Sec. 82.050. - Excavations.
(a) General. Unless otherwise recommended in a technical report, excavations shall comply with the provisions of this section. (b) Maximum slope. The finished slope of cut surfaces shall be no steeper than two units horizontal to one unit vertical or as recommended in a technical report. (c) Maximum slope, exceptions. (1) A cut surface shall be permitted to be at a slope of 1.5 units horizontal to one unit vertical provided that all of the following are met: (A) It is not intended to support structures or surcharges; (B) It is protected against erosion; (C) It is no more than eight feet in height; (D) Groundwater is not encountered. (2) A cut surface in bedrock shall be permitted to be at a slope of one unit horizontal to one unit vertical.
(Ord. No. 6-16, § 1(82.050), 5-23-2016)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.