§ 1187.04 — FINAL PLAT PROCESS
Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1187.04
Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/bedcd6e9-6453-4105-876c-fffbf316030d
1187.04 - FINAL PLAT PROCESS.
(a) Final Plat. A final plat shall be submitted to the Planning Commission for review of subdivisions as defined in C.O. 1187.01(g). (b) Final Plat Contents. The subdivider shall submit an application to the City Manager's designee a minimum of thirty (30) days prior to the meeting of the Planning Commission which the subdivider desires their application to be heard. If the City Manager's designee finds that the application is not complete and does not meet requirements of this section, they shall notify the applicant in writing of the deficiencies. The applicant may make the necessary additions and/or revisions. No hearing shall be held or action of approval taken by the Planning Commission until a complete application meeting all requirements of this section has been filed with and accepted by the City Manager's designee. The final plat shall contain the following: (1) Boundary of plat, based on an accurate distances and bearings. (2) Where the subdivision does not abut to an existing subdivision, the true angle and distance to the nearest street intersection, accurately described on the plat. (3) Municipal, Township, County or Section lines accurately tied to the lines of the subdivision by distances and angles. (4) Radii, arcs and chords, points of curvature and tangency. Central angles for all curvilinear streets and radius for all rounded corners. (5) All lot numbers and lines with accurate dimensions in decimals of a foot and bearings in degrees, minutes and seconds. (6) One-inch iron pins, thirty (30) inches long, with plastic caps identifying the surveyor shall be placed at such locations that the subdivisions can be readily resurveyed. As a minimum, all extreme corners shall be monumented. (7) Accurate location, width of right-of-way and name of all streets or other public ways. (8) All proposed developer easements, such as water, sanitary and storm sewers shall be shown. All proposed public utility easements shall be shown if they are available. (9) Minimum building setback lines along all streets and other public ways. (10) Accurate outlines and delineation of all drainage easements, one hundred-year floodway routing, flood hazard areas and other watercourses contained within or contiguous to the plat boundaries. (11) Accurate outlines of any areas to be dedicated or reserved for public use, with purposes indicated thereon, and of any areas to be reserved by deed covenant, for the common use of all property owners. (12) Other information deemed necessary by the Municipal Engineer or the Planning Commission in order to fully describe any special conditions or circumstances affecting the proposed plat. (13) If more than one (1) sheet is required for the plat, an index map, at a smaller scale, showing all of the lots on one (1) contiguous drawing shall be shown on the first sheet. The final plat submittal shall also contain: (14) A certification by a registered surveyor that the plat represents a survey made by him and that the monuments shown exist as located, or will be set one (1) foot below proposed grade prior to beginning of construction, and that all dimensional and geodetic details are correct. The plat shall be prepared in accordance with the minimum plat requirements as established by the Franklin County Engineer's Office. (15) A notarized certification by the owner/owners of the adoption of the plat and the dedication by them to public use of the streets and other public areas shown on the plat. No property should extend to center of rights-of-way. (16) Proper form for the approval of the Planning Commission, with space for signature of the Chairperson. (17) Space for approval by signature of the Mayor, Municipal Engineer, Council representative to Planning Commission and Finance Director. The signature of the Engineer shall be withheld until all easements are shown. (18) Proper form for approval and acceptance by the Council, showing resolution number. (19) Within ten (10) working days after the review comments have been transmitted to the developer, and the tracing (final plat drawing) has been revised to reflect the review comments, it shall be submitted to the Municipal Engineer for the permanent filing. Any additions or changes to the plat shall be made in the Engineer's office unless otherwise authorized by the Engineer. (20) Space for transfer by the County Auditor and recording by the County Recorder. A statement as to the expiration date of the municipal approval shall be placed just ahead of the space provided for the County Auditor's signature. (21) Application fees specified by separate ordinance. (22) Copies of any and all proposed deed covenants, deeds of right-of-way and deeds of easement. In addition to the aforementioned requirements, the developer shall submit a written statement which shall include: (23) Evidence that the Ohio Environmental Protection Agency has considered the applicant's application and granted such permit or determined that such permit is not applicable. If a permit was granted, four (4) copies shall be supplied by the owner to the Village Administrator's designee for distribution. (24) Evidence that the U.S. Army Corps of Engineers has considered the applicant's application and granted such permit or determined that such permit is not applicable. If a permit was granted, four (4) copies shall be supplied by the owner to the Village Administrator's designee for distribution. After the tracing (final plat drawing) has been revised to reflect the review comments, eight (8) copies showing all approvals, shall be supplied by the owner to the Finance Director for distribution. (c) Approval of Final Plat. (1) The Planning Commission review of a final plat application shall be based on the requirements of this chapter and provide a recommended action to City Council, who shall take final action on such application. (2) After action by City Council on an application for final plat approval, the action shall be documented by the Clerk of Council. The final plat may be recorded with the County Recorder's office provided compliance is made with other provisions of this chapter, only after full approval by the City Engineer. The City Manager may only add or revise easements after City Council has approved a final plat. (3) The approval of a final plat shall be effective for a period of twelve (12) months, or for such other time as approved by City Council. (4) The subdivider shall not transfer any lot, parcel or tract therefrom before the final plat has been recorded. No construction work on the proposed subdivision, including grading, shall be commenced until approval is received of a final plat and an engineering permit has been approved, in accordance with C.O. 909.
(Ord. O-20-2024. Passed 7-2-24.)
Ask a question about New Albany law
Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.
