For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-172 — Reporting requirements for permittees

Municipal Code of the City of Rock Hill, South Carolina (Codified through Ordinance No. 2026-49, adopted October 12, 2026. (Supp. No. 95, Update 1)) · Rock Hill Municipal Code § 29-172

Corpus is an independent public-information project, not the official City of Rock Hill website. Stable reference: corpuslaw.us/code/96044922-3869-4b2c-bd8f-cd3d88be8b8d

Sec. 29-172. - Reporting requirements for permittees.

(a) Compliance date report. Within 90 days following the date for final compliance with applicable pretreatment standards, or, in the case of a new source, following commencement of the introduction of wastewater into the system, any user subject to pretreatment standards and requirements shall submit to the city a report indicating the nature and concentration of all pollutants in the discharge from the regulated process which are limited by pretreatment standards and requirements and the average and maximum daily flow for these process units in the user facility which are limited by such pretreatment standards or requirements. The report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis and, if not, what additional operation and maintenance and/or pretreatment is necessary to bring the user into compliance with the applicable pretreatment standards or requirements. This statement shall be signed by an authorized representative of the industrial user and certified by a professional engineer registered in the state. (b) Periodic compliance reports. (1) Any user subject to a pretreatment standard, after the compliance date of such pretreatment standard, or, in the case of a new source, after commencement of the discharge into the system, shall submit to the city twice per year as specified in the permit, unless required more frequently in the pretreatment standard or by the city, a report indicating the nature and concentration of pollutants in the effluent which are limited by such pretreatment standards. In addition, this report shall include a record of all daily flows which during the reporting period exceeded the average daily flow reported pursuant to section 29-171. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the city or the pretreatment standard necessary to determine the compliance status of the user. (2) The city may impose mass limitations on a user where dilution enables the user to meet applicable pretreatment standards or requirements, or in other cases where the imposition of mass limitations is appropriate. In such cases, the report required by subsection (b)(1) of this subsection shall indicate the mass of pollutants regulated by pretreatment standards in the effluent of the user. These reports shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass where requested by the city, of pollutants contained therein which are limited by the applicable pretreatment standards. The frequency of monitoring shall be prescribed in the applicable pretreatment standards. (3) All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the city or other parties approved by EPA. (4) All wastewater samples must be representative of the user's discharge obtained through appropriate sampling and analysis performed during the period covered by the report. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (c) Reports of changed conditions. Each user must notify the city of any significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 30 days before the change. The city may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application. (d) Reports of potential problems. In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a slug discharge or slug load, that might cause potential problems for the POTW, the user shall immediately telephone and notify the city of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (e) Report changes that affect the potential for a slug discharge. Significant industrial users are required to notify the city immediately of any changes at its facility affecting the potential for a slug discharge. (f) Repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the city within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the city within 30 days after becoming aware of the violation. Resampling by the industrial user is not required if the city performs sampling at the user's facility at least once per month or if the city performs sampling at the user's facility between the time when the initial sampling was conducted and the time when the user or the city receives the results of this sampling.

(Ord. No. 2013-50, § 4(Exh. A), 11-25-2013)

Ask a question about Rock Hill law

Corpus searches the Rock Hill sections it holds and shows the ones that match, with their citations. Free, no sign-in.