For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23.40.050 — Definitions

Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 23, § 23.40.050

Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/8188e9e3-d268-4252-95ee-0f6c49e8b5a4

23.40.050 - Definitions.

Unless specifically defined below, words or phrases used in this Ordinance shall be interpreted to give them the meaning they have in common usage and to give this Ordinance its most reasonable application. 1. ALTER OR ALTERATION OF A WATERCOURSE - means any change to the stormwater drainage system or to the land surface which changes the conveyance capacity of the stormwater drainage system. 2. APPEAL - means a request for a review of the Floodplain Administrator's interpretation of any provision of this Ordinance or a request for a variance. 3. AREA OF SHALLOW FLOODING - means a designated AO or AH zone on a community's Flood Insurance Rate Map (FIRM) with a one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. 4. AREA OF SPECIAL FLOOD HAZARD (REGULATORY FLOODPLAIN) - is the land in a designated floodplain within the City subject to a one percent or greater chance of flooding in any given year. The area is designated on a Flood Insurance Rate Map (FIRM) developed by the Federal Emergency Management Agency (FEMA) or on a Master Drainage Plan Regulatory Floodplain Map developed for or by the City. The most restrictive or stringent map will be used in determining the floodplain. Also referred to as Special Flood Hazard Area. 5. BASE FLOOD - means the flood having a one percent chance of being equaled or exceeded in any given year. 6. BASE FLOOD ELEVATION - means the water elevation of the base flood. 7. BASEMENT - means any area of a structure having its floor below ground level on all sides. 8. BEST MANAGEMENT PRACTICE (BMP) - are the schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the City of Edmond. See the City of Edmond Standard Drainage Policy STD-400 for more information. 9. CITY DRAINAGE STANDARDS / CITY OF EDMOND STANDARD DRAINAGE POLICY STD-400 - the criteria, standards, and specifications for stormwater drainage, land disturbance, and floodplain development adopted by the City and known as the City of Edmond Standard Drainage Policy STD-400. 10. CRITICAL FEATURE - means an integral and readily identifiable part of a flood protection system, without which the flood protection provided by the entire system would be compromised. 11. DETENTION - means the temporary storage and controlled release of stormwater runoff. 12. DETENTION FACILITY - means a facility that provides temporary storage of stormwater runoff and controlled release of this runoff. 13. DEVELOPMENT - means any man-made change in improved and unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, vegetation removal, clearing and grubbing, paving, excavation, retaining walls, drilling operations, or storage of equipment or materials. The following does not constitute development: lawn and yard care, gardening, tree care and maintenance, removal of trees or other vegetation damaged by natural forces. 14. ELEVATED BUILDING - means a non-basement building (i) built, in the case of a building in the Regulatory Floodplain to have the top of the lowest habitable floor elevated above the ground level by means of pilings, columns (posts and piers), or shear walls parallel to the flow of the water and (ii) adequately anchored so as not to impair the structural integrity of the building during a flood of up to the magnitude of the base flood. Elevated building also includes a building in a Regulatory Floodplain elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of flood waters. 15. ENFORCEMENT AUTHORITY - is the Edmond City official who is responsible for assuring that the provisions of the Edmond Municipal Code are enforced, and shall be the City Manager or his/her designee. 16. EXISTING CONSTRUCTION - means for the purposes of determining rate, structures for which the "start of construction" commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. "Existing construction" also may be referred to as "existing structures." 17. EXISTING MANUFACTURED HOME PARK OR SUBDIVISION - means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community. 18. EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION - means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). 19. FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) ELEVATION CERTIFICATE - is the official Federal form that is used to provide elevation information necessary to ensure compliance with community floodplain management ordinances. Only the most recently released version of this form shall be accepted. In all cases the form shall have the Building Photographs section completed with the appropriate photographs as described in the instructions. 20. FLOOD OR FLOODING - means a general and temporary condition of partial or complete inundation of normally dry land areas. Flooding results from the overflow of inland waters or the unusual or rapid accumulation of surface water runoff from any source. 21. FLOOD HAZARD AREA - means an Area of Special Flood Hazard. 22. FLOOD INSURANCE RATE MAP (FIRM) - means an official map of a community, on which the Federal Emergency Management Agency has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. 23. FLOOD INSURANCE STUDY - is the official report provided by the Federal Emergency Management Agency. The report contains flood profiles, water surface elevations of the base flood, as well as the Flood Boundary-Floodway Map. 24. FLOODPLAIN - means any land area susceptible to being inundated by water from any source (see definition of flooding). 25. FLOODPLAIN MANAGEMENT - means the operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works, and floodplain management regulations. 26. FLOODPLAIN MANAGEMENT REGULATIONS - means zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as floodplain, grading, and erosion control ordinances) and other applications of police power. The term describes such state or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction. 