For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-4-11 — Final plat plan approval

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 9-4-11

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/b19a71aa-2dfa-445a-90f7-3846dae58638

Sec. 9-4-11. - Final plat plan approval.

Before an approval of the final plat plan is given by the board, the following requirements shall be met coincidentally with the submittal of the final plat plan: 11.1 Certificate of title: The final plans shall be accompanied by a certificate of title showing the ownership of all property and easements to be dedicated to the city, and by a deed of dedication conveying such property or easements to the city free of all encumbrances, including a waiver of claim for damages occasioned by the establishment of grades as finally approved, or the alteration of the surface of any portion of the streets and alleys dedicated, to conform to the grade so established. All easements shown on the plat for sewers, drains, water mains, pavements, curbs, walks, fire alarm ducts or any other public use in or on all streets for the full width thereof as shown on said plat, shall be dedicated by a deed of dedication conveying such easements free and clear of all encumbrances to the city before approval of said plat by the planning board. 11.2 Engineer's certificate: Before approving the final plan, the board shall request a certificate from the licensed professional engineer that all the technical requirements of the plat itself have been met, and that the plat is in accordance with the laws of the State of New York, ordinances of the City of White Plains, and these regulations. 11.3 Surety: A letter of credit in a minimum amount of two hundred thousand dollars ($200,000.00) or ten (10) per cent, whichever is greater, of the total estimated cost of public improvements. Any remaining portion may be in an instrument acceptable to the commissioner of public works. The specified amount shall be as calculated by the commissioner of public works This surety will guarantee performance and development of improvements as approved by said commissioner of public works and to approved standards of said department, [and] shall be required to be furnished by the subdivider at the latter's own expense. 11.3-1 Bituminous street pavement: In the case of the two-inch hot-mix bituminous surfacing on six-inch penetration macadam base, the subdivider shall furnish and pay for a three-year maintenance bond on the entire pavement base and top, in the penalty sum of the total estimated cost of the completed pavement and base, as determined by the commissioner of public works. The bond shall date from the date of dedication of all the roads in a particular subdivision, such dedication to be as certified by the commissioner of public works. 11.4 Insurance: Contractor and/or subdivider shall obtain and furnish the city with property damage and public liability insurance which shall hold the city harmless. Amounts of insurance to be determined by the commissioner of public works and the form approved by the corporation counsel. 11.5 Public hearing required: Before approving the final plan, the board shall hold a public hearing. The planning board shall set the time and place for the public hearing on the proposed subdivision. The developer must give notice by certified mail to all property owners within two hundred (200) feet of the proposed subdivision and must present to the board, an affidavit of publication of the notice of hearing, showing the date on which said notice was published. Notice to the affected property owners as defined above must be mailed at least fifteen (15) days before the date of the hearing. Notice of hearing must be published at least ten (10) days before the date of hearing. 11.6 Certificate of approval by commissioner of public works: Before approving the final plan, the board shall have in its possession a certificate from the commissioner of public works stating that all the construction requirements of sections 6 and 7 [9-4-6 and 9-4-7] have been met; or in lieu thereof, an estimate of the probable cost of such omitted construction certified to by him, and a performance bond by a bonding or surety company approved as to form sufficient to the above estimate; or in lieu thereof, security of the owner acceptable to the common council and approved by the corporation counsel as to form and manner of execution, and as to sufficiency by the commissioner of finance. 11.6.1. Storm water pollution prevention plan (SWPPP): A storm water pollution prevention plan (SWPPP) consistent with the requirements of chapter 3-6 of this Code shall be required for final subdivision plat approval. The SWPPP shall meet the performance and design criteria and standards in chapter 3-6-6 of this Code. The approved preliminary subdivision plat shall be consistent with the provisions of chapter 3-6 of this Code. 11.7 Final approval: Shall constitute the satisfactory performance of all above requirements inclusive of payment of fees and shall be granted upon the chairman's affixing his signature to the plan after favorable vote by the board. 11.8 Compliance with all approval conditions must be completed and the chairperson's signature obtained within two (2) years of the date of the planning board resolution approving the subdivision.

(L.L. No. 4-2007, § 2)

Ask a question about White Plains law

Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.