§ 538-15 — Post-construction water quality criteria

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 538-15

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/3bcc8bfe-9669-4bda-922b-d77e20d6937a

§ 538-15: Post-construction water quality criteria.

A. No regulated earth disturbance activities within the municipality shall commence until approval by the municipality of a drainage plan which demonstrates compliance with this chapter. This chapter provides standards to meet NPDES permit requirements associated with construction activities and MS4 permit requirements. B. The water quality volume (WQv) shall be captured and treated. The WQv shall be calculated two ways. (1) First, WQv shall be calculated using the following formula: WQv = | (c)(P)(A) 12 (2) Second, the WQv shall be calculated as the difference in runoff volume from predevelopment to post-development for the two-year return period storm. The effect of closed depressions on the site shall be considered in this calculation. The larger of these two calculated volumes shall be used as the WQv to be captured and treated, except that in no case shall the WQv be permitted to exceed 1.25 inches of runoff over the site area. This standard does not limit the volume of infiltration an applicant may propose for purposes of water quantity/peak rate control. C. The WQv shall be calculated for each post-development drainage direction on a site for sizing BMPs. Site areas having no impervious cover and no proposed disturbance during development may be excluded from the WQv calculations and do not require treatment. D. If an applicant is proposing to use a dry extended detention basin, wet pond, constructed wetland or other BMP that ponds water on the land surface and may receive direct sunlight, the discharge from that BMP must be treated by infiltration, a vegetated buffer, filter strip, bioretention, vegetated swale or other BMP that provides a thermal benefit to protect the high-quality waters of the Little Lehigh and Monocacy Creek from thermal impacts. E. The WQv for a site as a result of the regulated activities must either be treated with infiltration or two acceptable BMPs such as those listed in § 538-15, except for minor areas on the periphery of the site that cannot reasonably be drained to an infiltration facility or other BMP. F. Infiltration BMPs shall not be constructed on fill unless the applicant demonstrates that the fill is stable and otherwise meets the infiltration BMP standards of this chapter. G. The applicant shall document the bedrock type(s) present on the site from published sources. Any apparent boundaries between carbonate and noncarbonate bedrock shall be verified through more detailed site evaluations by a qualified geotechnical professional. H. For each proposed regulated activity in the watershed where an applicant intends to use infiltration BMPs, the applicant shall conduct a preliminary site investigation, including gathering data from published sources, a field inspection of the site, a minimum of one test pit and a minimum of two percolation tests, as outlined in Appendix G.[1] This investigation will determine depth to bedrock, depth to the seasonal high water table, soil permeability and location of special geologic features, if applicable. This investigation may be done by a certified Sewage Enforcement Officer (SEO), except that the location(s) of special geologic features shall be verified by a qualified geotechnical professional. I. Sites where applicants intend to use infiltration BMPs must meet the following criteria: (1) Depth to bedrock below the invert of the BMP greater than or equal to two feet; (2) Depth to seasonal high water table below the invert of the BMP greater than or equal to three feet; except for infiltration of residential roof runoff where the seasonal high water table must be below the invert of the BMP (if the depth to bedrock is between two feet and three feet and the evidence of the seasonal high water table is not found in the soil, no further testing to locate the depth to seasonal high water table is required); (3) Soil permeability (as measured by the adapted 25 Pa. Code § 73.15 percolation test in Appendix G[2]) greater than or equal to 0.5 inches/hour and less than or equal to 12 inches per hour; (4) Setback distances or buffers as follows: (a) One hundred feet from water supply wells. (b) Fifteen feet downgradient or 100 feet upgradient from building foundations; except