For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.80.098 — Subdivision

Municipal Code of the City of Hillsboro, Oregon (Codified through Ordinance No. 6513, adopted March 3, 2026 (Supp. No. 2)) · Hillsboro Community Development Code subch. 12.80, § 12.80.098

Corpus is an independent public-information project, not the official City of Hillsboro website. Stable reference: corpuslaw.us/code/29dc498e-6f4d-4b3e-877c-87b06de7cc79

12.80.098 - Subdivision.

A. When Applicable. An application for a Subdivision (SUB) shall be required for the creation of 4 or more new lots from at least 1 lot of record in 1 calendar year. B. Compliance with ORS Chapter 92. All subdivision proposals shall conform to all state regulations set forth in ORS Chapter 92, Subdivisions and Partitions. C. Procedure. Subdivisions are reviewed through a 2-step process: the preliminary plat and the final plat. 1. The preliminary subdivision plat is subject to the Type II procedure, as described in Section 12.70.040. 2. The final subdivision plat is subject to the Type I procedure, as described in Section 12.70.030. D. Submittal Requirements. General submittal requirements for Type II applications are set forth in Section 12.70.040. More specific submittal requirements are provided on application forms and checklists as authorized in Section 12.70.110. At a minimum, an application for a subdivision preliminary plat shall include the following: 1. The application form, signed by the owner of the property to be subdivided; 2. Payment in full of the appropriate application fee, based on the fee schedule in effect on the date of submittal; 3. A narrative addressing compliance with each approval criterion and applicable development standards and architectural design and construction standards of Subchapter 12.50 as applicable; 4. A vicinity map showing existing conditions within 500 feet of the proposed subdivision, including topography, lotting patterns, utilities and transportation facilities; 5. A connectivity analysis, consistent with Section 12.50.520; and 6. Any additional information identified through a pre-application conference. E. Approval Criteria for Subdivision Preliminary Plat. To approve a subdivision preliminary plat, the Review Authority shall make findings of fact, based on evidence provided, that the following criteria are satisfied: 1. The proposal complies with the criteria and standards of this Code, including the minimum and maximum residential densities of the base zone, if applicable; 2. The proposal provides for necessary public utilities and facilities including, but not limited to, water, sanitary sewer, storm sewer, streets, parks, fire protection, and police protection; 3. The proposal facilitates safe and convenient bicycle and pedestrian connections and access within the proposed subdivision compliant with Section 12.50.420; 4. The proposal facilitates the efficient development of and safe access to and from the proposed subdivision and to adjoining undeveloped properties compliant with Sections 12.50.430 and 12.50.520; 5. The proposal complies with the development and design standards in Subchapter 12.50 relating to street and bicycle/pedestrian design, usable open space, and development and design guidelines, and with any other applicable standards identified at the pre-application conference; 6. The proposal complies with the requirements of any other affected agencies, including but not limited to: Washington County; CWS; DSL; and ODOT; 7. Any oversized lots within the development are configured to allow future division in accordance with the requirements of this Code; and 8. Streets, driveways, and utilities will be sufficiently sized to serve the proposed development and future development on any oversized lots. F. Requests for Minor Adjustments. A request for a Minor Adjustment to any standard shall be made in accordance with Section 12.80.154 and shall be reviewed as part of the subdivision preliminary plat application. The Minor Adjustment process can be used in conjunction with a Subdivision application. The Minor Adjustment process cannot be used to vary or take an exception from the standards listed in Subsection 12.80.150.C. G. Phased Development. If the subdivision is proposed to be developed in phases, the applicant shall include a phasing program with the subdivision preliminary plat application submittal. The applicant shall also provide a schedule for the final platting of the various phases. If the total time period for the final platting of all stages is proposed be longer than 5 years, approval of a new preliminary subdivision plat application shall be required for the remaining unplatted phases. H. Conditions of Approval. Pursuant to Section 12.70.120, the Review Authority may impose conditions on the approval of a preliminary subdivision plat application to ensure compliance with the approval criteria. I. Appeal of a Decision. Refer to Section 12.70.180. J. Expiration of a Decision. Refer to Section 12.70.140. K. Extension of a Decision. Refer to Section 12.70.150. L. Subdivision Final Plat Submittal. An application for subdivision final plat shall be reviewed under the Type I procedure, as described in Section 12.70.030. At a minimum, an application for a final plat shall include the following: 1. The application form, signed by the owner(s) of the property to be subdivided; 2. Payment in full of the appropriate application fee, based on the fee schedule in effect on the date of submittal; 3. A final plat prepared by a land surveyor or engineer licensed to practice in Oregon, incorporating any applicable conditions of approval imposed by the Review Authority under the preliminary subdivision plat approval; 4. A narrative addressing compliance with the preliminary plat approval and all conditions of that approval; 5. Signed and notarized copies of all supplemental documents required by the preliminary plat approval, such as Covenants, Conditions and Restrictions, Waivers of Remonstrance, or easements. M. Subdivision Final Plat Approval Criteria. 1. If the Director determines that the final plat is consistent with the approved preliminary plat, and the conditions of approval have been satisfied, the Director shall sign the final plat as the representative of the Planning Commission. 2. If the Director determines that the final plat is not consistent with the approved preliminary plat, or the conditions of approval have not been satisfied, the Director shall provide findings of fact stating the basis for denial. The applicant may then either submit a revised final plat application or appeal the Director's decision as provided in Section 12.70.180. N. Implementation of Final Plat Approval. 1. The approved final subdivision plat shall be recorded prior to expiration of the original decision. Refer to Section 12.70.140. If the final plat is not recorded within this time, the final plat shall be null and void. If the Director has signed the final plat, but it has not yet recorded, the Director has the authority to revoke the City's approval of the final plat. 2. The applicant shall be responsible for all recording fees and shall provide the City with a copy of the recorded plat within 5 days of the recording. The Director has the authority, as applicable, to stop submittal of building permits, issuance of permits, or issuance of Certificate of Occupancy until provided with copies of the recorded supplemental documents. 3. The applicant shall provide the City with copies of any recorded supplemental documents required by the preliminary plat approval, such as Covenants, Conditions and Restrictions, Waivers of Remonstrance, or easements within 5 days of the recording. The Director has the authority, as applicable, to stop submittal of building permits, issuance of permits, or issuance of Certificate of Occupancy until provided with copies of the recorded supplemental documents. O. Building Permit Issuance. 1. With the exception of a model home as a project sales office pursuant to Section 12.40.200, no residential building permit shall be issued on a lot created by a subdivision plat until the approved final subdivision plat has been recorded at Washington County. 2. Prior to either issuance of an occupancy permit or final inspection, all improvements required by the conditions of approval shall be constructed or the construction shall be guaranteed through a performance bond or other instrument acceptable to the City Engineer. P. Appeal of a Final Decision. Refer to Section 12.70.180. Q. Expiration of a Decision. Refer to Section 12.70.140. R. Extension of a Decision. Refer to Section 12.70.150.

(Ord. No. 6473, §§ 1, 2(Exh. A), 6-18-2024; Ord. 6465 § 2, 2024; Ord. 6401 § 1, 2022; Ord. 6294 § 1, 2019; Ord. 6178 § 1, 2016; Ord. 6149 § 1, 2015; Ord. 6120 § 1, 2015; Ord. No. 6508, § 1 (Exh. A), 11-4-2025)

Ask a question about Hillsboro law

Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.