§ 1187.08 — SUBDIVISION STANDARDS, STREETS
Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1187.08
Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/c967e6d6-0476-4332-85a1-6c1408fa6d3a
1187.08 - SUBDIVISION STANDARDS, STREETS.
(a) Streets shall be dedicated to public use by the subdivider. Streets shall be arranged in a simple connecting pattern. Residential streets shall be so designed so as to discourage their use by non-local traffic. Alleys should be used as driving aisles to provide access to parking areas and garages. Dead ends and cul-de-sacs should be limited in all districts. Easements for utilities must be provided along side or rear lot lines where possible. Street rights-of-way shall have the following minimum widths: (1) Major Arterial (includes federal, state and county roads which are main arteries of access to the Municipality): one hundred (100) feet; an additional width of forty-five (45) feet shall be provided to accommodate a service drive wherever lots are to face a primary road. (2) Minor Arterial (next in importance as avenues of access between sections of the Municipality as opposed to commercial traffic and non-local traffic): eighty (80) feet. (3) Collector (within new subdivision): sixty (60) feet. (4) Minor (completely residential in nature): fifty (50) feet. (5) Cul-de-sac Circles: minimum right-of-way radius of sixty (60) feet with curbs and gutters and seventy (70) feet without curbs and gutters and no cul-de-sac shall exceed six hundred (600) feet in length unless lot widths exceed one hundred (100) feet at building setback lines, then the maximum length shall not exceed one thousand (1,000) feet. (6) Alleys: twenty (20) feet. (7) Easements (as required): Where alleys are not required, utility easements of not less than five (5) feet in width shall be provided on each side of rear lot lines to provide access for the installation and maintenance of all utility lines, overhead or underground. Wider easements may be required along or across lots for main storm or sanitary sewers or other utilities, or where a combination of utility lines is indicated. (b) Narrower streets are encouraged where appropriate to promote a pedestrian friendly scale and as a tool for traffic-calming. Minimum pavement widths shall be as follows: (1) Major Arterial: variable as conditions may require. (2) Minor Arterial: thirty-six (36) feet from face to face of curbs. (3) Collector: thirty-two (32) feet from face to face of curbs or twenty-six (26) feet without curbs and no street parking permitted. (4) Minor: twenty-six (26) feet from face to face of curbs; twenty-four-foot pavement width if curbs and gutters are not provided. (5) Cul-de-sac Circles: minimum outside pavement radius of forty-eight (48) feet with a minimum twenty-four (24) feet of pavement width. (6) Alleys: eighteen (18) feet. (7) One-way Divided Streets: twenty (20) feet from face to face of curbs, with fifty-foot radius on "hammer-head" cul-de-sacs. (8) Sidewalks: Five-foot minimum or greater as determined by width of existing sidewalks, as approved by the Community Development Department. Sidewalks shall be concrete, constructed per the city standard. (9) Leisure Trails: Eight-foot minimum unless otherwise specified by the Planning Commission. Leisure trails shall be asphalt unless otherwise specified by the Planning Commission and shall be constructed per the city standard. (c) The maximum grades shall be: (1) Major Arterial: four percent (4%). (2) Minor Arterial: five percent (5%). (3) Collector, Minor and Alleys: six percent (6%). The minimum grade for any street shall be one-half of one percent (.5%) at the gutter, unless otherwise approved by the Municipal Engineer. Street intersections shall be rounded by radii not less than twenty (20) feet at the curb line. Sidewalks shall be located as approved by the Municipal Engineer. All street construction and specifications for materials shall be in conformity with standards required by the Municipality. The plans must bear the approval of the Engineer and Mayor, and places shall be provided for such signatures, including that of the Finance Director.
(Ord. 77-91. Passed 10-15-91; Ord. 31-2007. Passed 8-21-07; Ord. O-02-2024. Passed 2-6-24.)
Ask a question about New Albany law
Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.