for residential development where the required set back is 15 feet downgradient or 40 feet upgradient from building foundations; (c) Fifty feet from septic system drainfields; except for residential development where the required setback is 25 feet from septic system drainfields. (d) Fifty feet from a geologic contact with carbonate bedrock unless a preliminary site investigation is done in the carbonate bedrock to show the absence of special geologic features within 50 feet of the proposed infiltration area. (e) One hundred feet from the property line unless documentation is provided to show that all setbacks from existing or potential future wells, foundations and drainfields on neighboring properties will be met; except for one- and two-family residential dwellings where the required setback is 40 feet unless documentation is provided to show that all setbacks from existing or potential future wells, foundations and drainfields on neighboring properties will be met. J. For entirely noncarbonate sites, the recharge volume (REv) shall be infiltrated unless the applicant demonstrates that it is infeasible to infiltrate the REv for reasons of seasonal high water table, permeability rate, soil depth or setback distances; or except as provided in § 538-15U. (1) The REv shall be calculated as follows: REv = (0.25)*(I)/12 Where REv | = | Recharge volume in acre/feet. I | = | Impervious area in acres. (2) The preliminary site investigation described in § 538-15H is required and shall continue on different areas of the site until a potentially suitable infiltration location is found or the entire site is determined to be infeasible for infiltration. For infiltration areas that appear to be feasible based on the preliminary site investigation, the additional site investigation and testing as outlined in Appendix G[3] shall be completed. (3) If an applicant proposes infiltration, the municipality may determine infiltration to be infeasible if there are known existing conditions or problems that may be worsened by the use of infiltration. (4) The site must meet the conditions listed in § 538-15I. (5) If it is not feasible to infiltrate the full REv, the applicant shall infiltrate that portion of the REv that is feasible based on the site characteristics. If none of the REv can be infiltrated, REv shall be considered as part of the WQv and shall be captured and treated as described in § 538-15O. (6) If REv is infiltrated, it may be subtracted from the WQv required to be captured and treated. K. In entirely carbonate areas, where the applicant intends to use infiltration BMPs, the preliminary site investigation described in § 538-15H shall be conducted. For infiltration areas that appear feasible based on the preliminary site investigation, the applicant shall conduct the additional site investigation and testing as outlined in Appendix G.[4] The soil depth, percolation rate and proposed loading rate, each weighted as described in § 538-18, along with the buffer from special geologic features shall be compared to the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix D[5] to determine if the site is recommended for infiltration. In addition to the recommendation from Appendix D, the conditions listed in § 538-15I are required for infiltration in carbonate areas. Applicants are encouraged to infiltrate the REv, as calculated in § 538-15J, but are not required to use infiltration BMPs on a carbonate site even if the site falls in the recommended range on the chart in Appendix D. Any amount of volume infiltrated can be subtracted from the WQv to be treated by noninfiltration BMPs; if infiltration is not proposed, the full WQv shall be treated by two acceptable BMP's, as specified in § 538-15O. L. If a site has both carbonate and noncarbonate areas, the applicant shall investigate the ability of the noncarbonate portion of the site to fully meet this chapter to meet the requirements for REv for the whole site through infiltration. If that proves infeasible, infiltration in the carbonate area as described in § 538-15K or two other noninfiltration BMPs as described in § 538-15O must be used. No infiltration structure in the noncarbonate area shall be located within 50 feet of a boundary with carbonate bedrock, except when a preliminary site investigation has been done showing the absence of special geologic features within 50 feet of the proposed infiltration area. M. If infiltration BMPs are proposed in carbonate