12.70.200 - Transportation Studies.
A. Purposes. This Section establishes procedures for traffic management plans, traffic impact analyses, and Transportation Rule Compliance Studies. These procedures are necessary to: 1. Evaluate the identified traffic impacts of proposed development, including traffic capacity and traffic safety; 2. Identify potentially adverse impacts; and 3. Determine the need for transportation services and improvements related to the development. B. Applicability. Land use applications shall provide the analyses listed below (or limited elements thereof) as required by the Review Authority and/or an affected Road Authority. Such analyses shall be provided prior to a land use application being deemed complete under Section 12.70.110, unless approved otherwise by the City Engineer. 1. For Traffic Management Plans: Subsection 12.70.210.A.; 2. For Traffic Impact Analyses: Subsection 12.70.220.A.; and 3. For Transportation Rule Compliance Studies: Section 12.70.230. 4. In the South Hillsboro Plan District (Subchapter 12.65), the standards of this section may be superseded by the standards in Section 12.65.910 as specified in that section. C. Terminology and Acronyms. Terms used in this section are defined in the Highway Capacity Manual 7th Edition and in Section 12.01.500. As used in this section, "within" means any street, alley, bikeway, intersection, site access, or pedestrian facility interior to the project site, and "adjacent" means any such facility which borders on or abuts any portion of the site and may be impacted as a result of the development. Acronyms used in this section are listed in Section 12.01.600. D. Transportation Studies in General. To comply with the requirements of this section, transportation studies shall meet the following standards: 1. Study Components. The analyses listed in subsection B. above shall distinguish between the following: a. Traffic safety improvements found necessary due to the impacts of the project (or phase thereof); and b. Roadway capacity improvements necessary because of the traffic volume generated by the project (or phase thereof). 2. Software Parameters. The traffic analysis software parameters for signalized, unsignalized, and roundabout intersection performance evaluation shall be in compliance with the Oregon Department of Transportation's Analysis Procedures Manual unless specified by the City Engineer. 3. Intersection Capacity Determination. Intersection capacity and delay performance shall be determined for the peak hour as a 60-minute period with a peak hour factor of 1.00 using the Highway Capacity Manual 7th Edition. Identification of 50th and 95th percentile queue requirements shall be determined for the peak 15-minute period using the Highway Capacity Manual 7th Edition unless determined by the City Engineer that traffic simulation would provide more accurate results. 4. When Intersection Simulation Required. When downstream deficiencies impact upstream operations during the peak 15-minutes of peak hour operations, evaluation of upstream operational performance shall include traffic simulation analysis utilizing SimTraffic, Vissim or alternate software and methodology as approved by the City Engineer. Simulation analysis shall be undertaken to determine intersection movement delays, and average and 95th percentile queue length to determine turn lane storage and channelization requirements, unless otherwise approved by the City Engineer. 5. Alternative Analysis Permitted. An alternative intersection analysis method may be approved for use at the sole discretion of the City Engineer when the applicant demonstrates that the alternative method will achieve the objectives of this subchapter. 6. Safety Improvements Evaluation. Transportation safety mitigation improvements shall be identified based upon an evaluation of the past 5-year available crash history for recurrent deficiencies and an assessment of potential future safety deficiencies including but not limited to an evaluation of traffic signal warrants, turn lane warrants, enhanced pedestrian crossing warrants, and turn lane storage lengths required to accommodate the Highway Capacity Manual calculated 50th and 95th percentile queues or the average and 95th percentile queues from simulation. 7. County/State Roads Included. Upon written request by the County Engineer or ODOT Region 1 Engineer or their designee(s), any off-site improvements identified by the study as affecting a County road and/or the State highway system shall be included under the discretion of the City Engineer. 8. Proportionality Estimate Required. The transportation study shall include an analysis of the rough proportionality of the estimated impact of the project (or phase thereof) as compared to the safety and capacity improvements identified as required to comply with the standards of this section. E. Signalized Intersection Analysis: Procedures and Standards. 