§ 4-21-80 — Construction standards

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 4-21-80

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/622d143f-b456-4fb4-9784-61b5c9220116

Sec. 4-21-80. - Construction standards.

(A) Methods of construction, installation, maintenance repair of any multi-channel system shall comply with the most current editions of the National Electrical Safety Code, and the National Electrical Code, as affects the construction, installation, and maintenance of electrical supply and communication lines and attachments and supports. To the extent that these are inconsistent with other provisions of a franchise, or state or local law, then the state law shall apply unless the state allows the local law to control. (B) All construction, installation, maintenance, and repair shall treat the aesthetics of the property as a priority, shall not substantially affect the appearance of the structure, and shall not be installed underground on the bias across the property or diagonally across the side of a residence or other structure without the property owner's permission. (C) All underground drops shall follow (to the greatest extent possible) property lines, and cross property only at right angles, unless otherwise permitted by the property owner, required due to the physical characteristics of the subsurface, or required under city, state, or federal rules. Underground installations shall be constructed in accordance with the specifications and requirements of the City of White Plains and the National Electrical Safety Code and must be designed to minimize disruption to the city's underground facilities associated with the computerized traffic control system network. (D) For existing multi-channel system construction, installation, and repair, the provisions of subsection (C) of this section shall apply only at the time a scheduled upgrade or rebuild of the MCS provider's multi-channel system is actually commenced. For newly served areas, then the provisions of subsection (C) of this section shall apply at the time of initial construction and/or installation. (E) In instances where either electrical or telephone utilities wire or cable aerially, then the MCS provider may construct its multi-channel system aerially, unless otherwise required by state law (including any applicable NYSCCT rules and regulations). (F) In instances where both electrical or telephone utilities wire or cable are underground, then the MCS provider shall construct its multi-channel system underground, unless otherwise permitted by state law (including applicable NYSCCT rules and regulations). However, where existing aerial electrical or telephone utilities convert to underground facilities, an existing aerial MCS provider shall have the option to continue remaining aerial for as long as it does not provide a safety hazard, and is permitted by state law (including any applicable NYSCCT rules and regulations).

(L.L. No. 1A-1993, § 80; L.L. No. 3-1995, § 31)