For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.03.090 — Sanitary Sewers

Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 21, § 21.03.090

Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/6ae35ab9-e7de-4ef4-a4a9-9bd49e8581de

21.03.090 - Sanitary Sewers.

A. Public Sanitary Sewage System Connection, Extension and Installation Requirements for New Developments. 1. Developers are required to connect the development to a public sanitary sewerage collection system or sewage treatment facility, obtain all necessary easements dedicated to the public as are required for such development and to provide adequate sewer laterals which are accessible to each lot. Said sewer system shall comply with specifications as approved by the City Engineer and the Oklahoma Department of Environmental Quality (ODEQ). When necessary, the City may assist the developer in obtaining easements. 2. Developers are required to extend the sewerage system lying within the development to the upstream junction(s) of the developments boundary with the drainage basin. 3. Developers constructing sewerage systems are required to construct said systems with adequate capacity and excess capacity. Systems shall be at sufficient depth as to permit future extension to serve the entire drainage area upstream from the point of consideration. The capacity shall include sewer lines, lift stations and force mains, as applicable. New interceptor line extensions shall comply with the adopted and current Master Wastewater Collection System Plan and, as determined by the City Engineer, the size will be based on future design flows. 4. Where plans for the installation of sanitary sewers in the vicinity of the development have been prepared and approved by the ODEQ and the City Engineer, the developer shall install sewers in conformity with such plans. 5. In residential acreage subdivisions, the developer may not be required to connect to the City sanitary sewage system upon recommendation of the PRT. 6. In residential acreage subdivisions, the lot size shall not be less than 60,000 square feet, if the subdivision is served with private well water. If the subdivision is served with public city water the lot size shall not be less than 21,780 square feet net. The net lot size calculation is more specifically addressed in the zoning ordinance Chapter 22.4.38 "Specific Purpose Dwelling District, with Mixed Public and Private Utility Services". B. Lift Stations and Payment for Wastewater Systems Components. 1. Lift stations are discouraged. 2. However, when no other engineering solution is available, lift stations shall be constructed at the developer's expense. 3. The developer shall pay to the City a lump sum amount equal to an annual maintenance cost of the lift station times fifteen years. The annual maintenance cost will be determined by the City Engineer. If the developer and City Engineer cannot reach an agreement on the amount of the lump sum payment, the matter may be referred to the Public Works Committee for an authoritative decision. 4. If the lift station is in operation less than fifteen years, the developer may receive a refund of the lump sum payment equal to the prorated amount based on the time remaining. C. Ownership of Sanitary Sewer System Components. After completion and acceptance of the developer's sewers constructed pursuant hereto, the sewers shall thereupon be and become a part of the sewerage system of the City.

(Ord. 2696, §§ 1, 2, June 24, 2002; Ord. 3477, § 1, March 9, 2015; Ord. 3847, § 1, June 28, 2021).

Ask a question about Edmond law

Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.