§ 31-53 — Wastewater discharge permit; discharge reports; and administration
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-53
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/e9969d0c-fb82-456d-baa6-2012e3e42252
Sec. 31-53. - Wastewater discharge permit; discharge reports; and administration.
(a) Applicability. The provisions of this section are applicable to all industrial users of the POTW. The City of Chattanooga has an "Approved POTW Pretreatment Program" as that term is defined in 40 CFR Section 403.3(d), and any permits issued hereunder to industrial users who are subject to or who become subject to a "National Categorical Pretreatment Standard" as that term is defined in 40 CFR 403.3(j) shall be conditioned upon the industrial user also complying with all applicable substantive and procedural requirements promulgated by the Environmental Protection Agency or the State of Tennessee in regard to such "Categorical Standards" unless an exception for the city's program or for specific industrial categories has been authorized. ..... (b) Application and Permit Requirements for Industrial Users. All significant industrial users of the POTW prior to discharging non-domestic waste into the POTW shall apply for and obtain a wastewater discharge permit in the manner hereinafter set forth. Prior to discharge of non-domestic wastewater into the POTW, an industrial user shall request the director to determine if the proposed discharge is significant as defined in Section 31-50(b). If the discharge is determined not to be significant, then the director may still establish appropriate discharge conditions for the user. Any non-categorical industrial user designated as significant may petition the director to be deleted from the list of significant industrial users on the grounds that it has no potential for adversely affecting the POTW's operation or violating any pretreatment standard or requirement. All significant industrial users shall obtain an industrial wastewater discharge permit and shall complete such forms as required by the director, pay appropriate fees, and agree to abide by the provisions of this article and any specific conditions or regulations established by the director. All original applications shall be accompanied by a report containing the information specified in subparagraph (c) hereof. All original applications shall also include a site plan, floor plan, mechanical and plumbing plans with sufficient detail to show all sewers and appurtenances in the user's premises by size, location, and elevation; and the industrial user shall submit to the director revised plans whenever alterations or additions to the user's premises affect said plans. ..... (c) Report Requirement. The report required by paragraph (b) above or other provisions of this article for all significant industrial users shall contain, in units and terms appropriate for evaluation, the information listed in subparagraphs (1) through (5) below. Industrial users subject to national pretreatment standards shall submit to the director a report which contains the information listed in subparagraphs (1) through (6) below within one hundred and eighty (180) days after the promulgation by the Environmental Protection Agency of a National Pretreatment Standard under Section 307(b) or (c) (33 U.S.C. 1317 (b) or (c)) of the Act. This report is called the "Baseline Monitoring Report" or BMR. Industrial users who are unable to achieve a discharge limit set forth in section 31-51 hereof without improved operation and maintenance procedures or pretreatment shall submit a report which contains the information listed in subparagraph (1) through (7) of this paragraph. ..... As specified hereinabove, the report shall contain all or applicable portions of the following: (1) Identifying Information. The name and address of the industrial user; and the name(s) of the owner and operator, including contract information; ..... (2) Permits. A list of any environmental control permits held by the user; ..... (3) Description of operations. ..... (A) A brief description of the nature, average rate of production and standard industrial classification of the operation(s) carried out by such industrial user. The description should include a schematic process diagram which indicates points of discharge to the POTW; ..... (B) The types of wastes generated and a list of chemicals used and materials stored at the facility which could be accidentally discharged to the POTW; ..... (C) Number of employees, hours of operation, and actual or proposed hours of discharge to the POTW; ..... (D) Type and amount of raw materials processed (average and maximum per day), and type and amount of products produced (rate of production); ..... (E) Site plans, floor plans, and plumbing plans to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. ..... (4) Proposed location for monitoring for all wastes covered by the permit; ..... (5) Flow measurement. The measured average and maximum flow of the discharge from such industrial user to the POTW, in gallons per day; ..... (6) Measurement of pollutants.The nature and concentration of pollutants in the discharge from each regulated process from such industrial user and identification of any applicable pretreatment standards and requirements. The concentration shall be reported as a maximum or average level as provided for in the applicable pretreatment standard and as determined by standard methods approved by the director. If an alternate or equivalent concentration limit has been calculated in accordance with any pretreatment standard, this adjusted concentration limit shall also be submitted to the director for approval. Wastewater sample(s) shall be