Sec. 75.060. - Plan requirements.

(a) An application for an erosion control permit shall include all information necessary for the determination of whether the permit should be issued. Such information includes, but is not limited to, an EPSC plan that contains methods and interim facilities to be constructed, used, operated, and maintained during ground disturbing activities to prevent and to control erosion. If the Director finds there is insufficient information contained in the application to determine whether the erosion control permit should be issued, the Director may require the submission of such additional information deemed necessary by the Director to make such determination. An EPSC plan shall be prepared using the techniques and methods contained and prescribed in the Public Works Design Standards. Approved alternate erosion prevention and sediment control techniques may be used if designed by a certified professional and approved by the Director. (b) A single EPSC plan may be submitted for multiple contiguous residential building lots or parcels or multiple building lots or parcels in the same subdivision or partition. (c) EPSC plans for construction projects disturbing 10,000 square feet or more of land surface shall require the stamp or signature of a certified professional.

(Prior Code, § 75.060; Ord. No. 39-2001; Ord. No. 26-06; Ord. No. 34-13)