For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50.55 — Monitoring facilities

Akron, Ohio, Municipal Code (Supp. No. 64: codified through Ordinance No. 40-2026, enacted February 9, 2026) · Akron Codified Ordinances § 50.55

Corpus is an independent public-information project, not the official City of Akron website. Stable reference: corpuslaw.us/code/094dd37a-ed72-4c67-a2fc-16c4873120e1

50.55 - Monitoring facilities.

A. Each person or governmental entity applying for a wastewater discharge permit, including dischargers to the municipal separate storm sewer system, so directed by the City shall provide and operate, at the discharger's own expense, a monitoring facility to allow inspection, sampling, and flow measurement of each sewer discharge to the City. Each monitoring facility shall be situated on the discharger's premises. Except where a location would be impractical or cause undue hardship on the discharger, the City may concur with the facility being constructed in the public street or sidewalk area providing the facility is located so it will not be obstructed by landscaping, utilities, parked vehicles and shall be accessible at all times. There shall be ample room in or near such sampling facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the discharger. All monitoring facilities shall be constructed and maintained in accordance with all applicable local construction standards and specifications. Construction shall be completed within ninety days, unless specified otherwise by the City, of receipt of written notice from the City directing the discharger to construct the facilities. B. All dischargers, if directed by the Service Director, shall have an inspection and sampling manhole or structure with an opening of no less than twenty-four inches diameter and an internal diameter of no less than forty-eight inches containing such flow measuring, recording, and sampling equipment as may be required by the City to ensure compliance with this subchapter. Such structure may be utilized by the discharger for his monitoring program if approved by the City. The discharger shall obtain all required permits prior to construction of monitoring facilities. C. The Service Director may require a discharger to install flow monitoring facilities, instruments and recording devices to ensure accurate measurement of flows as the Service Director determines to be necessary.

(Ord. 443-1994; Ord. 173-1991; Ord. 546-1985) (Ord. 412-2012)

Ask a question about Akron law

Corpus searches the Akron sections it holds and shows the ones that match, with their citations. Free, no sign-in.