§ 31-51 — Prohibitions and limitations on discharge into the Publicly Owned treatment works
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-51
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/3cd190b5-953c-459c-8135-bea10c843ebb
Sec. 31-51. - Prohibitions and limitations on discharge into the Publicly Owned treatment works.
(a) Purpose and policy. This section establishes limitations and prohibitions on the quantity and quality of wastewater which may be lawfully discharged into the publicly owned treatment works. Pretreatment of some wastewater discharges will be required to achieve the goals established by this article and the Clean Water Act. The specific limitations set forth in Paragraph (i) hereof, and other prohibitions and limitations of this article, are subject to change as necessary to enable the city to provide efficient wastewater treatment, to protect the public health and the environment, and to enable the city to meet requirements contained in its NPDES permit. The director shall review said limitations from time to time to insure that they are sufficient to protect the operation of the treatment works, the health and safety of ISS personnel, to enable the treatment works to comply with its NPDES permit, to provide for a cost effective means of operating the treatment works, and to protect the public health and the environment. The director shall recommend changes or modifications as necessary. ..... (b) Prohibited pollutants. No person shall introduce into the publicly owned treatment works any pollutant(s) which cause pass through or interference. Additionally, the following specific prohibitions apply: ..... (1) Pollutants which create a fire or explosion hazard in the POTW,, including, but not limited to, pollutants with a closed cup flashpoint of less than 140 degrees Fahrenheit (sixty degrees (60°) Centigrade), as determined by a Pensky-Martens Closed Cup Tester, using the test method specified in the American Society for Testing and Materials (ASTM) standard D-93-79 or D-93-80k or a Setaflash Closed Cup Tester, using the test method specified in ASTM Standard D-3278-78 and pollutants which cause an exceedance of ten percent (10%) of the lower explosive limit (LEL) at any point within the POTW; ..... (2) Pollutants which cause corrosive structural damage to the POTW, but in no case discharges with a pH lower than five (5.0) or higher than ten and one-half (10.5); ..... (3) Solid or viscous pollutants in amounts which cause obstruction to the flow of the sewers, or other interference with the operation of or which cause injury to the POTW; including waxy or other materials which tend to coat and clog a sewer line or other appurtenances thereto; ..... (4) Any pollutant, including oxygen demanding pollutants (BOD, etc.), released in a discharge (slug) of such volume or strength as to cause interference in the POTW or individual unit operations or cause adverse effects on its workers or the environment; ..... (5) Heat in amounts which will inhibit biological activity in the POTW resulting in interference, but in no case heat in such quantities that the temperature at the treatment works influent exceed forty degrees (40°) Centigrade (one hundred four degrees (104°) Fahrenheit). Unless a higher temperature is allowed in the user's wastewater discharge permit, no user shall discharge into any sewer line or other appurtenance of the POTW wastewater with a temperature exceeding sixty-three and one-half degrees (63.50°) Centigrade (one hundred fifty degrees (150°) Fahrenheit). ..... (6) Petroleum oil, non-biodegradable cutting oil, or products of mineral oil origin in amounts that will cause interference or pass through. ..... (7) Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause acute worker's health and safety problems. ..... (8) Any trucked or hauled pollutants, except at discharge points designated by the POTW. ..... (9) Noxious or malodorous liquids, gases, solids, or other wastewater which, either singly or by interaction with other wastes, is sufficient to create a public nuisance or a hazard to life, or to prevent entry into the sewers for maintenance or repair. ..... (10) Wastewater which imparts color that cannot be removed by the treatment process, such as dye wastes and tanning solutions, and consequently imparts color to the treatment plant's effluent, thereby violating the City's NPDES permit. ..... (11) Stormwater, surface water, ground water, roof runoff, subsurface drainage, condensate, noncontact cooling water, and unpolluted wastewater, unless specifically authorized by the director. ..... (12) Sludges, screenings, or other residues from the pretreatment of industrial wastes. ..... (13) Medical wastes, unless specifically authorized by the director. ..... (14) Wastewater which, alone or in conjunction with other wastes, causes the treatment plant's effluent to fail toxicity testing. ..... (15) Detergents, surface active agents, or other substances that cause excessive foaming at the POTW. ..... (c) Affirmative Defenses. A user shall have an affirmative defense in any action