27. FLOOD PROTECTION SYSTEM - means those physical structural works for which funds have been authorized, appropriated, and expended and which have been constructed specifically to modify flooding in order to reduce the extent of the areas within a community subject to a "special flood hazard" and the extent of the depths of associated flooding. Such a system typically includes hurricane tidal barriers, dams, reservoirs, levees, or dikes. These specialized flood modifying works are those constructed in conformance with sound engineering standards. 28. FLOODPROOFING - means any combination of structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. 29. FLOODWAY (REGULATORY FLOODWAY) - means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. 30. FULL DEVELOPMENT/FULL URBANIZATION (FUTURE FLOODPLAIN) - is full potential urbanization of the contributing watershed considering the most recent Land Use Plan. The most restrictive interpretation will be followed. 31. FUNCTIONALLY DEPENDENT USE - means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. 32. HABITABLE FLOOR - means any floor usable for the following purposes; which includes working, sleeping, eating, cooking, or recreation, or a combination thereof. 33. HIGHER REGULATORY FLOOD STUDY - means any adopted hydrologic and hydraulic analysis performed by and for the City of Edmond for the express purpose of further regulating the City's floodplains. 34. HIGHEST ADJACENT GRADE - means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. 35. HISTORIC STRUCTURE - means any structure that is: (a) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (c) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of Interior; or (d) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (1) By an approved state program as determined by the Secretary of the Interior, or; (2) Directly by the Secretary of the Interior in states without approved programs. 36. LAND DISTURBANCE - means vegetation removal, surveying, geotechnical exploration, clearing and grubbing, excavating, grading, leveling, regrading, landfilling, berming, or diking of land within the City. 37. LEVEE - means a man-made structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control, or divert the flow of water so as to provide protection from temporary flooding. 38. LEVEE SYSTEM - means a flood protection system which consists of a levee or levees, and associated structures such as closure and drainage devices, which is constructed and operated in accordance with sound engineering practices. 39. LOWEST ADJACENT GRADE - means the lowest grade adjacent to the walls of a structure. 40. LOWEST FLOOR - also referred to as "finished floor" means the lowest floor of the lowest enclosed area (including entry floor level, living areas, garage, walk-out, basement), along with electrical and mechanical equipment, and ductwork. An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirement of Section 60.3 of the National Flood Insurance Program regulations. 41. MASTER DRAINAGE PLAN - A scientific and engineering report compiling hydrologic and hydraulic data pertinent to the determination of special flood hazard areas and the mitigation of those areas located in the drainage basin of a waterway. 42. MANUFACTURED HOME - means a structure transportable in one or more sections, which is built on a permanent chassis and designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days. For insurance purposes the term "manufactured home" does not include park trailers, travel trailers, recreational vehicles, and other similar vehicles. 43. MANUFACTURED HOME PARK OR SUBDIVISION - means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. 44. MEAN SEA LEVEL - means, for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. 45. NATURAL STATE (HISTORIC DEVELOPMENT) - means the cover and topography of land before any development. 46. NEW CONSTRUCTION - means, for floodplain management purposes, structures for which the "start of construction" commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures. 47. NEW MANUFACTURED HOME PARK OR SUBDIVISION - means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community. 48. ONE HUNDRED YEAR FREQUENCY RAINSTORM (BASE FLOOD) - is the rainstorm having an average statistical frequency of occurrence in the order of once in one hundred (100) years, although the rainstorm may actually occur at any time. 49. RECREATIONAL VEHICLE - means a vehicle which is (i) built on a single chassis; (ii) 400 square feet or less when measured at the largest horizontal projections; (iii) designed to be self-propelled or permanently towable by a light duty truck; and (iv) designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. 50. START OF CONSTRUCTION - includes substantial improvement and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alterations of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. 51. STORMWATER RUNOFF - that portion of the rainfall that is drained into the stormwater drainage system. 52. STRUCTURE - means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. 53. SUBSTANTIAL DAMAGE - means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. 54. SUBSTANTIAL IMPROVEMENT - means any repair, reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure before "start of construction" of the improvement. This includes structures which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include either (1) any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions, or (2) any alteration of a "historic structure", provided that the alteration will not preclude the structure's continued designation as a "historic structure." 55. VARIANCE - is a grant of relief to a person from the requirements of this Ordinance when specific enforcement would result in unnecessary hardship. A variance, therefore, permits construction or development in a manner otherwise prohibited by this Ordinance. (For full requirements see Section 60.6 of the National Flood Insurance Program regulations). 56. VIOLATION - means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required is presumed to be in violation until such time as that documentation is provided. 57. WATER SURFACE ELEVATION - means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929 (or other datum, where specified), of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

(Ord. 2382, November 1997; Ord. No. 2586, § 1, 11-27-00; Ord. 2853, § 1, May 24, 2004; Ord. 3053, § 7, November 13, 2006).

Ask a question about Edmond law

Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.