representative of daily operations. Sampling and analysis shall comply with the requirements of Section 31-53(h)(7).Whenever pH information is required in the initial report or in regular periodic self-monitoring reports, it shall be collected in the form of a chart from a continuous pH recorder;. In cases where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required to determine compliance with the standard. ..... (7) Proposed pretreatment systems or equipment and/or operation and maintenance procedures necessary to meet applicable pretreatment standards and requirements. ..... (8) Any request for a monitoring waiver for a pollutant neither present nor expected to be present in the discharge. ..... (9) Any other information as may be deemed necessary by the director to evaluate the permit application. ..... (10) Certification. A statement, reviewed by an authorized representative of the industrial user (as defined in paragraph (h)(11) below) and certified by a professional engineer indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance procedures or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; and ..... (11) Compliance schedule. If additional pretreatment or operation and maintenance procedure will be required to meet the pretreatment standards, then the report shall contain the shortest schedule by which the industrial user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. If a pretreatment standard has been modified or adjusted, the information in paragraphs (h)(6) and (h)(7) shall apply to the modified or adjusted limits. ..... All permit applications must be signed and certified in accordance with Section 31-53(h)(11). For purposes of this paragraph when the context so indicates the phrase "pretreatment standard" shall include either a national pretreatment standard or a pretreatment standard imposed as a result of the industrial user's discharging any incompatible pollutant regulated by Section 31-51 hereof. For purposes of this paragraph the term "pollutant" shall include any pollutant identified in a national pretreatment standard or any incompatible pollutant identified in Section 31-51 hereof. (d) Incomplete Applications. The director will act only on applications that are accompanied by a report which contains all the information required in paragraph (c) above. Industrial users who have filed incomplete applications will be notified by the director that the application is deficient and the nature of such deficiency and will be given thirty (30) days to correct the deficiency. If the deficiency is not corrected within thirty (30) days or with such extended period as allowed by the director, the director shall deny the application and notify the applicant in writing of such action. ..... (e) Evaluation of Application Permit Conditions. Upon receipt of complete applications, the director shall review and evaluate the applications and shall propose such special permit conditions as he deems advisable. All wastewater discharge permits shall be expressly subject to all the provisions of this article and all other applicable ordinances, laws, and regulations. All wastewater discharge permits shall contain the following: ..... (1) Statement of duration (no more than five (5) years) and effective date; ..... (2) Statement of non-transferability without, at a minimum, prior notification of the director and provision of a copy of the ordinance to the new owner or operator; ..... (3) Effluent limits, including BMPs (if appropriate), based on applicable general pretreatment standards, categorical pretreatment standards, local limits, and state and local law; ..... (4) Self-monitoring, sampling, reporting, notification, and recordkeeping requirements, including identification of the pollutants (or BMPs) to be monitored, sampling frequency, and sample type, based on applicable general pretreatment standards, categorical pretreatment standards, local limits, and state and local law; ..... (5) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend time for compliance beyond that required by applicable federal, state, or local law; and ..... (6) Requirements to control slug discharges, if determined by the director to be necessary. ..... The director may also propose that the wastewater discharge permit be subject to one (1) or more special conditions in regard to any of the following: (7) Pretreatment requirements; ..... (8) Limits on rate and time of discharge of requirements for flow regulations and equalization; ..... (9) Requirements for installation of inspection and sampling facilities; including flow measurement devices; ..... (10) Development and implementation of waste minimization or pollution prevention plans to reduce the amount of pollutants discharged to the POTW; ..... (11) Other conditions as deemed appropriate by the director to insure compliance with this article or other applicable ordinance, law or regulation; ..... (12) Requirements for the installation of facilities to prevent and control accidental discharge or "spills" at the user's premises; and ..... (13) The unit charge or schedule of charges and fees for the wastewater to be discharged to a community sewer. ..... (f) Applicant to be Notified of Proposed Permit Conditions; Right to Object. ..... (1) Upon completion of his evaluation, the director shall notify the applicant of any special permit conditions which he proposed be included in the wastewater discharge permit; ..... (2) The applicant shall have forty-five (45) days from and after the date of the director's recommendations for special permit conditions to review same and file written objections with the director in regard to any special permit conditions recommended by the