§ 306 — TRENCHING, EXCAVATION AND BACKFILL
The Philadelphia Code (2026 Code: The Philadelphia Code and Home Rule Charter current through October 8, 2026) · Philadelphia Code Subcode P, § 306
Corpus is an independent public-information project, not the official City of Philadelphia website. Stable reference: corpuslaw.us/code/58158501-bb87-4080-ab1e-2f6c5cc96991
SECTION 306 TRENCHING, EXCAVATION AND BACKFILL
* * * P-306.2.3 Soft load-bearing materials. If soft materials of poor load-bearing quality are found at the bottom of the trench, stabilization shall be achieved by overexcavating not less than two pipe diameters and backfilling to the installation level of the bottom of the pipe with fine gravel, crushed stone or a concrete foundation. The concrete foundation shall be bedded with sand tamped into place so as to provide uniform load-bearing support for the pipe between joints. When drainage is installed in filled or unstable ground, pipe shall be supported on concrete piers, seven feet apart, or a constant bed of concrete or clevis hangers attached to reinforcing rods in the concrete floor above the piping. * * * P-306.4 Tunneling. Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from subsequent uneven loading. Where earth tunnels are used, adequate supporting structures shall be provided to prevent future settling or caving. Tunneling shall be limited to only that required to clear the obstacle above. P-306.5 Shoring. Shoring shall be installed in ditches and trenches as per the Occupational Safety and Health Administration’s (OSHA) Excavation standards, 29 Code of Federal Regulations (CFR), Subpart P. * * *
Ask a question about Philadelphia law
Corpus searches the Philadelphia sections it holds and shows the ones that match, with their citations. Free, no sign-in.