§ 31-51.02 — FOG Program violations and penalties
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-51.02
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/5c8eaf72-5472-49ea-bb21-06e21d7234e2
Sec. 31-51.02. - FOG Program violations and penalties.
a. Definitions. ..... (1) Administrative Penalties. An administrative penalty is a monetary penalty assessed by the Director or his designee for violations of pretreatment standards and requirements. Administrative penalties are to be used as an escalated enforcement action and are punitive in nature and are not related to a specific cost born by the Director or his designee. Instead, the amount of the penalty should recapture any economic benefit gained by noncompliance and/or deter future violations. An Administrative Order is to be used to assess an administrative penalty. ..... (2) Administrative Orders (AO). Administrative Orders are to be issued by the Director or the Director's designee. Administrative Orders are enforcement documents that direct users to undertake and/or to cease specified activities. Administrative Orders are to be used as the first formal response to significant noncompliance, and may incorporate compliance schedules, administrative penalties, assessments for costs incurred during investigation and/or enforcement, attorney's fees, assessments for damages and termination of service. The Department has adopted four (4) general types of AOs: Compliance Orders, Show Cause Orders, Cease and Desist Orders, and Agreed Orders: ..... (a) Compliance Order. A Compliance Order directs the User to achieve or restore compliance by a specified date and is the primary means of assessing penalties and costs. The Compliance Order will document the noncompliance and state required actions to be accomplished by specific dates and is issued by the Director or his designee. ..... (b) Show Cause Order. An Order to Show Cause directs the User to appear before the Director or his designee, explain its noncompliance, and show cause why more severe enforcement action should not be pursued. The Order to Show Cause shall include the nature of the violation with sufficient specificity as to the character of the violation, and the date(s) on which such violation(s) occurred to enable the user to prepare a defense. Such Order to Show Cause shall be mailed to the user by certified mail, return receipt requested, or shall be personally delivered to the user at least twenty (20) days prior to the proposed action except in the event of an emergency. At the show cause hearing, the user may present any defense he may have to such charges, either in person or through submission of written or documentary proof. The hearing is open to the public and may be formal (i.e. conducted according to the rules of evidence, with verbatim transcripts and cross examination of witnesses) or informal. The results of all hearings, along with any data and testimony (recorded by tape machine or stenographer) submitted as evidence, are available to the public and may serve as evidentiary support for future enforcement actions. ..... (c) Cease and Desist Order. A Cease and Desist Order directs the noncompliant User to cease illegal or unauthorized discharge immediately or to terminate discharge altogether. To preserve the usefulness of this order in emergency situations, penalties should not be assessed in this document. A Cease and Desist Order will be used in situations where the discharge is causing interference, pass through, environmental harm, or otherwise creating an emergency situation. The order may be issued immediately upon discovery of an emergency situation or following a hearing. In an emergency, the order to cease and desist may be given by telephone with a subsequent written order to be served by the Director or his designee before the close of business on the next working day. If the User fails to comply with the order, the Director or his designee may take independent action to halt the discharge. ..... (d) Agreed Order. The Agreed Order is an agreement between the Department and the User. The Agreed Order normally contains three elements: (1) compliance schedules with specific milestone dates; (2) stipulated penalties, damages, and/or remedial actions; and (3) signature by the Director and the User representative. An Agreed Order is appropriate when the User assumes the responsibility for its noncompliance and is willing (in good faith) to correct the causes. ..... (3) Noncompliance Notification (NCN). The Noncompliance Notification (NCN) is a notification to the user that a practice, an action, or wastewater discharge is noncompliant with Department regulations or policies. A NCN informs the user that an action is required of the user within a specified time period designated by the Director, or their designee, or the noncompliance will require the Director to escalate enforcement action against the user. ..... (4) Notice of Violation (NOV). The Notice of Violation (NOV) is an official communication from the Director to the noncompliant user that informs the user that the pretreatment violation has occurred. The NOV is issued for relatively minor or infrequent violations of pretreatment standards and requirements and should be issued within five (5) working days of the identification of a violation. A NOV does not contain assessment of penalties or cost recovery. The NOV provides the user with an opportunity to correct the noncompliance on its own initiative rather than according to a schedule of actions determined by the Director. The NOV documents the initial attempts of the Department to resolve the noncompliance. Authenticated copies of NOV's may serve as evidence in judicial proceedings. ..... (5) Schedule of Compliance. A Schedule of Compliance is a detailed list of steps to be taken by a noncompliant user whereby compliance with all pretreatment regulations will be achieved. This schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the User to meet the applicable Pretreatment Standards (e.g. hiring an engineer, completing preliminary plans, executing contracts for components, commencing construction, etc.). ..... (6) Significant Noncompliance. Violations that meet one (1) or more of the following criteria: ..... (a) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of all of measurements taken during a six (6) month period exceed (by any magnitude) the daily maximum limit or the average limit for the same pollutant parameter; ..... (b) Technical Review Criteria (TRC) violations, defined