areas, the post-development two-year runoff volume leaving the site shall be 80% or more of the predevelopment runoff volume for the carbonate portion of the site to prevent infiltration of volumes far in excess of the predevelopment infiltration volume. N. Site areas proposed for infiltration shall be protected from disturbance and compaction except as necessary for construction of infiltration BMPs. O. If infiltration of the entire WQv is not proposed, the remainder of the WQv shall be treated by two acceptable BMPs in series for each discharge location. Sheet flow draining across a pervious area can be considered as one BMP. Sheet flow across impervious areas and concentrated flow shall flow through two BMPs. If sheet flow from an impervious area is to be drained across a pervious areas as one BMP, the length of the pervious area must be equal to or greater than the length of impervious area. In no case may the same BMP be employed consecutively to meet the requirement of this section. Acceptable BMPs are listed below along with the recommended reference for design: Best Management Practice | Design Reference NumberC BioretentionA | 4, 5, 11, 16 Capture/reuseB | 4, 14 Constructed wetlands | 4, 5, 8, 10, 16 Dry extended detention ponds | 4, 5, 8, 12, 18 Minimum disturbance/minimum maintenance practices | 1, 9 Significant reduction of existing impervious cover | N/A Stormwater filtersA (sand, peat, compost, etc.) | 4, 5, 10, 16 Vegetated buffers/filter strips | 2, 3, 5, 11, 16, 17 Vegetated roofs | 4, 13 Vegetated swalesA | 2, 3, 5, 11, 16, 17 Water quality inletsD | 4, 7, 15, 16, 19 Wet detention ponds | 4, 5, 6, 8 NOTES: A | This BMP could be designed with or without an infiltration component. If infiltration is proposed, the site and BMP will be subject to the testing and other infiltration requirements in this chapter. B | If this BMP is used to treat the entire WQv, then it is the only BMP required because of this BMP's superior water quality performance. C | See table below. D | Water quality inlets include such BMPs as oil/water separators, sediment traps/catch basin sumps and trash/debris collectors in catch basins. Number | Design Reference Title 1 | "Conservation Design For Stormwater Management - A Design Approach to Reduce Stormwater Impacts From Land Development and Achieve Multiple Objectives Related to Land Use," Delaware Department of Natural Resources and Environmental Control, the Environmental Management Center of the Brandywine Conservancy, September 1997. 2 | "A Current Assessment of Urban Best Management Practices: Techniques for Reducing Nonpoint Source Pollution in the Coastal Zone," Schueler, T. R., Kumble, P. and Heraty, M., Metropolitan Washington Council of Governments, 1992. 3 | "Design of Roadside Channels with Flexible Linings," Federal Highway Administration, Chen, Y. H. and Cotton, G.K., Hydraulic Engineering Circular 15, FHWA-IP-87-7, McLean Virginia, 1988. 4 | "Draft Stormwater Best Management Practices Manual," Pennsylvania Department of Environmental Protection, January 2005. 5 | "Evaluation and Management of Highway Runoff Water Quality," Federal Highway Administration, FHWA-PD-96-032, Washington, D.C., 1996. 6 | "Evaporation Maps of the United States," U.S. Weather Bureau (now NOAA/National Weather Service) Technical Paper 37, Published by Department of Commerce, Washington, D.C., 1959. 7 | "Georgia Stormwater Manual," AMEC Earth and Environmental, Center for Watershed Protection, Debo and Associates, Jordan Jones and Goulding, Atlanta Regional Commission, Atlanta, Georgia, 2001. 8 | "Hydraulic Design of Highway Culverts," Federal Highway Administration, FHWA HDS 5, Washington, D.C., 1985 (revised May 2005). 9 | "Low-Impact Development Design Strategies an Integrated Design Approach," Prince Georges County, Maryland Department of Environmental Resources, June 1999 10 | "Maryland Stormwater Design Manual," Maryland Department of the Environment, Baltimore, Maryland, 2000. 11 | "Pennsylvania Handbook of Best Management Practices for Developing Areas," Pennsylvania Department of Environmental Protection, 1998. 12 | "Recommended Procedures for Act 167 Drainage Plan Design," LVPC, revised 1997. 13 | "Roof Gardens History, Design and Construction," Osmundson, Theodore, New York: W.W. Norton and Company, 1999. 14 | "The Texas Manual on Rainwater Harvesting," Texas Water Development Board, Austin, Texas, Third Edition, 2005. 