brought against it alleging a violation of the general prohibitions established in paragraph (b) of this section and the specific prohibitions in paragraphs (b)(3), (4), and (5) of this section where the user can demonstrate that: ..... (1) It did not know or have reason to know that its discharge, alone or in conjunction with a discharge or discharges from other sources, would cause pass through or interference; and ..... (2) (A) A local limit designed to prevent pass through and/or interference, as the case may be, was developed pursuant to Section 31-51(i) and (j) for each pollutant in the user's discharge that caused pass through or interference, and the user was in compliance with each such local limit directly prior to and during the pass through or interference; or (B) If a local limit designed to prevent pass through and/or interference, as the case may be, has not been developed for the pollutant(s) that caused the pass through or interference, and the user's discharge directly prior to and during the pass through or interference did not change substantially in nature of constituents from the user's prior discharge activity when the POTW was regularly in compliance with the POTW's NPDES permit requirements and, in the case of interference, applicable requirements for sewage sludge use or disposal. ..... (d) Wastewater Constituent Evaluation. The wastewater of every industrial user shall be evaluated using the following criteria: ..... (1) Wastewater containing any element or compound which is not adequately removed by the treatment works which is known to be an environmental hazard; ..... (2) Wastewater causing a pass through, discoloration, foam, floating oil or grease, or any other condition in the quality of the city's treatment works' effluent such that receiving water quality requirements established by law cannot be met; ..... (3) Wastewater causing conditions at or near the city's treatment works which violate any statute, any rule, or regulation, of any public agency of this state or the United States; ..... (4) Wastewater containing any element or compound known to act as a lacrimator, known to cause nausea, or known to cause odors constituting a public nuisance; ..... (5) Wastewater causing interference with the effluent or any other product of the treatment process, residues, sludges, or scums causing them to be unsuitable for reclamation, reuse, causing interference with the reclamation process, or causing them to be unsuitable for disposal; ..... (6) Wastewater discharged at a point in the collection system that is upstream of any overflow, bypass, or combined sewer overflow and which may thereby cause special environmental problems or specific discharge limitations; ..... (7) Wastewater having constituents and concentrations in excess of those listed in section 31-51(i), or cause a violation of the limits in section 31-51(j). ..... (8) The capacity of existing sewer lines to carry the anticipated wastewater flow, particularly with respect to any problems, overflows, or overloads caused by heavy rain infiltration. ..... (9) The toxicity of each wastewater shall be evaluated by an appropriate biomonitoring technique to determine if a specific discharge may significantly affect the overall toxic level of the POTW influent. ..... The director or the Board, as applicable, shall establish reasonable limitations or prohibitions or monitoring requirements in addition to the limits established pursuant to Section 31-51(e) and (i) in the wastewater discharge permit of any industrial user that discharges wastewater violating any of the above criteria or that has processes that generate wastewater that could violate any of the above criteria prior to pretreatment as shall be reasonably necessary to achieve the purpose and policy of this article. (e) National Pretreatment Standards. Certain industrial users are now or hereafter shall become subject to National Pretreatment Standards promulgated by the Environmental Protection Agency specifying quantities or concentrations of pollutants or pollutant properties which may be discharged into the POTW. All industrial users subject to a National Pretreatment Standard shall comply with all requirements of such standard, and shall also comply with any additional or more stringent limitations contained in this article. Compliance with National Pretreatment Standards for existing sources subject to such standards or for existing sources which hereafter become subject to such standards shall be within three (3) years following promulgation of the standards unless a shorter compliance time is specified in the standard. Compliance with National Pretreatment Standards for new sources shall be required upon promulgation of the standard. New sources shall install and have in operating condition, and shall "start-up" all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge. Within the shortest feasible time (not to exceed ninety (90) days), new sources must meet all applicable pretreatment standards. Except where expressly authorized by an applicable National Pretreatment Standard, no