§ 4-21-93 — Implementation of a preventive maintenance program
Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 4-21-93
Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/18f77c51-c4b4-4f99-a472-03ce6eb63e34
Sec. 4-21-93. - Implementation of a preventive maintenance program.
(A) It shall be the duty of an MCS provider to devise and implement a periodic preventative maintenance program for the multi-channel system in order to ensure that there is no material degradation of the multi-channel system that would affect the citizens' health, safety, and welfare, or negatively affect the quality of multi-channel services being provided. (B) Such a program may, at the discretion of the city, be reviewed and approved by the council/franchising authority. Such approval by the council/franchising authority shall not be unreasonably withheld for an MCS provider designed preventive maintenance plan that meets the objectives of the council/franchising authority. (C) Within forty-five (45) days after the completion of any preventive maintenance component test, the MCS provider shall be prepared to make available for inspection a written report (except for daily or weekly components, and tests which may be submitted once a quarter) to the council/franchising authority detailing the results of the tests conducted, and all items performed or addressed during the periodic preventive maintenance program. Although not exhaustive, the following areas should be included in a preventive maintenance program, and subsequent report: (1) Inspection and repair, if needed, of the headend; (2) Inspection and repair, if needed, of the antenna tower; (3) Requiring weather-proofing and protection of the antenna lead connectors, and on any other exposed fittings; (4) Requiring the conducting of signal leakage tests that are in accord with FCC requirements; (5) Removal of tree roots, limbs, and branches that interfere with, or come in contact with, the MCS provider's cable; (6) Requiring the periodic servicing, testing, and calibration of the MCS provider's equipment including service vehicles, and field test equipment; (7) Employing a status monitoring system or other adequate practices to identify problems or situations in which the multi-channel system electronics are operating outside pre-programmed parameters; (8) Testing of the emergency alert system to ensure that it will function properly during an emergency situation; (9) Testing of the safety alert system or technology; (10) Testing, and the recording of test data, for all signals (audio and video) at the headend, and all system extremity points; (11) Testing as required or allowed by federal or state law (including any applicable or required NYSCCT testing); and (12) Meeting or exceeding all operating parameters as set or allowed by the FCC, and as such may be revised or amended from time to time.
(L.L. No. 1A-1993, § 93; L.L. No. 3-1995, § 36)
Ask a question about White Plains law
Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.