15 | "VDOT Manual of Practice for Stormwater Management," Virginia Transportation Research Council, Charlottesville, Virginia, 2004. 16 | "Virginia Stormwater Management Handbook," Virginia Department of Conservation and Recreation, Richmond, Virginia, 1999. 17 | "Water Resources Engineering," Mays, L. W., John Wiley and Sons, Inc., 2005. 18 | "Urban Hydrology for Small Watersheds," Technical Report 55, US Department of Agriculture, Natural Resources Conservation Service, 1986. 19 | US EPA, Region 1 New England website (as of August 2005) http://www.epa.gov/NE/assistance/ceitts/stormwater/techs/html. P. Stormwater runoff from hot spot land uses shall be pretreated. (1) In no case may the same BMP be employed consecutively to meet this requirement and the requirement in § 538-15O. Acceptable methods of pretreatment are listed below. Hot Spot Land Use | Pretreatment Method(s) Vehicle maintenance and repair facilities including auto parts stores | Oil/water separators Use of drip pans and/or dry sweep material under vehicles/equipment Use of absorbent devices to reduce liquid releases Spill prevention and response program Vehicle fueling stations | Water quality inlets Spill prevention and response program Storage areas for public works | Water quality inlets Use of drip pans and/or dry sweep material under vehicles/equipment Use of absorbent devices to reduce liquid releases Spill prevention and response program diversion of stormwater away from potential contamination areas Outdoor storage of liquids | Spill prevention and response program Salvage yards and recycling facilities* | BMPs that are a part of a stormwater pollution prevention plan under an NPDES permit Fleet storage yards and vehicle cleaning facilities* | BMPs that are a part of a stormwater pollution prevention plan under an NPDES permit Facilities that store or generate regulated substances* | BMPs that are a part of a stormwater pollution prevention plan under an NPDES permit Marinas* | BMPs that are a part of a stormwater pollution prevention plan under an NPDES permit Certain industrial uses (listed under NPDES)* | BMPs that are a part of a stormwater pollution prevention plan under an NPDES permit NOTES: * | Regulated under the NPDES stormwater program. (2) Design references for the pretreatment methods, as necessary, are listed below. If the applicant can demonstrate to the satisfaction of the municipality that the proposed land use is not a hot spot, then the pretreatment requirement would not apply. Pretreatment Method | Design ReferenceA Constructed wetlands | 4, 5, 8, 10, 16 Diversion of stormwater away from potential contamination areas | 4, 11 Stormwater collection and reuse (especially for irrigation) | 4, 14 Stormwater filters (sand, peat, compost, etc.) | 4, 5, 10, 16 Vegetated swales | 2, 3, 5, 11, 16, 17 Water quality inlets | 4, 7, 15, 16, 19 NOTES: A | These numbers refer to the Design Reference Title Chart in § 538-15O above. Q. The use of infiltration BMPs is prohibited on hot spot land use areas. R. Stormwater infiltration BMPs shall not be placed in or on a special geologic feature(s). Additionally, stormwater runoff shall not be discharged into existing on-site sinkholes. S. Applicants shall request, in writing, public water suppliers to provide the Zone I wellhead protection radius, as calculated by the method outlined in the Pennsylvania Department of Environmental Protection Wellhead Protection regulations, for any public water supply well within 400 feet of the site. In addition to the setback distances specified in § 538-15I, infiltration is prohibited in the Zone I radius as defined and substantiated by the public water supplier, in writing. If the applicant does not receive a response from the public water supplier, the Zone I radius is assumed to be 100 feet. T. The volume and rate of the net increase in stormwater runoff from the regulated activities must be managed to prevent the physical degradation of receiving waters from such effects as scour and stream bank destabilization, to satisfy state water quality requirements, by controlling the two-year post-development runoff to a 30% release rate. U. The City may, after consultation with DEP, approve alternative methods for meeting the state water quality requirements other than those in this section, provided that they meet the minimum requirements of and do not conflict with state law including but not limited to the Clean Streams Law.[6]

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.