industrial user shall increase the use of process water or in any way attempt to dilute a discharge as a partial or complete substitution for adequate treatment to achieve compliance with such standard. ..... (f) Limitation on Radioactive Waste. No person shall discharge or permit to be discharged any radioactive waste into a community sewer except: ..... (1) When the person is authorized to use radioactive materials by the Tennessee Department of Health and Environment or the Nuclear Regulatory Commission; ..... (2) When the waste is discharged in strict conformity with applicable laws and regulations of the aforementioned agencies, or any other agency having jurisdiction; and ..... (3) When a copy of permits received from said regulatory agencies have been filed with the director. ..... (g) Septic Tank Pumping, Hauling, and Discharge. No person owning vacuum or "cess pool" pump trucks or other liquid waste transport trucks shall discharge directly or indirectly such sewage into the POTW, unless such person shall first have applied for and received a truck discharge operation permit from the director for each vehicle used in this manner. All applicants for a truck discharge operation permit shall complete such forms as required by the director, pay appropriate fees, and agree in writing to abide by the provisions of this chapter and any special conditions or regulations established by the director. ..... (1) The owners of such vehicles shall affix and display the permit number in four (4) inch block figures on the side of each vehicle used for such purposes. ..... (2) Such permit shall be valid for a period of one (1) year from date of issuance; provided that such permit shall be subject to suspension or revocation by the director for violation of any provisions of this code, regulations as established by the director, or any other applicable law or regulations. A revocation or suspension of such a permit shall be for a period of time not to exceed five (5) years. Such revocation or suspension shall bind the permittee, any member of the immediate family of the permittee, or any person who has purchased the business or a substantial amount of the assets of the permittee who paid less than fair market value for such business or assets. Users found operating in violation of a permit issued under this subsection and whose permit is therefore revoked by the director, shall be notified by certified mailing or notice shall personally be delivered to the user. ..... (3) Truck discharge operation permits are not automatically renewed. Application for renewal must be made to the director. ..... (4) Such permits shall be limited to the discharge of domestic sewage waste containing no industrial waste. All other hauled wastes shall be governed by paragraph (h) of this section. Any user transporting, collecting, or discharging non-domestic industrial process wastewaters, or a mixture of such wastewaters with domestic wastewater shall obtain a holding tank discharge permit in accordance with paragraph (h). ..... (5) The director shall designate the locations and times where such trucks may be discharged, and may refuse to accept any truckload of waste in his absolute discretion where it appears that the waste could interfere with the effective operation of the treatment works or any sewer line or appurtenance thereto, or where it appears that a truckload of waste contains industrial process waste or a mixture of domestic sewage and industrial process waste. ..... (6) The director shall have authority to investigate the source of any hauled waste and to require testing of the waste at the expense of the discharger prior to discharge. ..... (h) Other Holding Tank Waste. No user shall discharge any other holding tank wastes including hauled industrial waste into the POTW unless he shall have applied for and have been issued a 'holding tank discharge permit' by the director. Unless otherwise allowed under the terms and conditions of the permit, a separate permit must be secured for each separate discharge. All applicants for a holding tank discharge permit shall complete such forms as required by the director, pay appropriate fees, and agree in writing to abide by the provisions of this chapter and any special conditions or regulations established by the director. All such dischargers and transporters must show that they have complied with federal manifests and other regulations under RCRA. The permit shall state the specific location of the discharge, the time of day the discharge is to occur, the volume of the discharge, the source and character of such waste, and shall limit the wastewater constituents and characteristics of the discharge. Such user shall pay any applicable charges or fees therefore, and shall comply with the conditions of the permit issued by the director; provided, however, the director may waive in his discretion the completion of an application and for the payment of fees for the requirement for discharge of domestic waste from a recreational vehicle holding tank. ..... (i) Limitations on Wastewater Strength (Local