§ 2.11.50 — Procedures

Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 2.11.50

Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/2a048c67-07a4-468e-b1a8-af528156d2c9

Section 2.11.50 - Procedures.

2.11.50.01 Application Requirements. The Floodplain Administrator or designee may waive any application requirement that the Floodplain Administrator or designee deems to be unnecessary. However, the Floodplain Administrator or designee will ensure that enough information is submitted to properly evaluate a proposed application's adherence to the applicable criteria. The applicant must provide all application materials in a digital file format for electronic records management and archival purposes. The applicant must coordinate with the Floodplain Administrator or designee regarding compatible file formats. Applicants must use forms provided by the Floodplain Administrator or designee and accompanied by: a. Location and description of the subject property(ies), including all of the following, as relevant: street address; tax assessor map and tax lot number; parcel number; written description of the boundaries of the proposal; and one set of assessor's maps of the subject site and surrounding area, with the subject site outlined in red; b. Signed consent by the subject property's owner(s) and/or the owner's legal representative(s). If a legal representative is used as a signatory, written proof of ability to be a signatory must be furnished to the City. The owner's name(s) and address(es), and the applicant's name, address, and signature must also be provided; c. Written Narrative - Approval Criteria: The narrative must describe how the application meets the review criteria in Section 2.11.50.04, below. The narrative must include supplemental information required by Section 4.5.50.03. Related names/numbers must be legible on the graphics. The Floodplain Administrator or designee may also require some or all graphics at a 24 by 36-in. size if, for legibility purposes, such a size would be helpful; d. Site Plan: Site plan graphic(s) must be drawn to scale and contain a sheet title, date, north arrow, bar scale, and legend placed in the same location on each sheet. Site plan graphics must show: 1. Location of all proposed Development including infrastructure necessary to serve the proposed Development. Such infrastructure includes streets, driveways, water, sanitary sewer, and storm drainage; 2. Land uses within 300-ft. of the Development Site; 3. Date(s) of field check(s); 4. A grading plan, if grading is to occur, showing existing and finished contours on the site, at two-ft. contour intervals; 5. Sources of information, such as national, state, or local soil survey maps; and City maps such as Comprehensive Plan and Zoning Maps, the Natural Hazards Map, the Significant Vegetation Map, the Riparian Corridors and Wetlands Map; and date and scale of aerial photos, etc.; 6. Building and Structure Elevations - Elevation in relation to the Highest Adjacent Grade and Base Flood Elevation (using the North American Vertical Datum 1988 (NAVD88)), or the elevation relative to the Flood Depth Number in AO or AH Federal Flood Zones and the Highest Adjacent Grade, as applicable, of the: a. Lowest enclosed area of all existing and proposed, relocated, or expanded buildings and structures. This includes Crawlspaces, basement floors, and attached garages, electrical equipment (except utility meters), heating and ventilation equipment, plumbing, air conditioning equipment, and/or other service facilities (including ductwork); b. Top of proposed garage slabs; and c. Next highest floor situated above the items in "a," and "b," above. 7. Elevation to which any existing building or structure has been or is proposed to be flood-proofed; and certification by a registered professional engineer that the flood-proofing methods for any nonresidential structure meet the flood-proofing criteria in Section 4.5.110.08, below; 8. The locations and sizes of all flood openings in any proposed buildings and structures; 9. A description of the extent to which any Floodplain or Watercourse is proposed to be altered or affected as a result of proposed Development; 10. Topographic Survey - A topographic survey of the Development site, showing existing and proposed topography in two-ft. contour intervals. The survey must indicate the location of Top-of-bank, consistent with the definition in Chapter 1.6 - Definitions. The survey must show the 0.2-ft. Floodway boundary and the 100-yr. Floodway Fringe boundary. The survey must also show the location of existing and proposed improvements on the site, including buildings, structures, fencing, walls, landscaping, storage of materials or equipment, drainage facilities, parking areas, and other impervious surface areas. The survey must be drawn to scale and note the distance from Top-of-bank to the improvements on the site; 11. The extent of all mapped Special Flood Hazard Area on the Development Site. 12. Information required by Chapter 4.2 - Landscaping, Buffering, Screening, and Lighting, Chapter 4.5 - Floodplain Provisions, Chapter 4.11 - Minimum Assured Development Area (MADA), Chapter 4.12 - Significant Vegetation Protection Provisions, Chapter 4.13 - Riparian Corridor and Wetland Provisions, and Chapter 4.14 - Landslide Hazard and Hillside Development Provisions, as