§ 1183.03 — SEDIMENTATION AND EROSION CONTROL PLAN REQUIRED

Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1183.03

Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/72c7e778-54d8-4288-ad35-d8850b9267c2

1183.03 - SEDIMENTATION AND EROSION CONTROL PLAN REQUIRED.

(a) A copy of an approved Notice of Intent (NOI) from the Ohio Environmental Protection Agency as well as a sedimentation and erosion control plan shall be submitted to the Municipal Engineer prior to any earth disturbing activity equal to or greater than one acre for residential, commercial, manufacturing, multi-family development, or public utility construction. Such plan may be submitted as a part of the detailed engineering plans. For earth disturbing activity less than one acre, the need for sediment and erosion control activity shall be determined by the Municipal Engineer, or Administrator's designee. A copy of an approved Notice of Intent (NOI) from the OEPA, corresponding sedimentation and erosion control plan, and all sedimentation and erosion control inspection reports (taken after each rain event) shall be placed in a location (mailbox, construction trailer, etc.) approved by the Municipal Engineer, or Administrators designee. This location must be clearly labeled Stormwater Management Pollution Prevention Plan (SWP3) and available for inspection twenty-four (24) hours a day. (b) Sedimentation and Erosion Control Plan Content. A sedimentation and erosion control plan for a proposed development area, with maps drawn to a minimum scale of one inch equals one hundred (100) feet, shall be submitted to the Municipal Engineer, or Administrators designee. The sediment control plan may be a part of the detailed engineering plan, but it shall contain the following information: (1) Location of the area and its relation to its general surroundings including but not limited to: A. Off-site areas susceptible to sediment deposits or to erosion caused by accelerated runoff, and B. Off-site areas affecting potential accelerated runoff and erosion control. (2) Existing and proposed topography and drainage of the development area and adjacent land within one hundred (100) feet of the boundaries. A topographic map should contain an appropriate contour interval to clearly portray the conformation and drainage pattern of the area. (3) The location of existing buildings, structures, paved areas (streets, roads, driveways, sidewalks, etc.), utilities, water bodies, drainage facilities, vegetative cover, conservation/preservation zones and other significant natural or man-made features on the development area and adjacent land within one hundred (100) feet of the boundaries. (4) A general description of the predominant soil types, their location and their limitations for the proposed use. (5) Proposed use of the development area. (6) All proposed earth disturbance including: A. Areas of disturbance including excavation, grading, filling, etc. and B. Total size of disturbance area. C. The finished grading plan. D. Kinds of utilities and proposed areas of installation. E. Proposed paved and covered areas in square feet or to scale on a plan map. (7) Provisions for temporary and permanent erosion control shall generally follow the latest edition of the Ohio Department of Natural Resources (ODNR) Rainwater and Land Development Manual. (8) Provisions for the management of stormwater, derived both on-site and from upper watershed areas, including the control of accelerated on-site runoff, to a stable receiving outlet. (9) Provisions for maintenance of control facilities including easements to ensure short as well as long term erosion and sediment pollution control and stormwater management. (10) Proposed construction sequence and time schedule for all earth-disturbing activities and installation of provisions for erosion and stormwater management. (11) Design computations and applicable assumptions for all structural measures for erosion and sediment pollution control and water management. Volume and velocity of flow must be given for all surface water conveyance. This information shall also be provided for surface water outlets. (12) Seeding mixtures and rates, lime and fertilizer application rates, and kind and quantity of mulching for both temporary and permanent vegetative control measures. (13) Estimate of cost of erosion and sediment control and water management structures and features. (14) Title, scale, direction, legend and date of all plan maps. (15) Names and address of the person(s) preparing the plan, the owner, and the person responsible for the development area. (16) Certification that all earth disturbance, construction, and development will be done pursuant to the plan. The Municipal Engineer may waive specific requirements for plan detail or may require additional information to show that work will conform to basic requirements of this chapter. (c) Plan Review. The Municipal Engineer shall, within fourteen (14) working days of receipt of a sedimentation and erosion control plan, indicate its approval or disapproval (status of compliance or non-compliance) to the person who filed the plan. Indication of disapproval (non- compliance) shall include the plan deficiencies and the procedures for filing a revised plan. Pending preparation and approval (determination of compliance) of a revised plan, earth- disturbing activities shall proceed only in accordance with conditions outlined by the Municipal Engineer, or Administrators designee.

(Ord. 73-91. Passed 9-17-91; Ord. O-02-2011. Passed 2-15-11.)