Sec. 43-422. - Construction stormwater discharge permit.

(a) All persons or entities defined as an owner/operator of any new utility, industrial, commercial, institutional, multifamily residential facilities, and residential subdivisions shall obtain a construction stormwater discharge permit prior to construction activity. The construction stormwater discharge permit shall be required in addition to any permits required by the state or elsewhere in this Code for stormwater discharges associated with industrial activity or for stormwater discharges associated with construction activity or land disturbing activity. (b) The minimum standards for issuance of a construction stormwater discharge permit shall be a pollution prevention plan, and either an approved general OPDES permit and/or a land disturbing permit. The application for a construction stormwater discharge permit shall be filed with the manager and shall: (1) Include, if the facility is to be covered under a DEQ OPDES permit for stormwater discharges associated with industrial activity, or a general OPDES permit of any type, copies of such documents; (2) Demonstrate how the owner/operator or developer will insure that post-development off-site discharge rates shall not exceed the predevelopment discharge rates; (3) Unless otherwise specified, include calculations of off-site discharges for the existing and developed conditions computed using the 100-year return frequency storm and soil conservation service (SCS Type II) design; (4) Contain plans for facilities that serve an area with ten (10) or more disturbed acres designed to capture the design storm in a sedimentation basin providing three thousand six hundred (3,600) cubic feet of storage per acre drained to reduce the "first flush" pollutant load. Where providing three thousand six hundred (3,600) cubic feet of storage per acre drained is not attainable, small sediment basins of equivalent total volume shall be used; (5) Include in the pollution prevention plan a demonstration of how the facility will collect, control and treat stormwater so as to control the quantity and quality of stormwater leaving the site. The plan shall also include, as necessary, structural controls and nonstructural best management practices adequate to prevent the violation of any water quality standard, and shall meet the provisions of the Clean Water Act (best conventional technology and best available technology treatment requirements) and the DEQ OPDES general permit for stormwater discharges associated with construction activity. (c) The stormwater pollution prevention plan must be reviewed and approved by the manager prior to the issuance of a construction stormwater discharge permit. (d) The manager must receive a NOT or a request for a certificate of occupancy for the facility or subdivision for a final inspection.

(Ord. No. 2842, § 4, 5-28-02; Ord. No. 3186, § 4, 1-8-13)