For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 39-407 — Permit application materials

Municipal Code, City of Rochester, New York (Rochester Municipal Code, City Charter, Zoning Ordinance and Code Tables current through legislation adopted October 20, 2026 (eCode360 publication RO0104, scraped 2026-11-18)) · Rochester Municipal Code § 39-407

Corpus is an independent public-information project, not the official City of Rochester website. Stable reference: corpuslaw.us/code/4c68f57f-1b92-46ef-9b4e-45b766c62439

§ 39-407: Permit application materials.

A. The application for a permit regulated by these procedures shall be made to the Commissioner in such form as the Commissioner shall prescribe. B. The application shall be made by the owner or by an authorized agent, including but not limited to an architect, engineer, occupant of the property or contractor employed in connection with the proposed work. C. The application shall contain: (1) A site map of the total site area and construction drawings prepared by a civil engineer, landscape architect or land surveyor licensed and registered to practice in the State of New York. The site plan shall be prepared at a scale no smaller than one inch to 20 feet and shall indicate existing and proposed contours at horizontal intervals not to exceed one foot; all improvements; areas of disturbance; areas that will not be disturbed; on-site surface water(s), including receiving waters (name of the water), streams, ponds, culverts, ditches, and wetlands as well as drainage patterns that could be affected by the construction activity; existing and final slopes; locations of utilities, roads, soils types, all areas of vegetation, including areas of grass, brush, tree clusters and wood areas, and caliper size of mature trees and shall also indicate the areas where topsoil is removed and stockpiled and where topsoil is ultimately placed; significant natural and man-made features not otherwise shown; proposed concrete cleanout basin(s) and construction entrance; location(s) of the stormwater discharges(s); resources protected under other chapters of this code or by easements; rights-of-way. (2) A description of the material used in filling operations, the total volume of material proposed to be deposited on site and a listing of the points of origin of the proposed fill material which include: (a) The name, address, and telephone numbers of the owner of the source material. (b) The street address, town, village, city, county and tax account number of location of point of origin for source material. (c) A notarized affidavit signed by the owner of the source material which states that the material has been tested and found free of any hazardous waste and complies with the requirements set forth in § 39-408A(7). A copy of the test results, performed by an authorized testing agency, shall be included as part of the affidavit. (3) A time schedule which indicates: (a) The anticipated start of construction and completion dates. (b) The anticipated duration (in days) of the exposure of all major areas of site preparation before the installation of erosion and sedimentation control measures. (4) A performance bond or letter of credit in increments of $10,000 for each 5,000 cubic yards or fractions thereof of material scheduled for placement on site. The bond shall not be released until it has been determined by the Commissioner that the work has been completed in conformance with these regulations. (5) Any applicant requesting a site preparation permit for activity which would disturb equal to or greater than one acre (43,560 square feet) of land and requiring a notice of intent (NOI) shall also include with the submission a stormwater pollution prevention plan (SWPPP) that shall be reviewed and approved by the Stormwater Management Officer prior to issuance of the site preparation permit. A SWPPP which also addresses Subsection C(1) through (5) of this section may be accepted as fulfilling the permit application materials requirements. The SWPPP shall be subject to the following additional requirements: (a) The Stormwater Management Officer shall accept and review all SWPPPs. The Stormwater Management Officer may review the plans or accept the certification of a licensed professional that the plans conform to the requirements of this Part. (b) The plan must be prepared in accordance with sound engineering practices by a qualified professional as defined in § 39-404. The final plan must be signed by a New York State licensed professional engineer (PE), who will certify that the design of all stormwater pollution prevention and erosion and sediment control practices meets the requirements outlined in the City of Rochester design criteria and the New York Standards and Specifications for Erosion and Sediment Control and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the City of Rochester. (c) The requirements to have a SWPPP prepared by a qualified professional and to have the final plan signed and certified by a New York State licensed professional engineer (PE) are not applicable to land disturbance activities that meet New York State technical standards and are five acres or less occurring on a single-family residence, which is not part of a larger common plan of development, or an agricultural property. In addition, these land disturbance activities must not discharge directly to a 303(d)-impaired water body or must not be located in a total maximum daily load (TMDL) watershed. (d) Background information about the scope of the project, including location, type and size of project and contact information that includes the name, address, and telephone number of all persons having a legal interest in the property and the tax reference number and parcel number of the subject property or properties. (e) Site map/construction drawing(s) for the project, including a general location map and a one inch equals 50 feet topographic base map of the site which extends a minimum of 50 feet beyond the limits of the proposed development. At a minimum, the site map should show the total site area; all improvements; areas of disturbance; areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface water(s), including receiving waters (name of the water), streams, ponds, culverts, ditches, and wetlands as well as drainage patterns that could be affected by the construction activity; existing and final slopes; locations of utilities, roads, soils types, forest cover, and significant natural and man-made features not otherwise shown; locations of off-site material, waste, borrow or equipment storage areas, proposed concrete cleanout basin(s) and construction entrance; and location(s) of the stormwater discharges(s); and resources protected under other chapters of this code or by easements. (f) Construction phasing plan describing the intended sequence of construction activities, including clearing and grubbing, excavation and grading, utility and infrastructure installation, final grading and landscaping, and any other activity at the site that results in soil disturbance. Sequencing shall identify the expected date on which clearing will begin and the estimated duration of exposure of cleared areas. Consistent with the New York State Standards and Specifications for Erosion and Sediment Control, not more than five acres shall be disturbed at any one time unless pursuant to an approved SWPPP and a letter of permission from NYSDEC. (g) A description of the pollution prevention measures that will be used to control litter and prevent construction chemicals and construction debris from becoming a pollutant source in the stormwater discharges; a description of construction and waste materials expected to be stored on site, with updates as appropriate; a description of controls that will be implemented to reduce pollutants from these materials, including storage practices to minimize exposure of the materials to stormwater; and a description of spill prevention and response measures. (h) A description of the temporary and permanent structural and vegetative measures to be used for soil stabilization, runoff control and sediment control for each stage of the project, from initial land disturbance to project closeout, including who will be responsible for the maintenance and implementation of said features at the site and what practices will be employed to ensure that adequate vegetative cover is established and preserved. For temporary and permanent vegetative control measures, the seeding mixtures and rates, types of sod, method of seedbed preparation, depth of topsoil, expected seeding dates, type and rate of lime and fertilizer application, and kind and quantity of mulching shall be provided. (i) A site map/construction drawing(s) specifying the location(s), size(s) and length(s) of each erosion and sediment control practice. (j) Illustration of all necessary erosion and sediment control measures, including the siting and sizing of any temporary sediment basins, and provide the dimensions, material specifications and installation details for each throughout all phases of construction and completion of development of the site. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season. (k) Identification of all temporary practices that will be converted to permanent control measures. (l) Implementation schedule for staging temporary erosion and sediment control practices, including the timing of initial placement and duration that each practice should remain in place. (m) Identification of the parts or components of the SWPPP that require maintenance. Furthermore, it shall also provide a schedule of required maintenance and identify the party responsible for such work. (n) Description of structural practices designed to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable. (o) Any existing data that describes the stormwater runoff at the site. (p) Assurance that all other applicable environmental permits have been acquired for the site prior to initial land disturbance. Copies of the applicable environmental permits shall be provided to the City of Rochester. (q) Assurance that the applicant or his or her "responsible individual" shall be on site at all times when earthwork takes place and shall inspect and document the effectiveness of all erosion and sediment control practices. (r) Assurance that all contractors and subcontractors involved in soil disturbance and/or stormwater management practice installation and maintenance shall be identified in the SWPPP. All such contractors and subcontractors shall sign a copy of the following certification statement before undertaking any land disturbance activity at the site: "I certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP. I also understand that it is unlawful for any person to cause or contribute to a violation of the water quality standards." The certification must include the name and title of the person providing the signature, address and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification is made. The certification statement must be included in the SWPPP. D. Modifications to the plan after approval. (1) Major amendments of the SWPPP shall be submitted to the City of Rochester and shall be approved or disapproved. The applicant shall amend the SWPPP whenever: (a) There is a significant change in design, construction, operation, or maintenance which may have a significant effect on the potential for the discharge of pollutants to the waters of the United States and which has not otherwise been addressed in the SWPPP; or (b) The SWPPP proves to be ineffective in providing the proper stormwater pollution prevention and erosion and sediment control as required by this Part. Amendments to the SWPPP may be reviewed by the City of Rochester. A copy of the newly amended SWPPP must be provided to the City of Rochester within five business days. (2) Additionally, the SWPPP shall be amended to identify any new contractor or subcontractor that will implement any measure of the SWPPP. The City of Rochester may request copies of signed contractor certification statements from new contractors/subcontractors working on the site. (3) Field modifications of a minor nature may be authorized by the City of Rochester by written authorization to the applicant.

Ask a question about Rochester law

Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.