For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50.51 — Accidental discharges

Akron, Ohio, Municipal Code (Supp. No. 64: codified through Ordinance No. 40-2026, enacted February 9, 2026) · Akron Codified Ordinances § 50.51

Corpus is an independent public-information project, not the official City of Akron website. Stable reference: corpuslaw.us/code/1dd39318-7ebb-47b8-bf7d-c35bdda1fb54

50.51 - Accidental discharges.

A. Each SIU which is required to obtain a wastewater discharge permit under Section 50.53, discharger, storm water discharger, person or governmental entity as required by the Service Director or his authorized representative shall provide protection from accidental discharge of prohibited or regulated materials or substances established by this subchapter. Detailed plans for new construction showing facilities and operating procedures to provide this protection shall be submitted to the Service Director and Superintendent of Building Inspection for review, and shall be approved by the Service Director before construction of the facility. Each existing facility shall complete its plan and submit same to the Service Director and Superintendent of Building Inspection as required by the Service Director. New SIUs who discharge to the POTW shall not be permitted to introduce pollutants into the system until accidental discharge protection procedures have been submitted and approved by the Service Director or his authorized representative. Review and approval of those plans and operating procedures by the City shall not relieve the discharger from the responsibility to modify its facility as necessary to meet the requirements of this subchapter. B. Dischargers shall notify the Service Director immediately upon the occurrence of a slug load, or accidental discharge of substances prohibited by this subchapter. The notification shall include location of discharge, date and time thereof, type of waste, concentration and volume, and corrective actions. Written notification shall be provided to the Service Director within five calendar days. Any discharger who discharges a slug load of prohibited materials shall be liable for any expense, loss or damage to the POTW in addition to the amount of any fines or penalties imposed on the City on account thereof under state or federal law. C. Signs shall be permanently posted in conspicuous places on discharger's premises, advising employees whom to call in the event of a slug or accidental discharge. Employers shall instruct all employees who may cause or discover such a discharge with respect to emergency notification procedure. D. Slug Discharge Control Plan/Slug Control Plan. The Service Director may require a plan to control slug discharges from each significant industrial user and may include this requirement in the individual wastewater discharge permit or the general wastewater discharge permit. A slug discharge is any discharge of a non-routine, episodic nature, including but not limited to an accidental spill or a non-customary batch discharge, which has a reasonable potential to cause interference or pass through, or in any other way violates the POTW's regulations, local limits or wastewater discharge permit conditions. The plan shall contain the following elements: 1. Description of discharge practices, including non-routine batch discharges; 2. Description of stored chemicals; 3. Procedures for immediately notifying the Service Director of any accidental or slug discharge, as required by Section 50.51(B) of this ordinance; and 4. Procedures to prevent adverse impact from any accidental spills or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. E. The Service Director may evaluate the need for the SIU to develop a slug discharge control plan at least once during the term of each SIU's wastewater discharge permit, or within one year of being identified as an SIU. F. Dischargers are required to notify the Service Director of any significant changes at its facility or system which might alter the nature, quality or volume of its wastewater at least thirty days prior to the change.

(Ord. 173-1991; Ord. 546-1985) (Ord. 412-2012)

Ask a question about Akron law

Corpus searches the Akron sections it holds and shows the ones that match, with their citations. Free, no sign-in.