applicable; and 13. Any other information relevant to the proposal; e. Adequate information for the Floodplain Administrator or designee to assess whether or not a Substantial Improvement is proposed or Substantial Damage has occurred. See Floodplain Administrator or designee for specific requirements and procedures for these determinations; f. Base Flood Elevation Data: Any data submitted to substantiate Base Flood elevation(s), flood Depth Number(s), Regulatory Floodway boundaries, or 100-year Floodway Fringe boundaries must be compatible with the City's GIS system; and g. Written Narrative—Floodplain Mitigation Assessment: The applicant must include, in a written narrative: 1. either: a) A statement confirming that the applicant has obtained a Floodplain Mitigation Assessment of the proposed development performed by a Qualified Professional; b) A statement that, in addition to being covered by the consultation and biological opinion issued by the National Oceanic and Atmospheric Administration's National Marine Fisheries Service (NMFS) for the Federal Emergency Management Agency's implementation of the National Flood Insurance Program in Oregon (NMFS Consultation No. NWR-2011-3197), the proposed Development is a project or project action that is covered by another formal consultation with NMFS or the United States Fish and Wildlife Service, pursuant to Section 4(d), 7, or 10 of the Endangered Species Act of 1973; c) A statement that the proposed Development fits within the nature and scope of the project types that are addressed in an existing full programmatic habitat assessment of all current and reasonably foreseeable future conditions; or d) A statement that the proposed Development is exempt from the requirement for a Floodplain Mitigation Assessment because it is one or more of the following activities: i. Normal maintenance, repairs, or remodeling of structures, such as re-roofing and replacing siding, that does not (1) alter the footprint or expand the roof of the structure or (2) constitute a Substantial Improvement or repair of Substantial Damage. ii. Routine maintenance of streets, sidewalks, paths and roads (including, but not limited to, filling potholes, repaving, and installing signs and traffic signals) that does not alter contours or culverts, that is less than six inches above grade, and that does not expand paved areas; iii. Routine maintenance of landscaping that does not include grading, excavation, or filling; iv. Routine agricultural practices such as tilling, plowing, harvesting, soil amendments, and ditch cleaning that does not alter the ditch configuration and that removes all spoils from the special flood hazard area or tills spoils into fields as a soil amendment; v. Routine silviculture practices (harvesting of trees), including hazardous fuels reduction and hazard tree removal with root balls left in place; vi. Removal of noxious weeds and hazard trees or replacement of non-native vegetation with native vegetation; vii. Normal maintenance of above and below ground utilities and facilities, such as replacing downed power lines and utility poles that does not result in a net change in footprint; viii. Normal maintenance of a levee or other flood control facility prescribed in the operations and maintenance plan for the levee or flood control facility (this does not include repair from flood damage, expansion of the prism, expansion of the face or toe or addition of protection on the face or toe with rock armor); ix. Habitat restoration activities; x. Activities with the sole purpose of creating, restoring, or enhancing natural functions associated with floodplains, streams, lakes, estuaries, marine areas, habitat, and riparian areas, provided the activities meet federal and state standards and do not include structures, grading, fill, or impervious surfaces; xi. Repair to onsite septic systems, provided ground disturbance is the minimal necessary and best management practices are utilized to prevent stormwater runoff and soil erosion; and xii. Pre-emptive removal of documented susceptible trees to manage the spread of invasive species. 2. If the applicant has confirmed that it has obtained a Floodplain Mitigation Assessment under Section 2.11.50.01.g.1.a above, a statement confirming that the proposed development activities, as shown on the design plans and drawings submitted with the application, include measures to incorporate all mitigation identified in the Floodplain Mitigation Assessment as needed for no net loss of the floodplain functions for flood storage, water capacity, and riparian vegetation conditions. The City will deny a permit to develop in the Special Flood Hazard Area unless the applicant submits a statement meeting the requirements of this Section. h. Determination of Unmapped 100-yr. Floodplain Information - The following information must be included with applications involving properties for which any of the items listed below have not been mapped consistent with Section 4.5.20.01.b, and contain or are suspected to contain a portion of the 100-yr. Floodplain. The Developer must submit a scope of work for a Floodplain study to the Floodplain Administrator or designee. The Floodplain Administrator or designee will review the scope of work to determine whether or not it is compliant with established procedures. The scope of work may or may not be required to include off-site areas. The final scope of work and Floodplain study must be prepared by a licensed engineer and reviewed and approved by the Floodplain Administrator or designee. 