Limits). A table containing numeric pollutant concentrations (referred to as local limits) shall be developed by the director for approval and adoption by the Wastewater Regulations and Appeals Board to regulate the discharge of pollutants to the sewer system. This table may be revised from time to time as necessary to implement the plant protection criteria set forth in Section 31-51(j). No user shall discharge wastewater with pollutant concentrations in excess of the concentration set forth in said table unless: ..... (1) An exception has been granted the user under the provisions of Section 31-52; or ..... (2) The wastewater discharge permit of the user provides as a special permit condition a higher interim concentration level in conjunction with a requirement that the user construct a pretreatment facility or institute changes in operation and maintenance procedures to reduce the concentration of pollutants to levels not exceeding the standards set forth in the table within a fixed period of time. ..... Maximum Concentration mg/l (24 Hour Flow Proportional Pollutant | Maximum Instantaneous Concentration mg/l Composite Sample) | (Grab Sample) Cadmium (Cd) | 1.0 | 2.0 Chromium (Cr) | 5.0 | 10.0 Copper (Cu) | 5.0 | 10.0 Cyanide (CN) | 2.0 | 4.0 Lead (Pb) | 1.5 | 3.0 Mercury (Hg) | 0.1 | 0.2 Nickel (Ni) | 5.0 | 10.0 Silver (Ag - free ionic) | 1.0 | 2.0 Zinc (Zn) | 5.0 | 10.0 pH | 5—10.5 Standard units NOTE: All measurements for the above-listed pollutants are in the total form except for silver. (j) Criteria to Protect the Treatment Plant Influent. A table containing numeric pollutant concentrations (referred to as plant protection criteria) shall be developed by the director for approval and adoption by the Wastewater Regulations and Appeals Board to protect the treatment plant from pass-through of pollutants, to protect the quality of the sludge produced by the treatment plant, and to prevent inhibition of treatment plant processes. This table may be revised from time to time as necessary to accomplish these objectives. The director shall monitor the treatment works influent for each pollutant in said table. Industrial users shall be subject to the reporting and monitoring requirements set forth in Section 31-53 and Section 31-54 as to these pollutants. In the event that the influent at the treatment works reaches or exceeds the levels established by said table, the director shall initiate technical studies to determine the cause of the influent violation, and shall recommend such remedial measures as are necessary, including but not limited to recommending the establishment of new or revised pretreatment levels for these pollutants. The director shall also recommend changes to any of these criteria in the event the POTW effluent standards are changed, there are changes in any applicable law or regulation affecting same, or when changes are needed for more effective operation of the POTW. ..... Monthly Average Pollutant | Maximum Concentration (mg/l) Copper (Cu) | 0.40 Chromium (Cr) | 0.47 Nickel (Ni) | 0.35 Cadmium (Cd) | 0.01 Lead (Pb) | 0.10 Mercury (Hg) | 0.015 Silver (Ag-free ionic) | 0.036 Zinc (Zn) | 0.80 Cyanide (CN) | 0.05 Toluene | 0.115 Benzene | 0.015 1,1,1-Trichloroethane | 0.167 Ethylbenzene | 0.031 Carbon tetrachloride | 0.015 Chloroform | 0.193 Tetrachloroethylene | 0.278 Trichloroethylene | 0.077 1,2 Transdichloroethylene | 0.150 Methylene chloride | 0.111 Phenols | 0.555 Naphthalene | 0.011 Bis (2-ethyl hexyl) phthalate | 0.064 Butyl benzyl phthalate Di-n-butyl phthalate Diethyl phthalate Chromium - Hexavalent (Cr+6) | 0.02 Iron (Fe) | 6.7 Manganese (Mn) | 0.33 Total Kjeldahl Nitrogen (TKN) | 30.0 Oil & Grease | * MBAS | * Total Dissolved Solids | 2,500 BOD | 207,420 lb/day Suspended Solids | 213,137 lb/day Ammonia Nitrogen | 14,000 lb/day Ph | 6—9 standard units Lower Explosion Limit | 10% NOTE: All measurements for these pollutants are for the total form except as noted. *No limit established for plant protection, however monitoring will be required to provide numerical correlation with NPDES conditions. (k) Pretreatment Requirements. Industrial users of the POTW shall design, construct, operate, and maintain wastewater pretreatment facilities whenever necessary to reduce or modify the user's wastewater composition to achieve compliance with the limitations in wastewater strength set forth in paragraph (i) of this section, to meet applicable National Pretreatment Standards, to prevent slug discharge or to meet any other wastewater condition or limitation contained in the industrial user's wastewater discharge permit. ..... (l) Plans and Specifications. Plans and specifications for such wastewater pretreatment facilities shall be prepared, signed, dated, and sealed by a professional engineer licensed in the State where the work is to be permitted, and shall be submitted to the director for review in accordance with accepted engineering practices. The director shall review said plans within forty-five (45) days and shall recommend to the industrial user any appropriate changes. Prior to beginning construction