For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1303.03 — Volume Controls

Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 1303.03

Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/e800e360-a449-4f54-a455-edc8689ebf30

§ 1303.03: Volume Controls.

Preferred and approved stormwater BMPs, as identified in the City of Pittsburgh Stormwater Design Manual, shall be used for meeting the regulatory requirements for all regulated activities. Water volume controls shall be implemented using the Design Storm Method in subsection A or the Simplified Method in subsection B below. a. The Design Storm Method (CG-1 in the PA BMP Manual) is applicable as a method to any size of regulated activity. This method requires detailed modeling based on site conditions. The following shall be incorporated into the Design Storm Method: 1. Do not increase the post-development total runoff volume for all storms equal to or less than the two-year, twenty-four-hour duration precipitation. 2. Runoff from at least the annual 95th Percentile Rainfall Event using future climate change rainfall projections within the City of Pittsburgh Stormwater Design Manual shall be permanently removed from the runoff flow, i.e., it shall not be released into the sewer system or surface waters of this Commonwealth. 3. Removal options include reuse, evaporation, transpiration, and infiltration. Demonstration of technical infeasibility for the removal of runoff shall meet infeasibility criteria thresholds established within the City of Pittsburgh Stormwater Design Manual. If removal of the runoff is deemed infeasible, and the Designated Plan Reviewer agrees, runoff shall be detained and meet water quality release rate requirements as stipulated within the City of Pittsburgh Stormwater Design Manual. Fee-in lieu payments for not meeting the volume requirement within this Chapter are provided in Section 1303.03.F. 4. For modeling purposes: A. Existing (pre-development) non-forested pervious areas shall be calculated using permeability coefficients for meadow in good condition, in efforts to be as conservative as possible in existing conditions modeling. B. Twenty (20) percent of existing impervious area, when present, shall be calculated using permeability coefficients for meadow in good condition in the model for existing conditions. The intent of this is to start calculations from a baseline that is closer to naturally-occurring, pre-urbanization conditions, realizing that impervious cover has detrimental hydrologic impacts. b. The Simplified Method (CG-2 in the PA BMP Manual) provided below is independent of site conditions and should be used if the Design Storm Method is not followed. This method is not applicable to regulated activities greater than one (1) acre or for projects that require design of stormwater storage facilities. For impervious surfaces: 1. Stormwater facilities shall capture at least the first two (2) inches of runoff from impervious surface. 2. Runoff from at least the 95th Percentile Rainfall Event using future climate change rainfall projections within the City of Pittsburgh Stormwater Design Manual shall be permanently removed from the runoff flow, i.e., it shall not be released into the sewer system or surface waters of this Commonwealth. 3. Removal options include reuse, evaporation, transpiration, and infiltration. Demonstration of technical infeasibility for the removal of runoff shall meet infeasibility criteria established within the City of Pittsburgh Stormwater Design Manual. If removal of runoff is deemed infeasible, and the Designated Plan Reviewer agrees, runoff shall be detained and meet design requirement for non-infiltrating BMPs as stipulated within the City of Pittsburgh Stormwater Design Manual. c. Volume control incentives and offsets. 1. Applicants that manage additional volume in excess of the requirements of this Title may be eligible for a volume control incentive grant payment per additional cubic foot of storage volume provided up to two and one-half (2.5) inches of precipitation over impervious surfaces either within the proposed development or within lands outside of the proposed development but owned by the applicant. Volume control incentive grant payment rates shall be as stipulated in the City of Pittsburgh Stormwater Design Manual and are subject to the availability of funds. 2. Applicants meeting the volume control requirement using a combination of preferred BMPs, water reuse, and active controls as defined in the City of Pittsburgh Stormwater Design Manual, will be eligible for a five-business day SWM Site Plan review. 3. Subject to requirements outlined in the City of Pittsburgh Stormwater Design Manual, applicants may offset the volume control requirement by managing an equivalent area of impervious surface outside of the project site but within lands owned by the applicant. 4. Subject to requirements outlined in the City of Pittsburgh Stormwater Design Manual, applicants may implement volume control projects on lands owned by the applicant to offset volume requirements for future development projects. Should volume control requirements change between the time when the offsetting project is implemented and when the future development project occurs, the volume control offset will be prorated accordingly. Volume offsets shall be transferable in the event that the property is sold or otherwise transferred to a different owner than the applicant. 5. Volume control offset projects must fully meet the requirements of this Title. 6. Approval of volume control offsets under this Title does not necessarily authorize this approach for meeting NPDES permit requirements. d. In cases where the applicant believes that meeting the volume control requirement is technically infeasible using preferred or approved BMPs, the applicant must either submit an innovation approval request per Section 1303.03(e) and/or submit a technical infeasibility determination as part of the SWM Site Plan to determine if volume control requirements can be met in whole or in part using an in-lieu fee payment as described in Section 1303.03(f). The technical infeasibility determination report shall at least include, but is not limited to, engineering calculations, geologic reports, results of geotechnical investigations and infiltration testing, hydrologic analyses, and site maps, as defined in the City of Pittsburgh Stormwater Design Manual. Within the technical infeasibility determination report, applicants must demonstrate the technical infeasibility of each approved BMP for each drainage area within the proposed project site according to BMP-specific technical infeasibility criteria defined in the City of Pittsburgh Stormwater Design Manual. e. Applicants wishing to meet volume control requirements using innovative BMPs not listed as preferred or approved BMPs may submit an innovation approval request to the City authorizing the use of innovative technologies on a case-by-case basis. The innovation approval request must include 1) evidence that the BMP is approved by a recognized third party certification program listed in the City of Pittsburgh Stormwater Design Manual, or 2) performance data collected in accordance with data collection protocols listed in the City of Pittsburgh Stormwater Design Manual, or 3) a study plan for a pilot project in accordance with pilot project study plan requirements provided in the City of Pittsburgh Stormwater Design Manual and for which the pilot project proposes to provide management for no more than ten (10) percent of the total regulated drainage area of the project site. f. Applicants must pay, as a pre-requisite of City issuance of SWM Site Plan approval, a one time fee in-lieu payment for each drainage area for which the volume control requirement cannot be met using preferred or approved BMPs, and for which the City has determined that the technical infeasibility determination is justified, less any areas for which the volume control requirement is being met using offsets or via an innovation approval request. The one time fee in-lieu payment shall be six hundred thousand dollars ($600,000.00) per acre-inch of the required volume for each drainage area to meet the volume control requirement per Section 1303.03. The fee in-lieu payment amount may be adjusted annually after January 1, 2022 based on the percentage change in the United States Bureau of Labor Statistics Consumer Price Index for All Urban Consumers for all items for the Pittsburgh area. Fee in-lieu payments are not available as a compliance alternative to meet rate control requirements. g. Determination of technical infeasibility by the City for purposes of issuing SWM Site Plan approval shall not imply that technical infeasibility has been established for purposes relating to obtaining NPDES permit authorization.

[ Ord. No. 12-2019 , art. III, § 13303, eff. 3-20-2019 ; Ord. No. 34-2021 , § 1, eff. 10-11-2021 ]

Ask a question about Pittsburgh law

Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.