§ 21.03.100 — Connection to Electrical System
Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 21, § 21.03.100
Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/3eee012c-4a7b-4143-b06f-0d93cc3dc817
21.03.100 - Connection to Electrical System.
a) The developer shall connect to the City of Edmond electric utility, Edmond Electric. b) Edmond Electric will design the Underground Residential Distribution (URD) system for the subdivision's internal electric needs. c) For installation of the URD System: 1) The developer will be responsible for providing and installing all primary, secondary and streetlighting conduit and required subsurface equipment for the URD system per Edmond Electric specifications. 2) Where applicable, the URD conduit and subsurface equipment will be installed in roadway rights-of-way, or within developer provided utility easements, either platted or obtained by separate instrument. All roadway rights-of-way must be to final grade as detailed in Section 21.02.060 Public Street Rights-Of-Way, prior to URD installation. 3) Edmond Electric will be responsible for the installation of all primary and secondary conductors, transformers, pedestals and other surface mounted equipment. d) In lieu of section c), the developer may enter into a Residential Subdivision Reimbursement Agreement with the City. 1) The developer will be responsible for the estimated cost of installation of the URD System according to the terms and conditions of the agreement. 2) The developer will be reimbursed for each residential structure completed according to the terms and conditions of the agreement. e) Subdivision design changes after installation of electric facilities, or changes made by individual builders on subdivision lots causing the need to raise or lower electric facilities due to additional grading, will require the respective developer or builder to correct these issues at their expense or reimburse Edmond Electric for one hundred percent (100%) the cost of labor and materials for these modifications. f) The electrical service drops or service laterals will be installed by Edmond Electric per Section 13.08.090. g) If electric service is not adjacent to the subdivision property or does not allow a direct connection to the URD system, Edmond Electric will extend or upgrade primary and/or secondary service from the nearest suitable point of connection, up to one mile, free of charge. All other costs for the extension or upgrade of facilities will be borne by the developer. The one mile extension will be measured along the route of construction or upgrade, as appropriate. h) In order to expedite the installation, developers shall make contact with the Edmond Electric Engineering Manager to discuss the URD system plans during the plat review process. Additionally, a minimum four (4) weeks advance notice to Edmond Electric is required prior to developer's desired installation of primary and secondary conductors, transformers, pedestals and other surface mounted equipment.
(Ord. 2696, §§ 1, 2, June 24, 2002; Ord. 3239, § 1, November 9, 2009; Ord. No. 3535, § 1, April 11, 2016).
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.