§ 1181.06 — STORMWATER RUNOFF CONTROL CRITERIA

Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1181.06

Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/839eed15-ca7f-469b-a068-0bb515d76fbc

1181.06 - STORMWATER RUNOFF CONTROL CRITERIA.

(a) Stormwater runoff control shall address both peak rate and total volume of runoff. The peak rate of the runoff from an area after development shall not exceed the peak rate of runoff from the same area before development for all storms from one year up to a 100-year frequency, twenty-four-hour storm. In addition, if it is found a proposed development shall increase the volume of runoff from an area, the peak rate of runoff from certain more frequent storms shall be controlled further. There are two (2) reasons why increases in volume of runoff require a control standard more restrictive than controlling to the predevelopment condition. First, increases in volume mean runoff shall be flowing for a longer period of time. When routed through a watershed, these longer flows may join at some point or points downstream thereby creating new peak flows and the problems associated with peak flow such as flooding. This is known as the "routing problem." Second, longer flow periods of large runoff quantities place a highly erosive stress on natural channels. This stress can be minimized by reducing the rate of discharge. The permissible peak rate shall be determined as follows: (1) Determine the total volume of runoff from a one-year frequency twenty-four-hour storm, occurring over the area before and after development; and (2) Determine the percentage of increase in volume due to development and using this percentage, pick the critical storm from the following table: If the percentage of increase in volume of runoff is: Equal to or greater than: | and less than: | the critical storm for discharge limitations shall be (years) — | 10 | 1 10 | 20 | 2 20 | 50 | 5 50 | 100 | 10 100 | 250 | 25 250 | 500 | 50 500 | — | 100 (b) The peak rate of runoff from the critical storm occurring over the development shall not exceed the peak rate of runoff from a one-year frequency storm occurring over the same area under predevelopment conditions. Storms of less frequent occurrence (longer return period) than the critical storm, shall have a peak rate runoff not greater than for the same storm under predevelopment conditions. As an example, if the total volume is to be increased by thirty-five percent (35%), the critical storm is a five-year storm. The peak rate of runoff for all storms up to this intensity shall be controlled so as not to exceed the peak rate of runoff from a one-year frequency storm under predevelopment conditions in the area. The runoff from a more intense storm up to a 100-year storm need only be controlled so as not to exceed the predevelopment peak rate from the same frequency of storm. (c) Storage volume does not have to be provided for off-site upstream drainage areas.

(Ord. 74-91. Passed 9-17-91; Ord. O-02-2011. Passed 2-15-11.)