§ 26.08.050 — No Separate Permit Required

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 26.08.050

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/4d9e417b-daed-46ec-bee2-e9defa155a0a

26.08.050 No Separate Permit Required.

When a facility is registered in the Electrical Master Permit (Industrial Plant) Program, no separate permit is required for repair, alteration or replacement of existing electrical products. Any electrical work not covered by the Electrical Master Permit (Industrial Plant) Program requires the completion and submission of an electrical permit application to the Bureau prior to performing such work. Any installation outside the scope of the Electrical Master Permit (Industrial Plant) Program must be installed by appropriately licensed electricians and must be inspected by the City Administrator.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.