of said pretreatment facility, the user shall submit a set of construction plans and specifications to be maintained by the director. Prior to beginning construction the industrial user shall also secure such building, plumbing, or other permits that may be required by other parts of this code. The industrial user shall construct said pretreatment facility within the time provided in the industrial user's wastewater discharge permit. Following completion of construction the industrial user shall provide the director with "as built" drawings to be maintained by the director. ..... (m) Prevention of Accidental Discharges. All users shall provide such facilities and institute such procedures as are reasonably necessary to prevent or minimize the potential for accidental discharge into the POTW of waste regulated by this article from liquid or raw material storage areas, from truck and rail car loading and unloading areas, from inplant transfer or processing and materials handling areas, and from diked areas or holding ponds of any waste regulated by this article. The wastewater discharge permit of any industrial user who has a history of significant leaks, spills or other accidental discharge of waste regulated by this article shall be subject on a case-by-case basis to a special permit condition or requirement for the construction of facilities or establishment of procedures which will prevent or minimize the potential for such accidental discharge. Plans,, specifications, and operating procedures for such special permit conditions shall be developed by the user and submitted to the director for review under the provisions of paragraph (k) and (l) of this section. ..... (n) Reserved. ..... (o) Slug Discharge Control Program. ..... (1) Each industrial user shall provide protection from slug loadings and slug discharges, as defined in Section 31-50(b)(46) of this Ordinance. The director will evaluate each Significant Industrial User (SIU) for the need to prepare a plan to control slug discharges within twelve (12) months of commencing discharge, or for existing Significant Industrial Users, at least once by October 14, 2006. No user who commences discharge to the sewerage system after July 1, 1990 shall be permitted to introduce pollutants into the system until the need for slug discharge control plans or procedures has been evaluated by the director. ..... (2) Certain users will be required to prepare Slug Discharge Prevention and Contingency Plans (SDPC) showing facilities and operating procedures to provide this protection. These plans shall be submitted to the director for review and approval. All existing users required to have SDPC Plans shall submit such a plan within three (3) months after notification from the director and complete implementation within six (6) months. Review and approval of such plans and operating procedures shall not relieve the user from the responsibility to modify the user's facility as necessary to meet the requirements of this article. ..... An SDPC Plan shall address, as a minimum, the following: (A) Description of discharge practices, including non-routine batch discharges; ..... (B) Description of stored chemicals; ..... (C) Procedures for immediately notifying the director of any accidental or slug discharge, as required by subparagraph (o)(3) of this section.; and ..... (D) If necessary, procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. ..... (3) In the case of a slug discharge, it is the responsibility of the user to immediately by telephone or in person notify the POTW of the incident. The notification shall include location of discharge, type of waste, concentration and volume, and corrective action. ..... Within five (5) days following a slug discharge, the user shall submit a detailed written report describing the cause of the discharge and the measures being taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the sewerage system, fish kills, or any other damage to person or property, nor shall notification relieve the user of any fines, civil penalties, or other liability which may be imposed by the article or other applicable law. (4) A notice shall be permanently posted on the user's premises advising employees who to call in the event of a slug discharge. The user shall ensure that all employees who may cause, or allow such slug discharge to occur, are advised of the emergency notification procedure. ..... (5) Each Significant Industrial User shall immediately notify the director of any changes at its facility affecting the potential for a slug discharge. ..... (p) Centralized Waste Treatment Facilities. The director shall establish effluent limits for centralized waste treatment facilities to ensure that the level of pollution discharged from the CWT through the POTW to the environment will not exceed the level that would be allowed if the CWT discharged directly to surface waters under Section 301(b)(2) of the Act (33 U.S.C. § 1311). Additionally, centralized waste treatment facilities shall maintain records and submit reports as directed by the director regarding