director. ..... The director may, but shall not be required, to schedule a meeting with applicant's authorized representative within fifteen (15) days following receipt of the applicant's objections, and attempt to resolve disputed issues concerning special permit conditions; (3) If applicant files no objection to special permit conditions proposed by the director, or a subsequent agreement is reached concerning same, the director shall issue a wastewater discharge permit to applicant with such special conditions incorporated therein. Otherwise, the director shall submit the disputed matters to the board for resolution as hereinafter provided. ..... (g) Board to Establish Permit Conditions; Hearing. ..... (1) In the event the director cannot issue a wastewater discharge permit pursuant to paragraph (f) above, the director shall submit to the board his proposed permit conditions and the applicant's written objections thereto at the next regularly scheduled meeting of the board or a specially called meeting; ..... (2) The board shall schedule a hearing within ninety (90) days following the meeting referred to hereinabove unless such time be extended for just cause shown to resolve any disputed matters relevant to such permit; ..... (3) The director shall notify the applicant of the date, time, place, and purpose of the hearing scheduled by the board. The applicant and the director shall have the right to participate in such hearing and present any relevant evidence to the board concerning proposed special permit conditions or other matters being considered by the board; ..... (4) Following such hearing or such additional hearings as shall be deemed necessary and advisable by the board, the board shall establish such special permit conditions as it deems advisable to insure the applicant's compliance with this article or other applicable law or regulation and direct the director to issue a wastewater discharge permit to the applicant accordingly. ..... (h) Compliance Schedule and Reporting Requirements. The following conditions shall apply to the schedules and reports required by paragraphs (c), (e), or (g) of this section: ..... (1) Schedule components. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment requirements for the industrial user to meet the applicable pretreatment standards (e.g. hiring an engineer, completing the engineering report, completing final plans, executing contracts for major components, commencing construction, completing construction, etc.) ..... (2) Schedule intervals. No increment referred to in subparagraph (h)(1) shall exceed nine (9) months. ..... (3) Compliance schedule progress reports. No later than fourteen (14) days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the director including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay, and steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the director. ..... (4) 90-Day compliance. Within ninety (90) days following the date for final compliance with applicable pretreatment standards or, in the case of a new source, following commencement of the introduction of wastewater into the POTW, any industrial user subject to pretreatment standards and requirements shall submit to the director a report containing the information described in Section 31-53(c)(4)-(6). For users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with Section 31-53(h)(11) of this ordinance. All sampling shall be performed in accordance with Section 31-53(h)(7). ..... (5) Compliance Monitoring Reports. ..... (A) All significant industrial users shall submit to the director during the months of June and December, unless required more frequently in the pretreatment standard or by the director, a report indicating the nature and concentration, of pollutants in the effluent which are limited by their permit. In addition, this report shall include a record of average and maximum daily flows. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user must submit documentation necessary to determine the compliance status of the user. At the discretion of the director, and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the director may agree to alter the months during which the above reports are to be submitted. ..... (B) In cases where the director or a pretreatment standard has imposed mass limitations, the report required by subparagraph (i) of this paragraph shall indicate the mass of pollutants regulated by pretreatment standards in the effluent of the industrial user. ..... (C) Reporting requirements for industrial users not subject to categorical pretreatment standards. In cases where the permit requires compliance with a BMP or pollution prevention alternative, the user must submit documentation as required by the city to determine the compliance status of the user. These reports must be based on sampling and analysis in the period covered by the report, and in accordance with the techniques described in 40 CFR Part 136. ..... (D) All monitoring and compliance reports must be certified and signed in accordance with the requirements of Section 31-53(h)(11). ..... (6) Accidental and Slug Discharge Reporting and Notification.The industrial user shall notify the POTW immediately by telephone in the event of an accidental discharge, slug loading, or slug discharge, as defined in Section 31-50(46) of this ordinance. The notification shall include the location of the discharge, type of waste, concentration and volume (if known), and corrective action taken by user. Each significant industrial user shall also immediately notify the director of any changes at the facility affecting the potential for a slug discharge. ..... (7) The reports required in this section shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production rates and mass limits where requested by the director, as applicable, of pollutants contained therein which are limited by the applicable pretreatment standards or industrial permit. For industrial users subject to equivalent mass or concentration limits established by the director as alternative standards, the report required by paragraph (h)(5) shall contain a reasonable measure of the user's long term production rate. For all other industrial users subject to categorical pretreatment standards expressed only in terms of allowable pollutant discharge per unit of production (or other measure of operation), the report required by paragraph (h)(5) shall include the user's actual average production rate for the reporting period. The frequency of monitoring shall be prescribed in the applicable treatment standard. All analyses shall be performed in accordance with procedures established by the Environmental Protection Agency under the provisions of Section 304(h) of the Act (33 U.S.C. 1314 (h)) and contained in 40 C.F.R. Part 136 and amendments thereto or with any other test procedures approved by the Environmental Protection Agency or the director. Sampling shall be performed in accordance with the techniques approved by the Environmental Protection Agency, or the director. All wastewater samples must be representative of the user's actual discharge. ..... (A) Except as indicated in Subparagraphs (B) and (C) below, the user must collect wastewater samples using twenty-four (24) hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the director. Where time-proportional composite sampling or grab sampling is authorized, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a twenty-four (24) hour period may be composited prior to analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in a laboratory or in a field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the director, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. ..... (B) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. ..... (C) For sampling required in support of baseline monitoring and ninety (90) day compliance reports required in Sections 31-53(c) and (h)(4) and 40 CFR 503.12(b) and (d), a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfides, and volatile organic compounds for facilities for which historical sampling data do not exist. For facilities with historical sampling data available, the director may authorize a lower minimum. For reports required by Section 31- 53(h)(5) and 40 CFR 403.12(e) and (h), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards. ..... (D) The director shall inspect and sample the effluent from each significant industrial user at least once every twelve (12) months. ..... (8) Notification of the discharge of hazardous wastes. ..... (A) The industrial user shall notify, as soon as practicable, the POTW, the EPA Regional Waste Management Division Director, and the State hazardous waste authorities of any discharge into the POTW of a substance which is a listed or characteristic waste under section 3001 of RCRA (42 USCA § 6921). Such notification must include a description of any such wastes discharged, specifying the volume and concentration of such wastes and the type of discharge (continuous, batch, or other), identifying the hazardous constituents contained in the listed wastes, and estimating the volume of hazardous wastes expected to be discharged during the following twelve (12) months. The notification must take place within one hundred eight (180) days after notification by the director. This requirement shall not apply to pollutants already reported under the self-monitoring requirements of Section 31-53. ..... (B) Dischargers are exempt from the requirements of this paragraph during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in any calendar month, or any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in any calendar month, or any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one (1) time notification. Subsequent months during which the industrial user discharges more than such quantities of hazardous waste do not require additional notification, except for the acute hazardous wastes. ..... (C) In the case of new regulations under Section 3001 of RCRA (42 USCA 56921) identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify the POTW of the discharge of such substance within ninety (90) days of the effective date of such regulations, except for the exemption in paragraph (B) of this subsection. ..... (D) In the case of any notification made under this paragraph, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of wastes generated to the degree it has determined to be economically practicable and that it has selected the method of treatment, storage, or disposal currently available which minimizes the present and future threat to human health and the environment. ..... (E) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this ordinance, a permit issued thereunder, or any applicable federal or state law. ..... (9) Notification of Changed Discharge. All industrial users shall promptly notify the POTW in advance of any substantial change in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous wastes for which the industrial user has submitted initial notification under paragraph (8) above. ..... (10) Provisions Governing Fraud and False Statements. The reports required to be submitted under this section shall be subject to the provisions of 18 U.S.C. § 1001 relating to fraud and false statements and the provisions of Sections 309(c)(4) and (6) of the Act (33 USCA § 1311), as amended, governing false statements, representation or certifications in