§ 2.4.70 — Final Plat Review Procedures (Partition, Subdivision, Replat)
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 2.4.70
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/80843bbd-be18-4fdc-9a21-ce09eb47dfb1
Section 2.4.70 - Final Plat Review Procedures (Partition, Subdivision, Replat).
2.4.70.01 Application Requirements. The applicant must submit the following: a. Narrative - A written narrative must be provided that includes an itemized list of the applicable conditions of approval, with a description for each that explains how the condition has been satisfied, or will be satisfied prior to recording of the final plat. b. Final Plat - Two paper originals of the Final Plat, as well as an electronic version of the Plat that is compatible with City formats, must be submitted to the Director. The Final Plat must conform to the approved Tentative Plat and Article IV - Development Standards and any conditions of approval. The Final Plat must also meet Benton County's survey and plat standards and show the following information: 1. For Subdivisions: Name of the Subdivision, as approved by the County Surveyor; 2. Date, north arrow, scale, legend, and existing features such as highways and railroads; 3. Legal description of Subdivision or Partition boundary; 4. Reference and bearings to adjoining recorded surveys; 5. Exact location and width of streets and easements intersecting the boundary of the Subdivision or Partition; 6. For Subdivisions: Subdivision, block, and lot boundary lines. Additionally: a) Lot numbers must begin with the number "1", and must be numbered consecutively in each block. The numbering generally follows the same sequence as sections in a township; b) Block numbers must begin with the number "1", and must be numbered consecutively without omission or duplication throughout the Subdivision. The numbers must be visible as required by state law and placed so as to not obliterate other elements of the Final Subdivision Plat. Block and lot numbers in an addition to a Subdivision of the same name must continue the numbering of the original Subdivision. The numbering sequence must follow the same sequence as sections in a township; and c) Block numbers may be omitted where blocks are of irregular shape. When block numbers are omitted, lots must be numbered consecutively throughout the Subdivision. Lots in an addition to a Subdivision of the same name must continue the numbering of the original Subdivision. 7. Street rights-of-way indicating widths of the rights-of-way and lengths of center lines with dimensions to the nearest 0.01-ft; and bearings, deflection angles, radii, arcs, points of curvature, and tangent bearings. Subdivision boundaries, lot boundaries, and street bearings must be shown to the nearest 30 seconds with basis for bearings; 8. The name of existing streets and, subject to Director approval, the name of proposed streets; the width of existing and proposed streets; and width on each side of street center lines. For streets on a curvature, curve data must be based on the street center line. In addition to center line dimensions, the radius and center angle must be indicated; 9. Easements, clearly identified by fine dotted lines and, if already of record, their recorded reference. If an easement is not definitely located or recorded, a written statement defining the easement is required. The easement's width, length, bearing, purpose, and sufficient ties to locate it with respect to the Subdivision or Partition must be shown. If the easement is being dedicated via the Plat, it must be properly referenced in the owner's certificates of dedication. City Staff must approve written statements defining all easements; 10. Locations and widths of waterways, drainageways, and other Watercourses for review in accordance with Chapter 2.11 - Floodplain Development Permit, Chapter 4.5 - Floodplain Provisions, Chapter 4.13 - Riparian Corridor and Wetland Provisions, and Chapter 4.14 - Landslide Hazard and Hillside Development Provisions; 11. Locations and widths of railroad rights-of-way; 12. Units of land to be dedicated to the City must be distinguished from lots intended for sale, with acreage and alphabetic symbols for each parcel; 13. Notations indicating any limitations on rights of access to or from streets and lots or other units of land; 14. Clear identification of lots that have Solar Access height limitations, including a brief explanation and a reference to documents that specify exact height limits for each lot. See Chapter 4.6 - Solar Access; 15. For Developments of 5 Acres or Larger a) A separate copy of the proposed Final Plat must be provided with notation indicating the proposed Housing Types on the lots that satisfy Housing Type variation provisions if they exist within the relevant zone. See also Section 4.9.80. Single-family detached housing need not be identified; b) To enforce these required Housing Types, a deed declaration must be provided for each affected lot and recorded concurrently with the Final Plat; and c) A note must be provided on the Final Plat that informs lot owners about the existence of deed declarations for each affected lot, describing the Housing Type that is required. 16. A designated space for the following approval signatures or stamps. The following certificates, established by state law, may be combined where appropriate. a) Subdivision - 1) Certificate signed and acknowledged by the owner(s) of record of the land to be subdivided, offering to dedicate all parcels of land for public use and offering to dedicate rights of access to and from prescribed streets and lots of land. Owner certification must be notarized.; 2) Stamp and signature of the registered or licensed surveyor who prepared the Plat; 3) Certificate for execution by the Director; 4) Certificate for execution by the City Engineer; 5) Certificate for execution by the City Finance Director; 6) Certificate for execution by the County Surveyor; 7) Certificate for execution by the Director of the Benton County Department of Assessment; 8) Certificate for execution by the Benton County Tax Collector; and 9) Certificate for execution by the Chair of the Benton County Board of Commissioners. b) Partition - 1) Certificate signed and acknowledged by the owner(s) of record of the land to be partitioned, offering to dedicate all parcels of land for public use and offering to dedicate rights of access to and from prescribed streets and parcels of land. Owner certification must be notarized.; 2) Stamp and signature of the registered or licensed surveyor who prepared the Plat; 3) Certificate for execution by the Director; 4) Certificate for execution by the City Engineer; 5) Certificate for execution by the County Surveyor; 6) Certificate for execution by the Director of the Benton County Department of Assessment; and 7) Certificate for execution by the Benton County Tax Collector. 