§ 82.055 — Fills

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 82.055

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/472a63f2-4bb0-45d5-9cb6-d654791a535b

Sec. 82.055. - Fills.

(a) General. Unless otherwise recommended in a technical report, fills shall comply with the provisions of this section. (b) Maximum depth and slope. The depth of fill surfaces shall be no more than four feet. The slope of fill surfaces shall be no steeper than two units horizontal to one unit vertical or as recommended in a technical report. (c) Surface preparation. The ground surface shall be prepared to receive fill by removing vegetation, topsoil, and other unsuitable materials, and scarifying the ground to provide a bond with the fill material. (d) Benching. Where the existing grade is at a slope steeper than five units horizontal to one unit vertical and the depth of the fill exceeds five feet, benching shall be provided in accordance with Figure 1. A key shall be provided that is at least ten feet in width and two feet in depth. (e) Fill material. Fill material shall not include organic, frozen, or other deleterious materials. No rock or similar irreducible material greater than 12 inches in any dimension shall be included in fills. Rocks shall be placed so as to assure filling all voids with fines. Topsoil may be used in the top 12-inch surface layer to aid in planting and landscaping. (f) Compaction. All fill material not intended for use for roadway, landscaping or infiltration purposes shall be compacted to 90 percent of maximum density as determined by ASTM D 1557, Modified Proctor, in lifts not exceeding 12 inches in depth. Fill material intended for use for roadway embankments shall be placed and compacted in accordance with the City of Salem Standard Construction Specifications. A higher relative dry density, or additional compaction tests, or both, may be required as determined by a certified professional.

(Ord. No. 6-16, § 1(82.055), 5-23-2016)