For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-32 — Water extension, connection prerequisite to building permit

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 43-32

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/9da84779-0242-4582-9c04-56cc43659816

Sec. 43-32. - Water extension, connection prerequisite to building permit.

(a) No building permit for construction of a new building, relocation of a building, for an addition to an existing building, with said addition expanding the size of the existing structure by fifty (50) percent or no permit for a portable or temporary building when used as the primary structure shall be issued for commercial, apartments, industrial or institutional uses until an approved public water supply is extended to and across the frontage of the property as required by this article. No change in use of an existing building if required by fire prevention codes shall be issued for commercial, apartments, industrial or institutional uses until an approved public water supply is extended to and across the frontage of the property as required by this article. The public water extension and its service connections to the property shall be constructed at no cost to the city. (b) All residential subdivisions (excluding short form plats) shall connect to city water when an existing water main serves any quarter section in which the subdivision is wholly or partially located or is within one-half (½) mile of any exterior boundary of the subdivision, whichever is the greater distance. (c) All water line main construction must conform to the city standards and specifications and plans approved by the city engineer. The size of all water lines shall be in accordance with water master plan on file in the city engineer's office. All water lines along the approximate half-section line shall be a minimum of eight (8) inches in size. (d) For all residential short form plats and single-family building permits, the water line shall be extended across all frontages if any portion of the property in the short form plat or building permit is within one hundred fifty (150) feet excluding street right-of-way of an existing water line. (e) No construction shall be permitted above floor level until water lines and fire hydrants have been installed and accepted by the city. (f) A final inspection of all city-owned water infrastructure shall be required before a certificate of occupancy shall be issued. The line maintenance supervisor or designee shall make available a list of requirements at the request of the owner/builder.

(Ord. No. 1888, § 1(37-43), 7-26-83; Ord. No. 2331, § 1, 3-14-89; Ord. No. 2349, § 1, 5-23-89; Ord. No. 3426, § 2, 10-13-20)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.