§ 9-903.4 — Rate controls
Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 9-903.4
Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/d99a7aed-bc6f-4938-8154-8c9df0264bed
§ 9-903.4: Rate controls.
A. For lands contained within the City of Harrisburg that have not had release rates established under an approved Act 167 stormwater management plan, post-development discharge rates shall not exceed the predevelopment discharge rates for the one-year, two-year, ten-year, twenty-five-fifty-year and one-hundred-year storms. B. For lands contained within the City of Harrisburg that have had release rates established under an approved Act 167 stormwater management plan [Paxton Creek and Spring Creek (West)]: (1) Post-development discharge rates shall not exceed the predevelopment discharge rates for the one-year, fifty-year, and one-hundred-year storms. (2) For the two-, ten-, and twenty-five-year storms, the post-development peak discharge rates shall be in accordance with the approved Act 167 plan release rate map, or, for areas situated outside the limits of the Paxton Creek or Spring Creek watersheds, the post-development discharge rates shall not exceed the predevelopment discharge rates. C. For lands contained within a Paxton Creek Watershed Provisional No-Detention District: (1) These watershed areas may discharge post-development peak runoff without detention facilities. However, the applicant must prove that the local runoff conveyance facility which transports runoff from the site to the Main Channel has adequate capacity to safely transport unattenuated increased peak flows for a twenty-five-year storm in accordance with § 9-903.5. Also, in the case of the site draining to a combined sewer, peak sewage flows shall be included in the hydraulic analysis. If there is inadequate capacity, the applicant shall either use 100% release rate control or provide increased capacity of downstream drainage facilities to convey increase peak flows consistent with § 9-903.5. When determining if adequate capacity exists in the local watershed drainage network, the applicant must assume that the entire local watershed is developed per current zoning and that all new development will use the least restrictive runoff controls specified by this Part 9. (2) Increases in peak flow to a combined sewer shall be considered in evaluating the site's Act 537 sewage facility planning. D. Off-site areas that drain through a proposed development site are not subject to release rate criteria when determining allowable peak runoff rate; however, on-site drainage facilities shall be designed to safely convey off-site flows through the development site. E. For a proposed development site which is located within two or more release rate districts, the maximum runoff discharged at any point shall be equal to the release rate for the district in which the discharge point is located. In the event that a portion of the site is located in a provisional no-detention area, no runoff from portions of the site located in areas subject to release rate controls may be drained to or through the provisional no-detention area.
Ask a question about Harrisburg law
Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