2.4.70.02 Additional Materials. The Applicant must submit the following additional information with the Final Plat: a. Complete and accurate survey made by a registered or licensed surveyor and pertaining to the land to be subdivided; b. Traverse data on standard work sheets or accurate and complete electronic computations, showing closure of the exterior boundaries of the Subdivision or Partition and of each block in the Subdivision; c. Three copies of all proposed covenants, conditions, and restrictions (CC&Rs) or a written statement signed by the applicant establishing no such restrictions. CC&Rs must reference this Code's requirements affecting the Housing Type and design of residential structures; d. Title guarantee by a Benton County title company doing business in Benton County, showing names of persons whose consent is necessary for preparation of the Final Plat and for any dedication to public use, and their interests therein. This guarantee must certify, for benefit and protection of the City, that persons therein named are all of the persons necessary to give clear title to streets and other easements offered for dedication; e. Statement by the Postal Service to verify location of proposed mail delivery facilities as shown on the Final Plat or accompanying sheet, and location to be approved by the City Engineer; f. Copy of solar envelopes for each lot as necessary for Solar Access protection consistent with Chapter 4.6 - Solar Access, as applicable; and g. Evidence that public assessments, liens, and fees with respect to the property have been paid, or a segregation of assessments and liens has been applied for and granted by the City Council. 2.4.70.03 Review of Final Plat Application and Review Criteria to Determine Compliance with a Tentative Plat. The Director will review a Final Plat and any site development permit required as a condition of the Tentative Plat approval, to determine whether the request complies with the approved Tentative Plat and associated conditions of approval. The Director shall deem the Final Plat to be in compliance when the Final Plat does not involve modifications to this Code's development standards, and does not involve changes to any specific requirements established at the time of Tentative Plat approval. Specific requirements include Conditions of Approval, this Code's requirements, and all aspects of the applicant's proposal that were approved as part of the Tentative Plat. Within 14 days after receiving an application for a Final Plat, the Director will review the Final Plat for compliance with the above submittal requirements and for consistency with the approved Tentative Plat. If an application is consistent with the approved Tentative Plat but is incomplete, the Director will notify the applicant and state what is needed for a complete application. 2.4.70.04 Dedications and Public Utility Requirements. a. The Applicant must dedicate the following items for public use at the time the Final Plat is filed: 1. Lots, parcels or tracts of land shown on the Final Plat as intended for public use; 2. Streets, sidewalks, multi-use paths, drainage channels, easements, and other rights-of-way shown for public use on the Final Plat; and 3. Rights of access to and from streets, lots, and tracts shown on the Final Plat as intended to be surrendered. b. The Applicant must submit evidence of unencumbered and clear title prior to approval of the Final Plat for all land to be dedicated for public use, including but not limited to rights-of-way, drainageways, open space, and easements. Environmental assessments must be conducted in accordance with Chapter 4.0 - Improvements Required with Development. 2.4.70.05 Monumentation Requirements. a. The surveyor must set monuments according to provisions of state law. b. The surveyor will set sufficient permanent monuments prior to recording so that the survey or any part thereof may be retraced according to standards required by the City Engineer. Setting of interior monuments may be delayed with approval of the City Engineer as provided in "d" below. c. The minimum requirements for monumentation and accuracy for a Subdivision Plat or Partition Plat must comply with state law. d. Interior post monumentation may be permitted by approval of the City Engineer at the time of approval of the Tentative Plat or upon special request prior to filing the Final Plat, provided that the applicant: 1. Shows that it is necessary and practical to delay interior monumentation; 2. Agrees to furnish a bond or cash deposit in an amount equal to 120 percent of the estimated cost of performing the work for interior monuments; and 3. Signs an agreement with the project surveyor and City Engineer. The agreement must state the following: a) Amount of the bond or cash deposit to be furnished at the time of submitting the Final Plat; b) Amount the surveyor is to be paid for the work of establishing the interior monuments; c) Adherence to the rules for post monumentation as provided in ORS Chapter 92, as amended; d) Date when monumentation will be completed; and e) Other particulars that may be necessary to ensure complete monumentation at a later date. 2.4.70.06 Installation of Required Improvements. Before obtaining the signature of the City Engineer, the applicant must install required improvements, agree to install required improvements, or have gained approval to form an improvement district for installation of required improvements to public streets, sanitary sewers, storm drainages, water systems, sidewalks, and multi-use paths; electrical power, natural gas, cable television, and telephone services; and other improvements required with the Tentative Plat approval. This condition is required for acceptance and approval of the Final Plat. These procedures are more fully described as