§ 26.08.020 — Application Requirements
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 26.08.020
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/7562dc0e-6b56-47fb-8a7e-037e99321582
26.08.020 Application Requirements.
Applicants for registration in the Electrical Master Permit (Industrial Plant) Program must be the owner, building operations manager or electrical contractor responsible for all electrical installations in the facility. Each registration must be limited to a single facility, which may be more than one building in a complex of buildings. Applicants with multiple facility locations on noncontiguous lots must obtain a registration for each facility.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
