§ 12.70.230 — Transportation Planning Rule Compliance Analysis
Municipal Code of the City of Hillsboro, Oregon (Codified through Ordinance No. 6513, adopted March 3, 2026 (Supp. No. 2)) · Hillsboro Community Development Code subch. 12.70, § 12.70.230
Corpus is an independent public-information project, not the official City of Hillsboro website. Stable reference: corpuslaw.us/code/fe2461f3-f9bc-4178-8bb1-737a976e4e38
12.70.230 - Transportation Planning Rule Compliance Analysis.
A. Applicability. Compliance with Transportation Planning Rule (TPR) Oregon Administrative Rule (OAR) 660-012-0060 shall be analyzed for any of the following: 1. Zone Change applications; 2. Planned Unit Development applications in which increases in residential density or non-residential intensity (as measured by increased lot coverage or building height above the standards of the underlying zone) are proposed; 3. Community Development Code (CDC) Text Changes affecting uses permitted in a base zone, which may affect future traffic generation from sites in that zone; and 4. Comprehensive Plan Amendment applications. If the proposed application meets the criteria for exemption from TPR analysis as cited in the OAR 660-012-0060, TPR Analysis is not required. B. Analysis Components. The TPR Analysis must include a comparison for the Forecast Year of the reasonable worst case scenario under existing zoning for the subject property or properties to the reasonable worst case scenario for the proposed Comprehensive Plan Map designation, Zone, Planned Unit Development, or change in permitted uses. The Forecast Year shall be the Forecast Year of the City's Transportation System Plan, or 15 years from the date of the analysis, whichever is greater, or an alternate year approved by the City Engineer. C. Transportation Planning Rule (TPR) Analysis Threshold. If the Trip Generation Analysis of a proposed land use designation or zoning indicates that the trip generation of a proposed Comprehensive Plan Amendment, Zone Change, Planned Unit Development, or CDC Text Change is under the thresholds of Section 12.70.220.A. when compared to the current designations for the site, a TPR Analysis is not required unless Section 12.70.220.A.3. is met. If the proposed Comprehensive Plan Amendment, Zone Change, Planned Unit Development, or CDC Text Change will result in an increase in trip generation over the existing designations that meet or exceed the thresholds of Section 12.70.22.A., a TPR Analysis is required. If required, the TPR Analysis shall follow the requirements of Section 12.70.220, except for Subsections 12.70.220.E.3.b, E.3.i, E.3.k, E.5.a, and E.5.c, and shall include the following: 1. An evaluation of whether the development or any phase thereof would change the timing and and/or scope of any long-range transportation needs projected for the Forecast Year in the City's Transportation System Plan or alternative timeframe as approved by the City Engineer; and 2. The extent to which traffic from the proposed development contributes to the long-range improvement needs. D. Mitigation Improvements. If the TPR Analysis identified the need for on- or off-site mitigation, such mitigation may be required by the Review Authority, subject to the approval of the City Engineer, as a condition of approval pursuant to Subsections 12.70.200.H. and I. E. Urban Reserves Assessment. If the proposed Comprehensive Plan Amendment is adjacent to an Urban Reserve as defined by OAR 660-021-0010, an Urban Reserve Assessment is required to ensure the proposed Comprehensive Plan Amendment does not preclude future transportation needs. The Urban Reserves Assessment shall study the same intersections as the TPR Analysis with the projected Urban Reserve trip assignments provided by the City Engineer onto the TPR Analysis total traffic volumes. The analysis shall identify improvements needed to meet the capacity performance criteria in Section 12.70.200. If a TPR analysis is determined not needed by Section 12.70.230.B., a roadway segment level of analysis will be needed unless directed differently by the City Engineer. The Urban Reserves Assessment will recommend a proportionality of the recommended improvement in the Urban Reserve Assessment. The City Engineer will determine whether the proportionality is reasonable.
(Ord. 6414 § 1, 2022; Ord. 6401 § 1, 2022; Ord. 6393 § 1, 2021; Ord. 6250 § 1, 2017)
Ask a question about Hillsboro law
Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.
