23.40.090 - Floodplain Development Permit Procedures.
A. A Floodplain Development Permit shall be required prior to development in any Area of Special Flood Hazard. B. The Floodplain Administrator shall render judgment on requests for Floodplain Development Permits except for those cases involving variances. C. The City Council shall hear and render judgment on requests for Floodplain Development Permits involving variances, or in cases when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this Ordinance. Before scheduling such an item before the City Council, the applicant shall present his case to the Stormwater Drainage Advisory Board. The Stormwater Drainage Advisory Board will then forward its recommendation to the City Council. D. The Floodplain Administrator may schedule any Floodplain Development Permit application for discussion at a Stormwater Drainage Advisory Board Meeting. E. Approval or denial of a Floodplain Development Permit shall be based on all of the provisions of this Ordinance and the following relevant factors: 1. The danger to life and property due to flooding or erosion damage; 2. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; 3. The danger that materials may be swept onto other lands to the injury of others; 4. The compatibility of the proposed use with existing and anticipated development; 5. The safety of access to the property in times of flood for ordinary and emergency vehicles; 6. The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical, and water systems; 7. The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site; 8. The necessity to the facility of a waterfront location, where applicable; 9. The availability of alternative locations not subject to flooding or erosion damage for the proposed use; 10. The relationship of the proposed use to the comprehensive plan for that area. F. Any person or persons aggrieved by the decision of the City Council may appeal such decision in the courts of competent jurisdiction, as provided by law. G. The Floodplain Administrator shall maintain a record of all actions involving an appeal and shall report variances to the Federal Emergency Management Agency upon request. H. A Floodplain Development Permit may be issued for the repair or rehabilitation of a structure listed on the National Register of Historic Places or the State Inventory of Historic Places upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the Permit is the minimum necessary to preserve the historic character and design of the structure. I. Upon consideration of the factors noted herein and the intent of this Ordinance, the Floodplain Administrator, Stormwater Drainage Advisory Board, or City Council may attach such additional conditions to the granting of a Floodplain Development Permit as deemed necessary to further the purpose and objectives of this Ordinance. J. A Floodplain Development Permit shall not be issued within any Regulatory Floodplain if the cumulative effect of the proposed development, when combined with all other existing and pending development, increases the base flood elevation more than three (3) inches on the applicant's property, increases the base flood elevation at any other point within the community, or the proposed development is located in the Regulatory Floodway. K. Floodways are located within Areas of Special Flood Hazard and are extremely hazardous areas due to the velocities of floodwaters that carry debris, potential projectiles, and erosion potential. Therefore, encroachments are prohibited, including fill, new construction, substantial improvements, and other development within this Special Flood Hazard Area. L. An application for a Floodplain Development Permit shall be presented to the Floodplain Administrator. The application shall include, but not be limited to three (3) sets of plans drawn to scale showing the location, dimensions, and elevation of the proposed development including landscaping, existing structures, and the location of the foregoing in relation to Areas of Special Flood Hazard. Additionally, the following information is required: 1. Elevation in relation to mean sea level of the lowest floor (including basement) of all new and substantially improved structures; 2. Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed; 3. A certificate from a registered professional engineer or architect that the nonresidential floodproofed structure shall meet the floodproofing criteria established by FEMA; 4. Description of extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development; 5. Submittal of the hydrologic/hydraulic floodplain analysis signed and sealed by a registered professional engineer. M. Variances: 1. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. 2. Variances shall only be issued upon, (i) showing a good and sufficient cause; (ii) a determination that failure to grant the variance would result in exceptional hardship to the applicant, and (iii) a determination that the granting of a variance will not result in additional threats to the public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. 3. Any applicant to whom a variance is granted shall be given written notice that the development will be permitted to be built, and that the cost of flood insurance will be commensurate with the increased risk. N. For any applicant to whom a Floodplain Development Permit is granted, the following provisions are required for all new construction, substantial improvements, or other development (including fill): 1. Shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; 2. Shall be constructed by methods and practices that minimize flood damage; 3. Shall be constructed with materials resistant to flood damage; 4. Shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; 5. