§ 75.020 — Definitions
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 75.020
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/643dd0dc-0c17-4d99-9b24-1c52d588a7f3
Sec. 75.020. - Definitions.
(a) Words and phrases defined in SRC chapter 111 shall have the meanings set forth therein, unless another definition is set forth in this section. (b) The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Applicant means the owner of real property or the owner's authorized agent, and any person who would be required to obtain an erosion control permit, but neglects or otherwise fails to do so. Approved means having received official confirmation by the Director. Authorized agent means the developer, contractor, engineer, builder, personal representative, or anyone designated by the owner to have control or supervision of a site involving a ground disturbing activity. Certified professional means any person licensed as a civil engineer, architect, landscape architect, or landscape designer who is qualified, in the judgment of the Director, to design erosion prevention and sediment control plans or facilities; or any person certified by the State or the International Erosion Control Association as a certified professional in erosion and sediment control; or any person certified by other appropriate National association and who in the judgment of the Director has the knowledge, skills, and abilities to design erosion prevention and sediment control facilities. Clearing means any activity that removes vegetative cover of land. Drainage course means any land surface, ditch, waterway, or other feature which serves as a course for the transmission of surface water and stormwater. EPSC plan or erosion prevention and sediment control plan means a set of plans indicating the specific measures and sequencing or phasing to be used to control erosion and sediment on a development or construction site during and after construction or other ground disturbing activities. Erosion means the wearing away of the ground surface, or the movement, detachment or dislocation and transport of sediment including soil particles by the action of water or wind. Erosion control permit means a permit issued by the City for the construction of facilities for the prevention or control of erosion, runoff, or sediment. Erosion prevention means a measure that prevents or reduces the creation of sediment. Grading means excavation or fill of material, including the resulting conditions, spoils, or byproducts. Ground disturbing activities means any activity that exposes soil through the use of mechanical equipment, including, but not limited to, grading, excavating, filling, clearing, or working of land. Such disturbance may be permanent (i.e., gravel mining, farming, gardening, sports fields, etc.); or temporary or short-term duration such as construction, excavation, fill, grading, landscape installation, or other vegetative clearing activities. Perimeter control means a barrier that prevents sediment from leaving a site by filtering runoff or diverting it to a sediment trap or basin. Public Works Design Standards means the design standards and specifications adopted pursuant to SRC chapter 20J and chapter 802. Sediment means finely divided loose material that can be suspended and transported in water or air and may originate from disturbed soil, landscaping, and construction activities or materials. Sediment control means a measure that prevents or reduces the amount of eroded material leaving the site. Site means a parcel of land or contiguous lots or parcels of land where ground disturbing activities are performed as a single unified operation. Slope means an inclined earth surface, the inclination of which is expressed as the ratio of horizontal distance to vertical distance. Slopes are expressed as a percentage and measured across a horizontal rise and run calculation within any horizontal 25 foot distance. Stabilization means the use of practices that prevent, or reduce to the maximum extent practicable, exposed soil from eroding. Storm drainage system means all conduits, ditches, gutters, catch basins, or any other facilities convenient or necessary to carry away and dispose of stormwater and subsurface drainage, surface water, or unpolluted surplus water. Visible and measurable erosion or sediment means: (1) Deposits or tracking of mud, dirt, sediment, or similar material which exceeds one-half cubic foot in volume, on public or private streets, adjacent property, or into the storm drainage system or a drainage course, either by direct deposit, dropping, discharge, or as a result of the action of erosion; (2) Evidence of concentrated flows of water over bare soils; turbid or sediment laden flows; or evidence of on-site erosion such as rivulets on bare soil slopes, where the flow of water is not filtered or captured before leaving the site; or (3) Earth slides, mud flows, earth sloughing, or other earth movement in excess of one-half cubic foot in volume, which leaves the site. Waterway means any river, stream, or creek within the City, designated by the Director. Wetland means any area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions.
(Prior Code, § 75.020; Ord. No. 39-2001; Ord. No. 26-06; Ord. No. 31-13; Eng. Ord. No. 15-18, § 1, 8-27-2018, eff. 9-26-2018)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
