or repaired in accordance with the City of Buffalo specifications on file with the office of the Commissioner of Public Works. All remedial work shall be done by the contractor (or owner, in the case of work done by owner) at his own expense, bearing the cost of restoring affected streets and curbs to a good and satisfactory condition.
[Added 7-20-2004 , effective 8-2-2004 ]
Ask a question about Buffalo law
Corpus searches the Buffalo sections it holds and shows the ones that match, with their citations. Free, no sign-in.