here as those in which thirty three (33) percent or more of all of the measurements for each pollutant parameter taken during a six (6) month period equal or exceed the product of the daily average maximum limit, or the average limit multiplied by the applicable TRC (TRC = 1.4 for Biochemical Oxygen Demand 5 (BOD5), Total Suspended Solids (TSS), and Fats, Oil, and Grease (FOG), and 1.2 for all other pollutants except pH). The following compatible pollutants are exempt from TRC consideration if they exceed the surcharge level but do not exceed upper ceiling: BOD, TSS, and/or FOG; ..... (c) Any other violations of a pretreatment effluent limit (daily maximum or long term average) that the Control Authority determines has caused, alone or in combination with other discharges, interference or pass through (including endangered the health of Publicly Owned Treatment Works (POTW) personnel or the general public); ..... (d) Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such a discharge; ..... (e) Failure to meet within ninety (90) days after the schedule date compliance schedule milestones contained in a local control mechanism or enforcement order for starting construction, completing construction, and attaining final compliance; ..... (f) Failure to provide, within thirty (30) days after the due date, required reports, such as baseline monitoring reports, ninety (90) day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; ..... (g) Failure to accurately report noncompliance; and ..... (h) Any other violation or group of violations that the Control Authority determines will adversely affect the operation or implementation of the local pretreatment program. ..... b. Penalty Assessment. The City of Chattanooga has categorized the various types of violations, and assigned a penalty range to each category. Penalty categories are determined by using the Enforcement Response Guide. All penalty assessments will be approved and signed by the Director or the Director's designee. Penalty amounts determined are considered to be an economic deterrent to the noncompliance being addressed. Penalty ranges have been designed to recover any economic benefit gained by the violation through noncompliance. ..... CATEGORY 0 | = | NO PENALTY CATEGORY 1 | = | $200.00 TO $500.00 CATEGORY 2 | = | $500.00 TO $1,000.00 CATEGORY 3 | = | $1,000.00 TO $10,000.00 CATEGORY 4 | = | DIRECT LEGAL ACTION* Any penalties and/or costs at the maximum penalty allowable by. Assessments for damages or destruction of the facilities of the POTW, and any penalties, costs, and attorney's fees incurred by the pretreatment agency as the result of the illegal activity, as well as the expenses involved in enforcement, are not part of this penalty assessment procedure. City of Chattanooga's Food Service Establishment Enforcement Response Guide Incident | Category Level | Action Taken 1. Grease Interceptor structural failure (baffle wall collapsed, walls deteriorated, tank leaking, infiltration/inflow in tank). A. Initial Notification. | 0 | NCN detailing violation and requiring correction within 30 days. B. Second Notification — Failure to comply with NCN. | 2 | NOV requiring compliance within 30 additional days. Penalties may be assessed. C. Third Notification — Failure to comply with NOV. | 3 | Significant Noncompliance. May be subject to daily penalties. 2. Failure to install Grease Control Equipment A. Initial Notification — Notification in writing by POTW of no treatment system. | 0 | NCN detailing violation and requiring correction within 30 days. B. Second Notification — Failure to comply with NCN. | 2 | NOV requiring compliance within 30 additional days. Penalties may be assessed. C. Third Notification — Failure to comply with NOV. | 3 | Significant Noncompliance. May be subject to daily penalties. 3. Failure of new facility, or an existing facility that upgrades their facility, to notify City, or submit Grease Control Equipment Inquiry Information. | 0 | Issue NCN and require GCE Inquiry Information. 4. Failure to install influent and/or effluent "T" on interceptor within 30 days after notification. | 1 | Significant Noncompliance. May be subject to penalties. 5. Grease Control Equipment not maintained (pumped or cleaned) as required. A. 1 incident within 24 month period | 0 | NCN detailing noncompliance and requiring correction within 30 days B. 2 incidents within 24 month period | 1 | NOV requiring compliance within 30 additional days. Penalties may be assessed. C. 3 incidents within 24 month period | 2 | 2 nd NOV requiring compliance within 30 additional days. Penalties may be assessed. D. 4 incidents within 24 month period | 3 | Significant Noncompliance. Penalties may be assessed. 6. Failure to respond to any notification letter within 30 days. | Escalation of Enforcement 7. No record of grease control equipment maintenance or cleaning at facility. A. 1 incident within 24 month period | 0 | NCN detailing noncompliance and requiring correction within 30 days. B. 2 incidents within 24 month period | 1 | NOV requiring compliance within 30 additional days. Penalties may be assessed. C. 3 incidents within 24 month period | 2 | 2 nd NOV requiring compliance within 30 additional days. Penalties may be assessed. D. 4 incidents within 24 month period | 3 | Significant Noncompliance; Penalties may be assessed. 8. Failure to allow access for City personnel to adequately assess grease control equipment. | Significant Noncompliance; Penalties may be assessed. 9. Safety hazard at grease control equipment area (i.e. missing manhole cover, manhole cover damaged or not made of material of suitable strength). | Requires immediate correction. 10. Facility using additives or chemicals that emulsify or otherwise cause FOG to be discharged to City of Chattanooga sewer system. | Significant Noncompliance. Abbreviations: AO: | Administrative Order FOG: | Fats, Oils and Grease FSE: | Food Service Establishment GCE: | Grease Control Equipment NCN: | Noncompliance Notification NOV: | Notice of Violation POTW: | Publicly Owned Treatment Works c. Any person aggrieved by an order or determination of the Director or his designee may appeal to the Wastewater Regulations and Appeals Board pursuant to the requirements set forth in Sec. 31-295. A written notice of appeal must be filed with the Wastewater Regulations and Appeals Board within fifteen (15) days of the Director's order or determination. .....
(Ord. No. 12962, § 2, 6-16-15)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.