reports required under the Act. ..... (11) Signatory requirements for permit applications, user reports, and initial monitoring waiver. The following certification statement must be signed and submitted by users submitting permit applications and monitoring and compliance reports. ..... I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. The applications and reports shall be signed as follows: (A) By a responsible corporate officer, if the industrial user submitting the reports required by this section is a corporation. For the purpose of this paragraph, a responsible corporate officer means: ..... (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation, or ..... (ii) The manager of one (1) or more manufacturing production, or operating facilities; provided that the manager is authorized to make management decisions which govern the operation of the regulated facility, including having the explicit duty of making major capital investment recommendations and to initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations, can ensure that the necessary systems are established or actions taken to gather complete and accurate information for control mechanism requirements, and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. ..... (B) By a general partner or proprietor if the industrial user submitting the reports required by this section is a partnership or sole proprietorship respectively. ..... (C) By a duly authorized representative of the individual designated in subparagraph (A) or (B) of this section if: ..... (i) The authorization is made in writing by the individual described in subparagraph (A) or (B); ..... (ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field director, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and ..... (iii) The written authorization is submitted to the director. ..... (D) If an authorization under subparagraph (C) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of subparagraph (C) of this section must be submitted to the director prior to or together with any reports to be signed by an authorized representative. ..... (12) Reporting of Violation. If sampling performed by an industrial user indicates a violation, the user shall notify the director within twenty-four (24) hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within thirty (30) days after becoming aware of the violation, except the industrial user is not required to resample if: ..... (A) The city performs sampling at the industrial user at a frequency of at least once per month, or ..... (B) The city performs sampling at the user between the time when the user performs its initial sampling and the time when the user receives the results of this sampling, or ..... (C) The city has performed the sampling and analysis in lieu of the industrial user. If the city has performed the sampling and analysis in lieu of the industrial user, the city must repeat the sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat sampling and analysis. ..... (13) If an industrial user subject to the reporting requirement in paragraph (e) of this section monitors any pollutant more frequently than required by the director, using approved procedures prescribed in this section, the results of this monitoring shall be included in the report. ..... (i) Bypass. ..... (1) Definitions. ..... (A) "Bypass" means the intentional division of waste streams from any portion of an industrial user's treatment facility. ..... (B) "Severe property damage" means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. ..... (2) Bypass not violating applicable Pretreatment Standards or Requirements. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of paragraphs (3) and (4) of this section. ..... (3) Notice. ..... (A) If an industrial user knows in advance of the need for a bypass, if shall submit prior notice to the director, if possible at least ten (10) days before the date of the bypass. ..... (B) An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the director within twenty-four (24) hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five (5) days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The director may waive the written report on a case-by-case basis if the oral report has been received within twenty-four (24) hours. ..... (4) Prohibition of Bypass. ..... (A) Except as allowed in subparagraph (2) above, bypass is prohibited, and the director may take enforcement action against an industrial user for a bypass, unless: ..... (i) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; ..... (ii) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance; and ..... (iii) The industrial user submitted notices as required under subparagraph (3) of this section. ..... (B) The director may approve an anticipated bypass, after considering its adverse effect, if the director determines that it will meet the three (3) conditions listed in subparagraph (4)(A) of this section. ..... (j) Maintenance of Records. Any industrial user subject to the reporting requirements established in this section shall maintain records of all information resulting from any monitoring activities required by this section. Such records shall include for all samples: ..... (1) The date, exact place, method, and time of sampling and the names of the persons taking the samples; ..... (2) The dates analyses were performed; ..... (3) Who performed the analyses; ..... (4) The analytical techniques/methods; and ..... (5) The results of such analyses. ..... (k) Retention Period. Any industrial user subject to the reporting requirement established in this section shall be required to retain for a minimum of three (3) years any records of monitoring activities and results (whether or not such monitoring activities are required by this section) and shall make such records available for inspection and copying by the director, Director of the Division of Water Pollution Control Tennessee Department of Health and Environment, or the Environmental Protection Agency. This period of retention shall be extended during the course of any unresolved litigation regarding the industrial user or when requested by the director, the Director, Tennessee, Department of Environment and Conservation (TDEC) or the Environmental Protection Agency (EPA). This requirement shall also apply to documentation associated with any BMPs established in connection with a pretreatment standard. ..... (l) Duration of Permit. Wastewater discharge permits normally are issued for a period of three (3) years. Permits may be issued for a period of less than three (3) years for the administrative convenience of the director so as to stagger the renewal dates of the permits. Provided further that permits issued to industrial users granted an exception pursuant to Section 31-52 shall be issued for a period of one (1) year. Notwithstanding the foregoing, industrial users becoming subject to a national pretreatment standard shall apply for new permits on the effective date of such national pretreatment standards. The director shall notify in writing any industrial user whom he has cause to believe is subject to a national pretreatment standard of the promulgation of such federal regulations, but any failure of the director in this regard shall not relieve the industrial user of the duty of complying with such national pretreatment standards. An industrial user must apply in writing for a renewal permit within the period of time not more than ninety (90) days and not less than thirty (30) days prior to expiration of the current permit. Provided further that limitations or conditions of a permit are subject to modification in accordance with Section 31-53(o), industrial users shall be notified of any proposed changes in their permit by the director at least thirty (30) days prior to the effective date of the change. Any change or new condition in a permit shall include a provision for a reasonable time schedule for compliance. The industrial user may appeal the decision of the director in regard to any changed permit conditions as otherwise provided in this article. Wastewater discharge permits are voidable upon nonuse, cessation of operations, or transfer of business ownership. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit. ..... (m) Transfer of a Permit. Wastewater discharge permits are issued to a specific industrial user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, or for different premises, or a new or changed operation, without the prior approval of the director. The new owner or operator must state to the director that it plans no change to the facility's operations and processes must provide the specific date on which the transfer is to occur, and agree that the new owner/user shall assume responsibility for all Wastewater Discharge Permit requirements. Upon approval of a permit transfer, the director will provide the new owner or operator with a copy of the wastewater discharge permit. ..... (n) Revocation of Permit. Any permit issued under the provisions of this article is subject to be modified, suspended, or revoked in whole or in part during its term for cause including but not limited to, the following: ..... (1) Violation of any terms or conditions of the wastewater discharge permit or other applicable law or regulation; ..... (2) Obtaining of a permit by misrepresentation or failure to disclose fully all relevant facts; or ..... (3) A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge. ..... (4) Refusal of reasonable access to the user's premise for the purpose of inspection or monitoring. ..... (5) Failure to notify the director of significant changes to the wastewater prior to changed discharge; ..... (6) Falsifying self-monitoring reports and certification statements; ..... (7) Tampering with monitoring equipment; ..... (8) Failure to comply with the requirements of an enforcement notice or order; ..... (9) Operating with an expired wastewater discharge permit (unless timely application for renewal has been submitted); or ..... (10) Failure to provide advance notice of the transfer of business ownership. ..... (o) Modification of Permit. The director may modify an individual wastewater discharge permit for good cause, including but not limited to, the following: ..... (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; ..... (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of the individual wastewater discharge permit issuance; ..... (3) A change in the POTW that requires either a temporary or a permanent reduction of the authorized discharge; ..... (4) Information indicating that the permitted discharge poses a threat to the POTW, City personnel, or the receiving waters; ..... (5) Violation of the terms or conditions of the wastewater discharge permit; ..... (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in required reporting; ..... (7) Revision or a grant of a variance from categorical pretreatment standards; ..... (8) To correct typographical or other errors in the wastewater discharge permit; or ..... (9) To reflect transfer of facility ownership or operation to a new owner or operator. ..... (p) Electronic Reporting. Electronic reporting, if allowed by the director shall comply with the requirements of 40 CFR Part 3. .....
(Ord. No. 9409, § 2, 6-5-90; Ord. No. 12428, § 4, 8-31-10; Ord. No. 12962, § 4, 6-16-15; Ord. No. 13172, §§ 6, 7, 4-18-17)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