1. Signal Timing. Signal timing and phasing assumptions in the study shall be included in the study, and are subject to the approval of the Road Authority with management responsibility for the signalized intersection. Signal progression shall also be considered in the analysis. 2. Standards for Signalized Intersections. The impacts of development on a signalized intersection shall identify mitigation necessary to maintain the following standards: a. The peak hour Volume-to-Capacity (V/C) ratio for each lane group shall be no greater than 0.99 unless approved otherwise by the City Engineer. If the intersection is under County or ODOT jurisdiction, the V/C ratio shall not exceed the standards imposed by that jurisdiction or the City standards, whichever is more restrictive. b. Peak hour intersection control delay shall be maintained at 80 seconds per vehicle or less, using a signal cycle length not to exceed 120 seconds, unless a greater cycle length is approved by the Road Authority with management responsibility for the signalized intersection. c. In the event existing control delay or V/C ratio of an intersection exceeds the standards of this subsection, the impacts of development shall be mitigated to maintain or reduce the respective control delay or V/C ratio to pre-development conditions, unless approved otherwise by the City Engineer. 3. Limitations on Mitigation. Intersection mitigation improvements shall not assume lane improvements by approach greater than 2 left turn lanes, 2 through lanes, and 2 right turn lanes unless otherwise approved by the Road Authority. Use of supplemental auxiliary lanes may be considered with approval of the Road Authority where operational analysis identifies their need to facilitate safe and efficient traffic operations. F. Unsignalized Intersection Analysis: Procedures and Standards. 1. Signal Warrant Analysis. If the existing control delay or V/C ratio is greater than the standards in Subsection 12.70.200.F.2., a gap availability study, an alternative access route study, and/or signal warrant analysis shall be completed to establish the appropriateness of intersection signalization. 2. Standards for Unsignalized Intersections. The impacts of development on a unsignalized intersection shall identify mitigation necessary to maintain the following standards: a. Peak hour V/C ratio for each lane group shall be no greater than 0.99 unless otherwise approved by the City Engineer. If the intersection is under County or ODOT jurisdiction, the V/C ratio shall not exceed the standards imposed by that jurisdiction or the City standards, whichever is more restrictive. b. Peak hour control delay by the intersection leg approach shall be maintained at 50 seconds per vehicle or less, unless approved otherwise by the City Engineer. c. In the event existing control delay or V/C ratio of an intersection exceeds the standards of this subsection, the impacts of development shall be mitigated to maintain or reduce the respective control delay or V/C ratio to pre-development conditions, unless approved otherwise by the City Engineer. G. Roundabout Intersection Analysis: Procedures and Standards. 1. Determining Control Delay. Roundabout control delay shall be determined utilizing a methodology approved by the City Engineer and as more particularly described in Oregon Department of Transportation's Analysis Procedures Manual. 2. Capacity for Each Lane Group to be Identified. The V/C ratio for each lane group shall be identified and considered in the determination of intersection performance. 3. Standards for Roundabout Intersections. The impacts of development on a roundabout intersection shall identify mitigation necessary to maintain the following standards: a. Peak hour control delay by lane group at 50 seconds per vehicle or less, unless otherwise approved by the City Engineer. b. Peak hour V/C ratio for each lane group at 0.99 or less unless otherwise approved by the City Engineer. If the intersection is under County or ODOT jurisdiction, the V/C ratio shall not exceed the standards imposed by that jurisdiction or the City standards, whichever is more restrictive. c. In the event existing control delay or V/C ratio of a roundabout exceeds the standards of this subsection, the impacts of development shall be mitigated to maintain or reduce the respective control delay or V/C ratio to pre-development conditions, unless approved otherwise by the City Engineer. H. Transportation Studies as Basis for Mitigation. The Review Authority shall require appropriate safety, capacity, and roadway improvements within or adjacent to the project (or phase thereof) if the Traffic Management Plan, Traffic Impact Analyses, Transportation Rule Compliance Study, or analysis performed by the City Engineer or their designee indicates that on- or off-site mitigation is necessary to meet the standards listed below. 