§ 12.80.070 — Floodplain Activity
Municipal Code of the City of Hillsboro, Oregon (Codified through Ordinance No. 6513, adopted March 3, 2026 (Supp. No. 2)) · Hillsboro Community Development Code subch. 12.80, § 12.80.070
Corpus is an independent public-information project, not the official City of Hillsboro website. Stable reference: corpuslaw.us/code/e481c952-7950-43e2-84b1-606d13ed06bc
12.80.070 - Floodplain Activity.
A. Purpose. Floodplain Activity (FA) approvals implement the provisions of the RFO. This section shall be read in concert with Section 12.27.100. B. Where Required. FA approvals are required for all development in the RFO as described in Section 12.27.100. C. Procedures. There are 2 types of FAs as described in Section 12.27.100: 1. FA I are subject to the Type I procedure, as described in Section 12.70.030. 2. FA II are subject to the Type II procedure, as described in Section 12.70.040. D. Submittal Requirements. Submittal requirements for Type I and Type II applications are set forth in Sections 12.70.030 and 12.70.040, respectively. At a minimum, an application for a Floodplain Activity permit shall also include the following: 1. An application form signed by the applicant or applicant's representative and the property owner or owner's representative; 2. Payment in full of the appropriate application fee, based on the fee schedule in effect on the date of submittal; and 3. A narrative addressing compliance with all approval criteria and each applicable standard in Section 12.27.130 and 12.27.135. 4. Unless determined to be unnecessary by the City Floodplain Administrator or the City Engineer, a stamped geotechnical report, encompassing all areas of the site's floodplain and areas where fill may be present and where disturbance and/or construction are proposed; 5. If deemed appropriate by the City Floodplain Administrator or the City Engineer, a no-rise analysis certified by a registered professional civil engineer; and 6. Elevation in relation to mean sea level of the lowest floor (including basement) of all structures; 7. Elevation in relation to mean sea level of floodproofing in any structure; 8. Certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure to be floodproofed meet the floodproofing criteria in Section 12.27.135; and 9. Description of the extent to which a watercourse will be altered or relocated as a result of proposed development; and 10. A Plan set clearly depicting the following: a. A wetland and/or 2-year ordinary high water mark delineation prepared by a professional wetland scientist; b. Pre-existing site-surveyed topography, prepared and stamped by a Professional Land Surveyor, using minimum 1-foot contour intervals in the City of Hillsboro Vertical Datum, showing the site's Base Flood Elevation(s) as determined by the Floodplain Administrator or City Engineer; c. The boundaries of the Special Flood Hazard Area (e.g., the 1% annual chance floodplain as shown on the effective Flood Insurance Rate Map) as determined by the Floodplain Administrator. If the floodplain activity involves a critical facility as described in Federal Emergency Management Agency publication #543, the 0.2% chance ("500-year") floodplain as shown on the effective Flood Insurance Rate Map shall be shown as well; d. The nature, location, dimensions, and elevations of the project area as well as any existing and proposed structures, fill, storage of materials, and drainage facilities. E. Approval Criteria. In order to approve a FA the Review Authority shall make findings of fact, based on evidence provided, that the following criteria are satisfied: 1. The proposed use or activity meets all applicable standards listed in Section 12.27.130 and 12.27.135. 2. All other required Federal, State, and local permits have been obtained. F. Conditions of Approval. Pursuant to Section 12.70.120, the Review Authority may impose conditions on the approval of the FA to ensure compliance with the approval criteria and special use standards of Section 12.27.100. G. Appeal of a Decision. Refer to Section 12.70.180. H. Expiration of a Decision. Refer to Section 12.70.140. I. Extension of a Decision. Refer to Section 12.70.150.
(Ord. 6401 § 1, 2022; Ord. 6276 § 1, 2018; Ord. 6120 § 1, 2015; Ord. No. 6500, § 1(Exh. A), 6-17-2025; Ord. No. 6508, § 1 (Exh. A), 11-4-2025)
Ask a question about Hillsboro law
Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.
