For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-18 — Installation fees; meter installation, etc

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 43-18

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/a22cf47c-c1d0-44f3-8268-e8b4ebc7e17d

Sec. 43-18. - Installation fees; meter installation, etc.

(a) The fees for installation of water service and meter shall be as determined on a schedule of fees provided by the public works director or designee prior to July 1 of each calendar year or, as the cost of materials and labor increase or decrease, the schedule shall be revised to reflect the increases or decreases in cost as necessary, after approval by the council. Fees for connection to the water system and installation or purchase of a water meter shall be paid at the time the building permit is issued. All meters shall be furnished and installed by the city. (b) If a service line has been connected to the city water main to service a particular lot and there are subsequent lot splits and the installed service line does not meet the requirements of the new lot boundary or greenbelt requirement, the owner of the lot or lots shall be responsible for providing proper service line connections to the designated lot or lots. (c) In general, the required meter shall be the same size as the service lines. The meter shall not exceed the size of the service line (i.e., one and one-half (1½) inch meter on a one-inch service line). (d) In all cases where meters, meter boxes, transmitters, antennae, or related equipment are lost, damaged or broken by carelessness or negligence of the property owner, or anyone working for or under the general supervision of the property owner, they shall be replaced or repaired by or under the direction of the environmental services director and the cost will be levied to the property owner. During construction, the builder shall be charged with the care and protection of the meter and related equipment, water lines and meter boxes. If the meter or related equipment, water lines, or meter boxes are broken or damaged, it shall be prima facie negligence of the builder. The items shall be replaced or repaired by or under the direction of the environmental service director and the cost will be levied to the builder. The city shall be responsible only for the proper functioning and registry of the water meter. (e) All commercial dwelling units will be required to be connected to a dedicated water meter providing water solely to said facility. Water meter(s) shall be installed to serve each commercial dwelling unit in a manner as to not disrupt or interfere with any other tenants' water supply. Water supply to commercial dwelling units shall remain separate. Tenants that occupy more than one (1) commercial dwelling unit shall maintain separate water accounts and plumbing to ensure the continued separation of each commercial dwelling unit's utilities. Existing structures and/or those that have new construction/remodel plans approved prior to the effective date of March 28, 2024, that allow multiple commercial dwelling units to operate through a master water meter shall be required to install individual water meters to each commercial dwelling unit when a remodel exceeds fifty (50) percent of the definition of a Level 3 alteration as defined in the city's International Building Code as adopted by reference in chapter 9, for said commercial dwelling unit as calculated cumulatively over the life of the commercial dwelling unit and/or includes modifications to the commercial dwelling unit's plumbing. Water supply to all commercial dwelling units shall remain separate. Tenants that occupy more than one (1) commercial dwelling unit shall maintain separate water accounts and plumbing to ensure the continued separation of each commercial dwelling unit's utilities. (f) All multi-family residential properties will be required to install individual water meters to each multi-story building for apartment complexes or to each dwelling unit for multi-family residential structures with three (3) or more dwelling units. Existing multi-family residential structures and/or those that have new construction/remodel plans approved prior to the effective date of March 28, 2024, that allow multiple residential dwelling units to operate through a master water meter shall be required to install individual water meters to each multi-story building, and/or to each single story multi-family building containing more than three (3) dwelling units, and/or to each dwelling unit for single story multi-family buildings containing three (3) or less dwelling units when a remodel exceeds fifty (50) percent of the assessed value for the multi-story building and/or dwelling unit as calculated cumulatively over the life of the dwelling unit and/or includes modifications to the dwelling unit's plumbing.

(Code 1972, § 37-17; Ord. No. 2004, § 1, 12-11-84; Ord. No. 2029, § 1, 4-23-85; Ord. No. 2107, §§ 1, 2, 3-11-86; Ord. No. 2236, § 1, 12-22-87; Ord. No. 3230, § 1, 4-14-15; Ord. No. 3426, § 1, 10-13-20; Ord. No. 3552, § 2, 3-26-24)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.