For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-171 — Wastewater discharge permits and authorization letters

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-171

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/c62c01cc-f4e5-4634-9446-e625de5e559e

Sec. 29-171. - Wastewater discharge permits and authorization letters.

(a) Generally. Any person proposing to contribute nondomestic wastes to the city's sewer system shall apply to the city at least 90 days prior to contributing such wastes. If the city determines that such contribution will be significant, the user shall be designated a significant industrial user and shall be required to obtain a significant industrial user permit prior to discharge. Non-significant industrial users shall be required to obtain an industrial user permit, zero discharge permit or an authorization letter from the city prior to discharge. (b) Waste haulers. All waste haulers are required to obtain permits from the city to discharge into the POTW. To provide control over these discharges, nondomestic waste haulers will be required to provide a manifest for these wastes. The manifest must show the origin, nature and volume of the wastes, and it must be signed and time dated by an official of the business generating the waste. Nondomestic wastes may be discharged to the city's system only at points designated by the city and only during hours designated by the city. (c) Permit application. Users required to obtain a wastewater discharge permit shall complete and file with the city an application on the form prescribed by the city, and accompanied by a fee as established by the city. Existing users shall apply for a wastewater discharge permit within 180 days after the effective date of the ordinance from which this article is derived, and proposed new users shall apply at least 90 days prior to connecting to or contributing to the system. The city will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the city may issue a significant industrial user permit, an industrial user permit, a zero discharge permit or an authorization letter subject to the terms and conditions provided in this article. (d) Permit modifications. Within nine months of the promulgation of a national categorical pretreatment standard, the wastewater discharge permit of users subject to such standards shall be revised to require compliance with such standard within the timeframe prescribed by such standard. Where a user subject to a national categorical pretreatment standard has not previously submitted an application for a wastewater discharge permit as required by subsection (a) of this section, the user shall apply for a wastewater discharge permit within 180 days after promulgation of the applicable national categorical pretreatment standard. In addition, the user with an existing wastewater discharge permit shall submit to the city within 180 days after the promulgation of an applicable federal categorical pretreatment standard the information required by subsections (e)(9) and (e)(10) of this section. (e) Permit conditions. Wastewater discharge permits shall be expressly subject to all provisions of this article and all other applicable regulations, user charges and fees established by the city. Permits may contain the following: (l) The unit charge or schedule of user charges and fees for the wastewater to be discharged to a city sewer. (2) Limits on the average, maximum and instantaneous wastewater constituents and characteristics based on applicable pretreatment standards. (3) Best management practices and narrative standards based on applicable pretreatment standards. (4) Limits on average and maximum rate and time of discharge, or requirements for flow regulation and equalization. (5) Requirements for installation and maintenance of inspecting and sampling facilities. (6) Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number, types and standards for tests, and reporting schedule. (7) Compliance schedules. (8) Requirements for submission of technical reports or discharge reports (section 29-172). (9) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city, including records related to compliance with best management practices and affording the city access thereto. (10) Requirements for notification to the city of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system. (11) Requirements for notification of slug discharges. (12) Requirements to control slug discharges, if determined by the city to be necessary. (13) Other conditions as deemed appropriate by the city to ensure compliance with this article. (f) Permit duration. Permits shall be issued for a specified time period, not to exceed five years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. The user shall apply for permit issuance a minimum of 180 days prior to the expiration of the user's existing permit. The terms and conditions of the permit may be subject to modification by the city during the term of the permit as limitations or requirements as identified in this article are modified or other just cause exists. The user shall be informed of any proposed changes in its permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. (g) Permit transfer. A wastewater discharge permit is issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without the written approval of the city. Any succeeding owner or user shall also comply with the terms and conditions of the existing permit. (h) Discharge authorization letter. A wastewater discharge authorization letter shall normally be issued for an unspecified time period. An authorization may be issued for a specified duration when warranted by specific conditions. Each wastewater discharge authorization letter shall expressly allow the user to discharge its nondomestic wastes into the city's sewer system, and the discharger shall comply with the requirements of this ordinance and the general and specific prohibitions as shown in 40 CFR 403.5 and in section 29-241 of this article. The city may withdraw its authorization and require the user to obtain a wastewater discharge permit if deemed necessary by the city to protect its sewer system, sludge, public health or receiving stream. (i) Slug discharge control plans. The city shall evaluate whether each SIU needs an accidental discharge/slug discharge control plan or other action to control slug discharges. The city may require any industrial user to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control slug discharges. An accidental discharge/slug discharge control plan shall address, at a minimum, the following: (1) Description of discharge practices, including non-routine batch discharges; (2) Description of stored chemicals; (3) Procedures for immediately notifying the city of any accidental or slug discharge, as required by subsection 29-172(d) of this article; and (4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (j) No wastewater permits or authorizations outside York County. In no event shall any discharge be accepted by the city pursuant to this article for any wastewater from any area or person outside York County, South Carolina or for portable loads exceeding 2,500 gallons unless such load restriction is specifically approved/waived by the city. Fees for services under this subsection shall be in accordance with section 29-222.

(Ord. No. 2013-50, § 4(Exh. A), 11-25-2013; Ord. No. 2018-50, § 3, 8-27-2018)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.