the SIC codes of their customers, and the frequency, characteristics, and volume of wastes from the various categories. ..... (q) Dilution. No user shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with a discharge limitation unless expressly authorized by an applicable pretreatment standard or requirement. The director may impose mass limitations on users which are using dilution to meet applicable pretreatment standards or requirements or in other cases when the imposition of mass limits is appropriate. ..... (r) Net/Gross Calculation. Categorical pretreatment standards may be adjusted to reflect the presence of pollutants in the industrial user's intake water in accordance with this section. Any industrial user wishing to obtain credit for intake pollutants must make application to the City. Upon request of the industrial user, the applicable standard will be calculated on a "net" basis (i.e., adjusted to reflect credit for pollutants in the intake water) if the following criteria are met: ..... (1) Either: ..... (A) The applicable categorical pretreatment standards contained in 40 CFR Subchapter N specifically provide that they will be applied on a new basis; or ..... (B) The industrial user demonstrates that the control system it proposes or uses to meet applicable categorical pretreatment standards would, if properly installed and operated, meet the standards in the absence of pollutants in the intake waters. ..... (2) Credit for generic pollutants such as biochemical oxygen demand (BOD), total suspended solids (TSS), and oil and grease will not be granted unless the industrial user demonstrates that the constituents measured in the user's effluent are substantially similar to the constituents in the intake water or unless appropriate additional limits are placed on the process water pollutants either at the outfall or elsewhere. ..... (3) Credit will be granted only to the extent necessary to meet the applicable categorical pretreatment standards, up to a maximum value equal to the influent value. Additional monitoring may be necessary to determine eligibility for credits and compliance with standards adjusted under this section. ..... (4) Credit will be granted only if the user demonstrates that the intake water is drawn from the same body of water as that into which the POTW discharges. The City may waive this requirement if he/she finds that no environmental degradation will result. ..... (s) Combined waste stream formula. Where process wastewater subject to a categorical pretreatment standard is mixed with wastewaters other than those generated by the regulated process, alternative discharge limits shall be derived by the City, or by the industrial user with the consent of the City. The alternative limits shall be applied to the mixed effluent. When deriving alternative categorical limits, the City or industrial user shall calculate both an alternative daily maximum value using the maximum value(s) specified in the appropriate categorical pretreatment standard(s) and an alternative consecutive sampling day average value using the monthly average value(s) specified in the appropriate categorical pretreatment standard(s). The industrial user shall comply with the alternative daily maximum and monthly average limits fixed by the City until the City modifies the limits or approves an industrial user's modification request. Modification is authorized whenever there is a material or significant change in the values used in the calculation to fix alternative limits for the regulated pollutant. An industrial user must immediately report any such material or significant change to the director. ..... (1) Alternative limit calculation. Alternative limits shall be calculated using the formula and instructions in 40 CFR 403.6(e). ..... (2) Alternative limits below detection limit. An alternative pretreatment limit may not be used if the alternative limit is below the analytical detection limit of any regulated pollutants. ..... (3) Choice of monitoring location. Where a regulated process waste stream is combined prior to treatment with wastewaters other than those generated by the regulated process, the industrial user may monitor either the segregated process waste stream or the combined waste stream for the purpose of determining compliance with the applicable pretreatment standards. If the industrial user chooses to monitor the segregated process waste stream, it shall apply the applicable categorical pretreatment standard. If the user chooses to monitor the combined waste stream, it shall apply the alternative discharge limit calculated using the combined waste stream formula as described in this section. The industrial user may change monitoring locations only after receiving prior approval from the City. The industrial user may not use dilution as a substitute for adequate treatment to achieve compliance with applicable standards. .....
(Ord. No. 9409, § 2, 6-5-90; Ord. No. 12428, § 2, 8-31-10; Ord. No. 12962, §§ 2, 4, 6-16-15; Ord. No. 13172, §§ 4, 5, 4-18-17)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
