For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3124.11 — Planning standards for stormwater runoff

Columbus City Codes; partial (Supp. No. 86: codified through Ordinance No. 2063-2026, enacted July 2, 2026) · Columbus City Codes § 3124.11

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/81e2312d-7d96-4cf0-94bd-9685a8fc52b2

3124.11 - Planning standards for stormwater runoff.

All stormwater management systems shall meet requirements as provided in the division of water reclamation's Drainage Manual. Any deviations from these requirements shall require the approval from the division of water reclamation. Standards require construction of storm sewers to convey a two (2) year, twenty-four (24) hour storm event within the pipe and a five (5) year, twenty-four (24) hour storm event within the piped system. Development shall restrict the peak flow from a property to a two (2) year, twenty-four (24) hour storm event at a runoff coefficient (rational method) of four-tenths (0.4), or limit the peak flow to the ability of the downstream stormwater system to convey the flow. _____

(Ord. 2229-04 § 16 (part); Ord. No. 1682-2025, §§ 3, 4, 6-30-2025)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.