§ 1303.04: Rate Controls.
Rate control requirements are regulated based on the project site location and its respective watershed. Special rate control watersheds include: Allegheny County Act 167 watersheds (Section 1303.04.a) and Public Health and Safety watersheds (Section 1303.04.b). For project sites that overlap both Allegheny County Act 167 watersheds and Public Health and Safety watersheds, rate control calculations for both provisions shall be performed and the more stringent release rate shall govern. For areas not covered by either Allegheny County Act 167 watersheds or the Public Health and Safety watersheds, rate control requirements are regulated to the requirements in Section 1303.04.c. a. For areas covered by the maximum-allowable release rate map from the approved Allegheny County Act 167 Stormwater Management Plan: For the 1-, 2-, 5-, 10-, 25-, 50-, and 100-year, twenty-four-hour rainfall events, the post-development peak discharge rates will follow the applicable approved release rate maps and procedures incorporating the use of future climate rainfall projections provided in the City of Pittsburgh Stormwater Design Manual. b. For areas covered by the City public health and safety release rate map: The City has identified watersheds with infrastructure that are subject to capacity restrictions and therefore pose a risk to public health and safety associated with basement sewage backups and surface flooding. The public health and safety release rate requirement minimizes the impact of runoff from development within the identified watersheds. For watersheds identified on the public health and safety release rate maps, post-development discharge rates shall not exceed the pre-development discharge rates for the 1-, 2-, 5-, 10-, 25-, 50-, and 100-year, 24-hour rainfall events using the rainfall estimates and procedures incorporating the use of future climate change rainfall projections provided within the City of Pittsburgh Stormwater Design Manual. Post-development discharge rates also shall meet the public health and safety release rate requirements using future climate change rainfall projections within the City of Pittsburgh Stormwater Design Manual. c. For areas not covered by the maximum-allowable release rate map from the approved Allegheny County Act 167 Stormwater Management Plan (Refer to Section 1303.04.a), or by the City public health and safety release rate map (refer to Section 1303.04.b): Post-development discharge rates shall not exceed the pre-development discharge rates for the 1-, 2-, 5-, 10-, 25-, 50-, and 100-year, 24-hour rainfall events using the rainfall estimates and procedures incorporating the use of future climate change rainfall projections provided within the City of Pittsburgh Stormwater Design Manual. d. For modeling purposes, whether or not the area is covered by a City public health and safety and/or an Allegheny County Act 167 maximum-allowable release rate map: 1. Existing (pre-development) non-forested pervious areas shall be calculated using permeability coefficients for meadow in good condition. 2. Twenty (20) percent of existing impervious area, when present, shall be calculated using permeability coefficients for meadow in good condition in the model for existing conditions. The intent of this is to start calculations from a baseline that is closer to naturally-occurring, pre-urbanization conditions, realizing that impervious cover has detrimental hydrologic impacts. e. Rate control incentives and points of interest. 1. Applicants that provide rate control in excess of the requirements of this Chapter may be eligible for a rate control incentive grant payment per additional acre-inch of storage volume provided. Rate control incentive payment rates shall be as stipulated in the City of Pittsburgh Stormwater Design Manual and are subject to the availability of funds. 2. Rate control and volume control incentive grant payments are not additive. 3. Subject to requirements outlined in the City of Pittsburgh Stormwater Design Manual, applicants may meet rate control requirements at a downstream point of interest that includes lands owned by the applicant but outside of the project site, so long as the point of interest is located upslope of the discharge to the public sewer system.
[ Ord. No. 12-2019 , art. III, § 13305, eff. 3-20-2019 ; Ord. No. 34-2021 , § 1, eff. 10-11-2021 ]
Ask a question about Pittsburgh law
Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.