For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-903.3 — Volume controls

Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 9-903.3

Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/c42e973f-cf12-4884-a076-9f6988054675

§ 9-903.3: Volume controls.

A. The low-impact development practices provided in the BMP Manual and in Appendix B of this Part 9 shall be utilized for all regulated activities to the maximum extent practicable.[1] B. Stormwater runoff volume controls shall be implemented using the Design Storm Method or the Simplified Method. For regulated activities equal to or less than one acre, this Part 9 establishes no preference for either method; therefore, the applicant may select either method on the basis of economic considerations, the intrinsic limitations on applicability of the analytical procedures associated with each methodology, and other factors. (1) The Design Storm Method (CG-1 in the BMP Manual) is applicable to any sized regulated activity. This method requires detailed modeling based on site conditions. (a) Do not increase the post-development total runoff volume when compared to the predevelopment total runoff volume for the two-year twenty-four-hour storm event. (b) For hydrologic modeling purposes: [1] Existing nonforested pervious areas must be considered meadow (good condition) for predevelopment hydrologic calculations. [2] Twenty percent of existing impervious area, when present on the proposed project site and contained within the new proposed limit of disturbance, shall be considered meadow (good condition) for predevelopment hydrologic calculations for redevelopment. (2) The Simplified Method (CG-2 in the BMP Manual) is independent of site conditions and should be used if the Design Storm Method is not followed. This method is not applicable to regulated activities greater than one acre. For new impervious surfaces: (a) Stormwater facilities shall capture at least the first two inches of runoff from all new impervious surfaces. (b) At least the first one inch of runoff from new impervious surfaces shall be permanently removed from the runoff flow, i.e., it shall not be released into surface waters of the commonwealth. Removal options include reuse, evaporation, transpiration, and infiltration. (c) Wherever possible, infiltration facilities should be designed to accommodate infiltration of the entire permanently removed runoff; however, in all cases at least the first 0.5 inch of the permanently removed runoff should be infiltrated. C. All applicable worksheets from Chapter 8 of the BMP Manual must be used when establishing volume controls. D. Actual field infiltration tests at the location of the proposed elevation of the stormwater BMPs are required when 1,000 square feet or greater of new impervious surface is added. Infiltration tests shall be conducted in accordance with BMP Manual. The infiltration tests for new impervious surfaces of 5,000 square feet or greater shall be certified by a registered geologist or professional geotechnical engineer in the commonwealth, certified soil scientist or geomorphologist. The City of Harrisburg shall be notified 24 hours prior to infiltration tests being conducted so as to provide an opportunity for the City to witness the tests. Infiltration rates of all approved BMPs shall be field verified during construction, immediately prior to installing of the device. E. A waiver from the infiltration requirement, regardless of the area of new impervious surface, must be requested, in writing, and include a report prepared and sealed by a registered geologist or professional geotechnical engineer in the commonwealth, or by a soil scientist or geomorphologist sealed by a registered professional. The report should include an analysis of field work performed on site supporting the location of testing, basis for establishing the limiting zone, and soils analyses with infiltration rates of likely locations of prospective BMPs. All other provisions of the approving agency shall be satisfied prior to issuance of a waiver. F. If it is determined by the approving agency that infiltration of all or part of the increased runoff volume is not feasible, the increased volume shall be routed through a BMP that is deemed acceptable by the approving agency to provide volume reduction, flow attenuation, and water quality enhancement, which include underdrained filters, underdrained bioretention, swales with check dams, ponds/wet basins, and constructed wetlands. (See Table E-1, Appendix E, for a complete list.) Underdrained systems shall retain the increased volume for not less than 24 nor more than 72 hours. Editor's Note: Appendixes A, B, and C are included as attachments to this Part 9.

Ask a question about Harrisburg law

Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.