1. On-Site and Adjacent Mitigation. Appropriate safety, capacity, and roadway improvements within or adjacent to the project or phase of a project if the Transportation Study indicates that any of the following thresholds are met as determined by the City Engineer or Road Authority: a. The project or phase of a project will cause unsafe conditions at site accesses or on the roadways or at intersections within or adjacent to the project or phase of a project; b. The required peak hour V/C ratio or required delay for an approach lane group will be exceeded for any impacted site access, intersection, or roadway within or adjacent to the project; c. The proposed off-street parking is insufficient and will increase off-site parking in adjacent neighborhoods or on the adjacent road or street system; or d. Traffic calming measures beyond those proposed by the applicant are necessary to address safety concerns. 2. Off-Site Mitigation. Appropriate safety, capacity, and roadway improvements not within or adjacent to the project or phase of a project if the Transportation Study or analysis performed by the City Engineer or their designee indicates that any of the following thresholds are met: a. The project or phase of a project will contribute toward the need for safety improvements at intersections or on the roadway system other than within or adjacent to the project (known as the "off-site impact area"), or b. The peak hour V/C ratio or control delay for any such impacted intersection or roadway segment within the off-site impact area is projected to exceed the standards defined in subsections E., F., and G. as a result of the project or phase of a project. 3. Construction of Off-Site Improvements Required. a. The Review Authority may condition approval of the land use application to require either the construction of, or payment of a proportionate financial share towards construction of, off-site capacity and/or safety improvements necessary to eliminate the unsafe condition identified in the study and return the street/roadway segment and/or intersection to compliance with required performance standards defined in subsections E., F. or G. above. b. Upon written request by the County Engineer or ODOT Region 1 Engineer or their designee(s), off-site improvements identified by the study as affecting a County road and/or the State highway system may be made a part of the Review Authority's conditions of approval. I. Approval or Denial on Basis of Off-Site Mitigation Construction. 1. If any of the following circumstances exist, the Review Authority shall either deny the land use application or condition the approval as specified in paragraphs 2. through 4. below: a. Construction of the identified off-site improvements within the Study Area will not be guaranteed by the applicant or by the City and/or the County as provided in paragraph H.3. above; b. A traffic safety hazard is created or exacerbated on any street, roadway segment, or intersection within the impact area as a direct result of the project (or phase thereof); or c. The V/C ratio exceeds the standards in subsections E., F., or G. on any street, roadway segment, or intersection within the impact area as a direct result of the project (or phase thereof). 2. If any of the circumstances cited in paragraph 1. above exist, approval of the land use application(s) may include a condition or conditions stipulating that only the portion or phase(s) of the proposed project which can be constructed without exceeding the acceptable performance standard may be built under the current approval. 3. In the case of transportation facilities that are already failing, any improvements shall either mitigate back to pre-project levels, or shall only be allowed to build that portion of the or phase(s) of the project that can be mitigated back to pre-project levels. 4. If the Review Authority restricts construction under paragraph 2. or 3. above, an applicant may apply for approval of additional portions or subsequent phases of the project when traffic and street conditions have changed to the degree where the remainder of the project or phase of a project can meet the safety and performance standards cited in this Section. Any such application shall be accompanied by the appropriate transportation study as otherwise required in this subsection, and will be processed in the same manner as the original application. J. Applicant's Election to Provide Transportation Mitigation. 1. On their own initiative, an applicant may propose (either alone or in conjunction with other parties) to construct and/or finance the construction of identified off-site improvements beyond the limits described in subsection I. above if such improvements would mitigate identified traffic safety hazards or achieve an acceptable V/C ratio. 2. If such a proposal is made by the applicant, the Review Authority may approve the application provided the off-site improvements are guaranteed by methods acceptable to the City Attorney and to the City Engineer and are completed prior to any occupancy within the project (or phase thereof).
(Ord. 6414 § 1, 2022; Ord. 6401 § 1, 2022; Ord. 6393 § 1, 2021; Ord. 6294 § 1, 2019; Ord. 6110 § 9, 2015; Ord. No. 6505, § 1 (Exh. A), 8-19-2025; Ord. No. 6508, § 1 (Exh. A), 11-4-2025)
Ask a question about Hillsboro law
Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.