1. The boundary of the 100-yr. Floodplain. Newly mapped 100-yr. Floodplain areas will be designated High Protection Floodplain; 2. The boundary of the Regulatory Floodway; 3. A determination of the corresponding Federal Flood Zone (e.g., "A1-30," "AE," "AH," approximate "A," and "AO"), as applicable; and 4. The Base Flood Elevation for Federal Flood Zones "A1-30," "AE," "AH," and approximate "A," or flood Depth Number for Federal Flood Zone "AO," as applicable; and i. Other Agency Permits - The Developer must obtain all federally-mandated or state-mandated permits issued by other governmental agencies, or obtaining such permits will be a Condition of Approval to be satisfied prior to issuance of any construction permit. Such permits include but are not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334, 16 U.S.C. 1531-1544, and State of Oregon Removal-Fill permits, as amended. j. Provisions for New Technical Data When Conditional Letter of Map Revision (CLOMR) and Associated Letter of Map Revision (LOMR) Required - Notwithstanding prohibitions contained in Sections 4.5.80.01, 4.5.90.02, and 4.5.100, exceptional circumstances directly related to the construction of public infrastructure may necessitate an increase in the Base Flood Elevation within the Regulatory Floodway and/or Floodway Fringe. The Floodplain Administrator or designee is responsible for determining whether exceptional circumstances exist. The Developer is also responsible for: 1. Having technical data prepared in a format required for a Conditional Letter of Map Revision (CLOMR) or Letter of Map Revision (LOMR) and submitting such data to FEMA on the appropriate application forms. Submittal and processing fees for these map revisions is the responsibility of the Developer; 2. Covering all costs associated with obtaining a CLOMR or LOMR from FEMA. The City of Corvallis is under no obligation to sign the Community Acknowledgement Form, which is part of the CLOMR/LOMR application; 3. Obtaining FEMA approval for the CLOMR or LOMR and including the written documentation of the approval to the Floodplain Administrator or designee as part of the application materials for a Floodplain Development Permit required by Chapter 2.11 - Floodplain Development Permit; and 4. Obtaining from FEMA, within six months of project completion, a LOMR reflecting the as-built changes to the FIRM, and providing a copy of the FEMA-approved materials to the Floodplain Administrator or designee. This provision applies when the applicant obtains an approved CLOMR from FEMA, or when the applicant's Development modifies Floodplain boundaries or Base Flood Elevations. 2.11.50.02 Acceptance of Application. Per ORS 227, the Floodplain Administrator or designee will review the Floodplain Development Permit application for compliance with the application requirements in Section 2.11.50.01, above. If the application is incomplete, the Administrator or designee will notify the applicant and state what information is needed to make the application complete. Unless the Floodplain Administrator or designee determines that additional time is warranted, the applicant will have a maximum of 10 days from this notification to submit additional materials. 2.11.50.03 Staff Evaluation. The Floodplain Administrator or designee will review an application and any comments that have been received to ensure the application is consistent with the review criteria in Section 2.11.50.04, below. 2.11.50.04 Review Criteria. Requests for approval of a Floodplain Development Permit will be reviewed by the Floodplain Administrator or designee to ensure: a. Consistency with the standards from Sections 4.5.80, 4.5.90, and 4.5.100, as applicable; b. New Development and Subdivisions will have public utilities and facilities such as sewer, gas, electric and water systems located and constructed to minimize flood damage; c. On-site waste disposal systems will be located and constructed to avoid functional impairment, or contamination from them during flooding; d. Subdivisions will have adequate drainage provided to reduce exposure to flood hazards. In AO and AH Federal Flood Zones, stormwater management is provided by the applicant to guide floodwater around and away from all proposed and existing structures. These criteria will be considered satisfied if the proposed stormwater management is consistent with the provisions of the Building Code, Chapter 4.0 - Improvements Requirement with Development, and the provisions addressed in "e," below; e. Consistency with other applicable standards of this Code; the standards of all acknowledged City Facility Master Plans; the Engineering Standards; the adopted Oregon Structural Specialty Code; the adopted International Fire Code; the Construction Specifications; the adopted City Erosion Prevention and Sediment Control Ordinance; the City Site Development Design Standards; and any other applicable policies and standards adopted by the City Council; f. Preservation and/or protection of Significant Natural Features is achieved, consistent with Chapter 4.2 - Landscaping, Buffering, Screening, and Lighting, Chapter 4.5 - Floodplain Provisions, Chapter 4.11 - Minimum Assured Development Area (MADA), Chapter 4.12 - Significant Vegetation Protection Provisions, Chapter 4.13 - Riparian Corridor and Wetland Provisions, and Chapter 4.14 - Landslide Hazard and Hillside Development Provisions; and g. The applicant has provided a statement meeting the requirements of Section 2.11.50.01.g (Written Narrative - Mitigation Assessment). 