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system; 6. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from the systems into flood waters; and, 7. On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding; 8. The lowest floor (including entry floor level, living areas, garage, basement, walk-out, electrical and mechanical equipment, and ductwork) must be elevated a minimum of two (2) feet above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a completed Federal Emergency Management Agency Elevation Certificate to the Floodplain Administrator showing that the standard of this subsection is satisfied. O. Residential Construction. New construction and substantial improvement of any residential structure proposed to be located on a lot that abuts a regulated floodplain shall have the lowest floor (including entry floor level, living areas, garage, basement, walk-out, electrical and mechanical equipment, and ductwork), elevated a minimum of two (2) feet above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a completed Federal Emergency Management Agency Elevation Certificate to the Floodplain Administrator showing that the standard of this subsection is satisfied. Residential structures shall not be allowed within the Regulatory Floodplain or upon areas removed from the Regulatory Floodplain by fill. P. Nonresidential Construction. New construction and substantial improvements of any commercial, industrial, or other nonresidential structure proposed to be located on a lot that abuts a regulated floodplain shall have the lowest floor (including entry floor level, garage, basement, walk-out, electrical and mechanical equipment, and ductwork) elevated a minimum of two (2) feet above the base flood level. A registered professional engineer, architect, or land surveyor shall submit a completed Federal Emergency Management Agency Elevation Certificate to the Floodplain Administrator showing that the standard of this subsection is satisfied. Nonresidential structures shall not be allowed within the Regulatory Floodplain or upon areas removed from the Regulatory Floodplain by fill. Q. Manufactured Homes: 1. All manufactured homes shall be installed using methods and practices which minimize flood damage. For the purposes of this requirement, the lowest floor of a manufactured home must be elevated a minimum of two (2) feet above the base flood and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable State and local anchoring requirements for resisting wind forces. 2. Manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision shall be elevated so that: a) The lowest floor of the manufactured home is at least two (2) feet above the base flood elevation; b) The manufactured home chassis is supported by reinforced piles or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. R. Recreational Vehicles: (i) shall be on site for fewer than 180 consecutive days, (ii) shall be fully licensed and ready for highway use, or (iii) shall meet the Floodplain Development Permit requirements for "manufactured homes" in this section. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions. S. Standard for Subdivision Proposals: 1. All subdivision proposals including manufactured home parks and subdivisions shall be consistent with Section 23.40.020, 030, and 040 of this Title. 2. All proposals for the development of subdivisions including manufactured home parks and subdivisions shall meet the requirements of Section 23.40.060C, Section 23.40.090, and the other provisions of this Ordinance. 3. Base flood elevation data shall be generated for all subdivision proposals and other proposed development including manufactured home parks and subdivisions if not otherwise provided pursuant to Section 23.40.060B or Section 23.40.080(h) of this Title. 4. All subdivision proposals including manufacturing home parks and subdivisions shall have adequate drainage provided to reduce exposure to flood hazards. 5. All subdivision proposals including manufactured home parks and subdivisions shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize or eliminate flood damage. T. FEMA Filings. A Floodplain Development Permit applicant may be required to file paperwork with FEMA and obtain a Letter of Map Amendment or Letter of Map Revision as specified in 44 CFR of the National Flood Insurance Program Regulations and/or if it is a special condition placed on the Floodplain Development Permit by the City. Before receiving the Floodplain Development Permit, the applicant shall post a $20,000 cash bond or letter of credit as collateral for assurance that upon completion of the proposed floodplain development, the applicant will complete this requirement. Upon issuance of the required document from FEMA, the $20,000 cash bond or letter of credit will be returned to the applicant. If the applicant fails to obtain the official document from FEMA, the applicant forfeits this collateral. U. Two-Part Building Permit. A Two-Part Building Permit shall be used for the construction of any structure with a required minimum finished floor elevation. Under the first part of the permit, the permit holder is allowed to proceed up through the pouring of the stemwalls. Upon submittal to the City of surveyed verification from a registered professional engineer or licensed surveyor that the tops of the finished pour of all of the structure's stemwalls meet or exceed the required minimum finished floor elevation, the second part of the Building Permit shall be issued to proceed with the construction of the structure. (Ord. 2382, November 1997; Ord. No. 2586, § 1, 11-27-00; Ord. 2853, § 1, May 24, 2004).
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.