§ 39-413 — Project closeout
Municipal Code, City of Rochester, New York (Rochester Municipal Code, City Charter, Zoning Ordinance and Code Tables current through legislation adopted October 20, 2026 (eCode360 publication RO0104, scraped 2026-11-18)) · Rochester Municipal Code § 39-413
Corpus is an independent public-information project, not the official City of Rochester website. Stable reference: corpuslaw.us/code/008ce1c2-9874-4891-8f21-e4009a58efa2
§ 39-413: Project closeout.
A. A certificate of substantial compliance shall be issued by the Director when all of the following have been submitted to the Director or verified as specified elsewhere in these regulations, including: (1) Written verification from a New York State licensed professional land surveyor, civil engineer or landscape architect that the final grading and contours conform with the requirements of the approved site plan. (2) Required tests verifying soil compaction have been prepared by an independent soils testing lab and copies of the results have been submitted. (3) Submission of the results of core samples taken from the site, which verifies that the material deposited on site complies with § 39-408A(7). Core sampling shall be performed by an approved independent testing laboratory and shall be taken at intervals not to exceed one sample for each 5,000 square feet of site area affected by any filling, grading or stripping operation covered by these regulations. The exact locations of the samples shall be determined by the Director. B. Duration, maintenance and closeout when a SWPPP is required. (1) Duration. (a) For a project that requires an NYSDEC SPDES permit, the SWPPP approved by the City of Rochester shall be in effect until the site has been finally stabilized, a notice of termination (NOT) is submitted to NYSDEC in accordance with the general permit and a final inspection has been completed by the City of Rochester. (b) For projects that do not require an NYSDEC NOT, the SWPPP is in effect until a final inspection is conducted and the City of Rochester has issued the applicant written approval. (2) Maintenance. (a) The applicant shall at all times properly operate and maintain all stormwater management facilities and erosion and sediment control measures which are installed or used by the applicant to achieve compliance with the conditions of this Part. Sediment shall be removed from sediment traps or sediment ponds whenever their design capacity has been reduced by 50%. The land disturbance activity shall not cause an increase in turbidity that will result in substantial visible contrast to natural conditions in surface waters of the State of New York. (b) At the end of the construction season when soil disturbance activities will be finalized or suspended until the following spring, it may be desirable to reduce the frequency of the required weekly site inspections to monthly inspections. In order to reduce inspection frequencies, the applicant must complete stabilization activities before proper installation is precluded by snow cover or frozen ground. If vegetation is used as a stabilization method, seeding, planting, and/or sodding must be scheduled to avoid fall frosts and to allow for proper germination/establishment. Installations and maintenance must be done according to the New York State Standards and Specifications for Erosion and Sediment Control. (3) Closeout. The applicant must satisfy the following project closeout requirements: (a) Reestablish grade of all permanent stormwater facilities. (b) Inspect grading of all drainage structures and provide elevation as-builts to the City of Rochester. (c) Establish perennial vegetative cover to a density of 80% over 100% of the site. (d) Removal of all debris and temporary erosion and sediment control practices. (e) Provide a written certification by a New York State licensed/certified professional that the site has undergone final stabilization (as defined in § 39-404) and that all temporary erosion and sediment controls not needed for long-term erosion control have been removed. (f) Complete any other measure deemed appropriate and necessary by the City of Rochester to stabilize the project site.
Ask a question about Rochester law
Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.