§ 491-72 — Supply to building under construction

Code of Ordinances of the City of Buffalo, New York (Code 2026-03-31: eCode360 publication current through the 2026-03-31 codification (imported 2026-11-12)) · Buffalo City Code § 491-72

Corpus is an independent public-information project, not the official City of Buffalo website. Stable reference: corpuslaw.us/code/549940ea-0f34-4d75-826a-e5a4b6900b75

§ 491-72: Supply to building under construction.

A. Persons building will be required to make a written application for water at the Division of Water. Said application shall state in detail the uses for which water is desired, the name of the owner of the property and the street number of lot on which water is to be used. Water rates will have to be paid before a building permit will be issued by the Division of New Construction. The statement must give: (1) The name of the owner of the premises. (2) The name of the architect. (3) The name of the builder. (4) The number of the lot on which water is to be used. (5) The name of the street. (6) The number of bricks to be laid. (7) The number of cords of stone to be laid. (8) The number of square yards of two-coat plastering. (9) The number of square yards of three-coat plastering. (10) The number of square feet of cement flooring to be laid. (11) The number of square feet of cement sidewalk. B. The amount of charges for water, at schedule rates for work thus stated, shall be paid in advance to the City before a permit for such use shall be issued to the applicant. C. The Director of Water may cause said work to be remeasured by an inspector under his direction, and in case it shall appear that the person receiving said permit or the architect making the required certificate has made fraudulent representations or returns as to the amount of work done under said permit, no further permit will be issued to said applicant or to any other person for him or in his behalf, under any circumstances, until all back rates are paid. D. No contractor or builder will be allowed to use water from any fire hydrant for building purposes, except as provided herein. E. No consumer of water will be allowed to furnish water for building purposes, on his own or any other premises, without first paying for the same for said purpose and receiving a permit for such use from the water office. The fee for said permit shall be as provided in Chapter 175, Fees. A season permit effective from April 15 to November 15 may also be issued. The fee for said permit shall be as provided in Chapter 175, Fees. F. The builder must, in all cases, procure a permit as before provided previous to procuring water for building purposes from any City waterworks fixture. G. The builder is required to insert a service or fixture where there is none, to enable him to procure said water for building purposes. The application for said service must be made by the owner of the property, after which the permit for such use may be issued to the builder on his application, and he must file an application to have said service turned off at the curb as soon as he has finished his work. H. In case a builder desires to use water from a service supplying water to adjacent premises, he must procure the consent of the owner of the adjacent service.

Ask a question about Buffalo law

Corpus searches the Buffalo sections it holds and shows the ones that match, with their citations. Free, no sign-in.