2.11.50.05 Action on Application. Based on the review criteria above, the Floodplain Administrator or designee will review the proposed Development and either approve, conditionally approve, or deny the Floodplain Development Permit application. Floodplain Development Permits are processed like Building Permits, using a Ministerial Development process. 2.11.50.06 Mandatory Conditions of Approval. The following Conditions of Approval are mandatory and will be imposed on every approved Floodplain Development Permit: a. Required As-built Certification During Construction - For all new construction and Substantial Improvements, the permit holder must provide to the Floodplain Administrator or designee an as-built certification of the floor elevation or flood-proofing elevation immediately after the Lowest Floor or flood-proofing is placed and prior to further vertical construction. Any deficiencies identified by the Floodplain Administrator or designee must be corrected by the permit holder immediately and prior to work proceeding. Failure to submit certification or failure to make the corrections will be cause for the Floodplain Administrator or designee or the Building Official to issue a stop-work order for the project. b. Required Documentation Prior to Issuance of Certificate of Occupancy - 1. In addition to the requirements of the Building Codes pertaining to Certificate of Occupancy, prior to the final inspection the owner or authorized agent must submit the following documentation to the Floodplain Administrator or designee and the documentation must be prepared and sealed by a registered surveyor or engineer: a) For elevated buildings and structures in Special Flood Hazard Areas (all A Federal Flood Zones), the as-built elevation of the Lowest Floor, including basement, or where no Base Flood Elevation is available the height above Highest Adjacent Grade of the Lowest Floor; b) For buildings and structures that have been floodproofed, the elevation to which the building or structure was floodproofed. 2. Failure to submit certification or failure to correct violations will be cause for the Floodplain Administrator or designee or the Building Official to withhold a Certificate of Occupancy until such deficiencies are corrected. 2.11.50.07 Permit. The Floodplain Administrator or designee will provide the applicant with a permit that includes a written statement of the decision, a reference to the findings leading to it, any Conditions of Approval, and the appeal period deadline. The permit will also be mailed to any persons who request such a decision. The permit and all applicable information will be available in the Community Development Department. 2.11.50.08 Permanent Retention of Development Applications. The Floodplain Administrator or designee will maintain both paper and electronic permanent records of all Floodplain Development Permits. 2.11.50.09 Appeals. a. The decision of the Floodplain Administrator or designee may be appealed in accordance with Chapter 2.19 - Appeals. b. Appeal Review Criteria - An appeal of a decision made by either the Floodplain Administrator or designee or the Planning Commission will be reviewed against the criteria set forth in Section 2.11.50.04. In acting on an appeal, the hearing body will make specific findings in response to each of the appeal review criteria. 2.11.50.10 Effective Date. Unless an appeal has been filed, the decision of the Floodplain Administrator or designee becomes effective 12 days after the permit is signed. 2.11.50.11 Effective Period of Approval. a. A Floodplain Development Permit expires 180 days after the permit is effective per Section 2.11.50.10, unless: 1. Start of Construction for the permitted activity has occurred and thereafter is pursued to completion; or 2. An extension consistent with Building Permit extension procedures is granted by the Floodplain Administrator or designee, in cases where Start of Construction has not yet occurred. However, the granting of such extension also requires the Floodplain Administrator or designee to review the Floodplain Development Permit activity(ies) relative to the applicable Code requirements to ensure that the Floodplain Development Permit is still consistent with Code provisions. If the Floodplain Administrator or designee finds that the Floodplain Development Permit is still consistent with the applicable Code requirements, then the extension will be granted by the Floodplain Administrator or designee. If the Floodplain Administrator or designee finds that the Floodplain Development Permit is no longer consistent with the applicable Code requirements, then the Floodplain Administrator or designee will deny the extension request. b. Commencement of work includes Start of Construction, when the permitted work requires a Building Permit.

(Ord. No. 2018-01, eff. 1-26-2018; Ord. No. 2023-27, § 4(Exh. A), eff. 2-28-2024; Ord. No. 2025-31, §§ 2, 7(Exh. A), 7-21-2025)