§ 1183.04 — SEDIMENT AND EROSION CONTROL STANDARDS AND CRITERIA

Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1183.04

Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/86c129f4-5898-469b-9ff6-5601543b87f0

1183.04 - SEDIMENT AND EROSION CONTROL STANDARDS AND CRITERIA.

In order to control sediment pollution of water resources, the owner or person responsible for the development area shall use the most current and scientifically sound BAT's and BMP's relating to conservation planning to maintain the level of conservation established by the following standards: In order to control sediment pollution of water resources, the owner or person responsible for the development area shall use conservation planning and practices to maintain the level of conservation established per New Albany's current Ohio Environmental Protection Agencies (OEPA) National Pollutant Discharge Elimination Systems (NPDES) Phase II Permit: (a) Timing of Sediment-Trapping Practices. (1) Sediment control practices shall be functional throughout earth-disturbing activity. (2) Settling facilities, perimeter controls and other practices intended to trap sediment shall be implemented as the first step of grading or construction and within seven (7) days from the start of grubbing. They shall continue to function until the upslope development area is re-stabilized. (b) Stabilization of Denuded Areas. Denuded areas shall have soil stabilization applied within seven (7) days if they are to remain dormant for more than twenty-one (21) days. Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site, and shall also be applied within seven (7) days to denuded areas which may not be at final grade, but which will remain dormant (undisturbed) for longer than twenty-one (21) days. (c) Settling Facilities. Concentrated stormwater runoff from denuded areas shall be filtered or diverted to a settling facility. (1) The minimum capacity of the sediment basin to the elevation of the crest of the pipe spillway shall be sixty-seven (67) cubic yards (0.04 acre-feet) for each acre within the drainage area that will be disturbed by construction during the designed life of the sediment basin. If other areas within the drainage area are actively eroding, additional sediment capacity must be added (volume will be determined based on site conditions). The volume of the sediment storage zone shall be thirty-seven (37) cubic yards per disturbed acre within the watershed of the basin or based on another method acceptable to the Municipal Engineer. (2) The Municipal Engineer will consider alternate methods, proposed by the developer, for accumulating, processing and storing sedimentation, so long as the methods utilize the most current and scientifically sound BAT's and BMP's and that these BAT's and BMP's comply with New Albany's most current OEPA NPDES Phase II permit. (d) Sediment Barriers. (1) Sheet flow runoff from denuded areas shall be filtered or diverted to a settling facility. (2) Sediment barriers such as sediment fence or diversions to settling facilities shall protect adjacent properties and water resources from sediment transported by sheet flow. (e) Storm Sewer Inlet Protection. All storm sewer inlets which accept water runoff from the development area shall be protected so that sediment-laden water will not enter the storm sewer systems without first being filtered or otherwise treated to remove sediment, unless the storm sewer system drains to a settling facility. (f) Working In or Crossing Streams. Streams including bed and banks shall be re- stabilized immediately after in-channel work is completed, interrupted or stopped. (1) To the extent practicable, construction vehicles shall be kept out of streams. Where in-channel work is necessary, precautions shall be taken to stabilize the work area during construction to minimize erosion. (2) A temporary stream crossing plan shall be provided if a stream must be crossed by vehicles during construction. (g) Construction Access Routes. Measures shall be taken to prevent soil transport onto surfaces where runoff is not checked by sediment controls, or onto public roads. (h) Sloughing and Dumping. (1) No soil, rock, debris or any other material shall be dumped or placed into a water resource or into such proximity that it may readily slough, slip, or erode into a water resource unless such dumping or placing is authorized by the Municipal Engineer, and, where applicable, the U.S. Army Corps of Engineers, for such purposes as, but not limited to, constructing bridges, utility lines, culverts and erosion control structures. (2) Unstable soils prone to slipping or landsliding shall not be graded, excavated, filled or have loads imposed upon them unless the work is done in accordance with a qualified professional engineer's recommendations to correct, eliminate or adequately address the problems. (i) Cut and Fill Slopes. Cut and fill slopes shall be designed and constructed in a manner which will minimize erosion. Consideration shall be given to the length and steepness of the slope, soil type, upslope drainage area, groundwater conditions and slope stabilization. (j) Stabilization of Outfalls and Channels. Outfalls and constructed or modified channels shall be designed and constructed to withstand the expected velocity of flow from a post-development, 10-year frequency storm without eroding. (k) Preservation of Natural Watercourses. Existing streams and channels shall not be altered or channeled without express permission from the Municipality of New Albany, and shall be preserved with their natural tree or vegetation canopy intact as a means to prevent their pollution from runoff containing sediment. The buffer area necessary to protect such watercourses shall be determined by the Municipal Engineer. (1) The Engineer may rely, as a guide for determining appropriate buffer area, on ODNR's Rainwater and Land Development Manual. (2) When the Municipal Engineer determines that in his opinion prohibiting channelization of an existing natural watercourse would cause an undue hardship for the development of property subject to these regulations, he may permit such alteration after reviewing plans outlining the extent and nature of the channelization or alteration. (3) Additionally, whenever such watercourse is being considered for alteration, the agency seeking permission to alter the watercourse shall provide the names of the owners of the three (3) next lower riparian properties under wholly different ownership, and such property owners shall be notified in writing of the intended watercourse alteration. (l) Establishment of Permanent Vegetation. A permanent vegetation shall not be considered established until ground cover is achieved which, in the opinion of the approving agency, provides adequate cover and is mature enough to control soil erosion satisfactorily and to survive adverse weather conditions. (m) Maintenance. All temporary and permanent erosion and sediment control practices shall be designed and constructed to minimize maintenance requirements. They shall be maintained and repaired as needed to assure continued performance of their intended function. The person or entity responsible for the continued maintenance of permanent erosion controls shall be identified to the satisfaction of the Municipal Engineer, or Administrators designee.

(Ord. 73-91. Passed 9-17-91; Ord. O-02-2011. Passed 2-15-11.)