§ 17-97 — Miscellaneous drainage requirements
Code of Ordinances of the City of North Charleston, South Carolina (Supp. No. 76: codified through Ordinance No. 2026-022, adopted June 25, 2026) · North Charleston Code of Ordinances § 17-97
Corpus is an independent public-information project, not the official City of North Charleston website. Stable reference: corpuslaw.us/code/5400de01-044b-466a-a7f1-b2961215421c
Sec. 17-97. - Miscellaneous drainage requirements.
(a) Required drainage connection: Street drainage and subdivision drainage shall be tied into a canal which is maintained by a public agency, a tidal stream with bottom elevation of approximately mean low water or lower, or a running stream with continuous flow (fresh water creek), of adequate size. (b) Drainage easements: Drainage easements of the widths herein required shall be provided and properly dedicated. (c) Drainage and other work involving another public agency: If drainage is taken into a canal or ditch maintained by a public agency other than the city, or if work is done within the right-of-way of a public agency other than the city, written approval must be obtained from the public agency and a copy of this approval must be furnished to the city engineer. (d) Minimum cover over drainage pipelines: Ample cover shall be provided to properly protect the pipelines during the time that the street is under construction and shall not be less than six (6) inches at subgrade for paved streets and twelve (12) inches for earth type streets. (e) Catch basin requirements for piped frontages, easements, etc.: Where open ditches are piped, catch basins shall be provided as required to take care of the surface drainage, to take care of incoming drainage, at angle points, etc., and in no case shall the catch basins be more than two hundred (200) feet apart.
Ask a question about North Charleston law
Corpus searches the North Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.