follows: a. Install Improvements - The applicant may install the required improvements for the Subdivision or Partition prior to recording the Final Plat. For this procedure, the Plat must contain all the required certifications except those of the County Surveyor and the Board of County Commissioners. The Final Plat will be held by the City until the improvements have been completed and approved by the City Engineer. Upon the City Engineer's approval, the City will forward the Final Plat to Benton County for certification and recording; or b. Agree to Install Improvements - The applicant may execute and file with the City an agreement with the City specifying the period within which required improvements must be completed. The agreement must state that if the work is not completed within the period specified, the City may complete the work and recover the full cost and expense thereof from the applicant. The City requires a performance guarantee as provided in Section 2.4.70.07 below. The performance guarantee agreement may provide for the construction of the improvements in increments and for an extension of time under specified conditions. The Applicant must provide assurances that franchise utility services will be provided as required by Section 2.4.70.08 below; or c. Form Improvement District - The applicant may have all or part of the public improvements constructed under an improvement district procedure. For this procedure, the applicant must enter into an agreement with the City proposing establishment of the district for improvements to be constructed, setting a schedule for installing improvements, and specifying the extent of the Plat to be improved. The City reserves the right under the improvement district procedure to limit the extent of improvements in a Subdivision or Partition during a construction year. The City may also limit the boundaries of the Final Plat to the area to be improved. The City requires a performance guarantee under the improvement district procedure. 2.4.70.07 Performance Guarantee. If the applicant chooses options "b" or "c" in Section 2.4.70.06, above, the following provisions apply: a. The applicant must provide a performance guarantee in one of the following forms: 1. A surety bond executed by a surety company authorized to transact business in the State of Oregon and in a form approved by the City Attorney; or 2. In lieu of the surety bond, the applicant may: a) Deposit with the City Treasurer money to be released only upon authorization of the City Engineer; b) Supply certification by a bank or other reputable lending institution that money is being held to cover the cost of required improvements, to be released only upon authorization of the City Engineer; c) Supply certification by a bank or other reputable lending institution that a line of credit has been established to cover the cost of required improvements, to be released only upon authorization of the City Engineer; d) Provide bonds in a form approved by the City Attorney; e) Provide a lien on properties in a form approved by the City Attorney and of sufficient value as demonstrated by a professional appraisal; or f) Provide other financial security as approved by the City Attorney. b. Such assurance of full and faithful performance must be for a sum determined by the City Engineer as sufficient to cover the cost of required improvements, including related engineering and incidental expenses. c. If the applicant fails to carry out provisions of the agreement and the City incurs expenses as a result, the City will call on the performance guarantee for reimbursement. If the amount of the performance guarantee exceeds the expenses incurred, the remainder will be released. If the amount of the performance guarantee is less than the expenses incurred, the applicant is liable to the City for the difference. 2.4.70.08 Franchise Utility Service. Unless specifically exempted during the review of the Tentative Plat, prior to approval of the Final Plat the applicant must: a. Install franchise utility services; or b. Provide financial assurances to the satisfaction of the City Engineer that electrical power, natural gas, cable television, and telephone service will be provided for each lot. 2.4.70.09 Removal of Existing Services. If the City Engineer determines that existing public utilities or service connections are not required for the proposed Subdivision or Partition, these utilities or connections must be removed prior to approval of the Final Plat. 2.4.70.10 Coordination by Director and Required Signatures. The Director will coordinate review of the Final Plat in accordance with the provisions in Sections 2.4.70.01 through 2.4.70.09. Upon notification by each agency that the Final Plat is satisfactory and confirmation that all Tentative Plat conditions of approval have been satisfied, the Director will notify the applicant that Final Plat mylars must be submitted to the City for signature. Upon receipt of the mylar copies of the Final Plat, the Director will circulate the original copies of the Final Plat for the signatures required in Section 2.4.70.01.b.16. The City Engineer may enter the property to verify that the map is sufficiently correct. The City's approval of the Final Plat does not relieve the applicant from other applicable provisions of this Code or from the Oregon Revised Statutes. 2.4.70.11 Effective Date. Authorization of the Final Plat will become effective when the Final Plat is recorded with the Benton County Clerk. 2.4.70.12 Notice of Recordation. For land divisions subject to housing variety requirements, the Applicant must provide a copy of the recorded Final Plat and associated deed declarations to the Development Services Division. The copy must indicate the Housing Types on the lots that satisfy the Housing Type variation provisions within the relevant zone. 2.4.70.13 Issuance of Building Permits Prior to Installation of Public Improvements. Prior to the issuance of Building Permits for construction on lots, parcels or tracts created by the Final Plat, the applicant must comply with Section 4.0.20 - Timing of Improvements. 2.4.70.14 Revocation of Permits. The Building Official is authorized to revoke building or site development permits to enforce or remedy violations of the provisions of this Section.
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.